BLD-Final | 4/4/2017 | 4/5/2017 | 4/5/2017 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Edward Cavey
|
DOC - Permit Finaled | 4/5/2017 | 4/5/2017 | 4/5/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Foundation | 10/20/2016 | 10/21/2016 | 10/21/2016 | P | PASS |
Dave Hannah
|
|
|
Edward-walls Phone #: ###-####
|
BLD-Other | 10/6/2016 | 10/6/2016 | 10/7/2016 | P | PASS |
Dave Hannah
|
|
|
Footing inspection Phone #: ###-#### Inspection requested via web by Edward Cavey. note I talked with homeowner doing the work its ok to use cmu for foundation walls
|
OVERRIDE | | | 10/3/2016 | | |
|
|
|
|
Plan assigned to (BJM) | 9/30/2016 | 9/30/2016 | 10/3/2016 | | DONE |
Brian McGowan
|
|
|
|
Telephone call | | | 10/3/2016 | | DONE |
|
|
|
called Laurie, spoke with Edward- told him permit is ready and fees due
|
Issue PAID IN FULL permit | | | 10/3/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/30/2016 | | 10/3/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 10/3/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 10/3/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/3/2016 | | DONE |
Brian McGowan
|
|
|
Energy No ESC Yes
|
Permit Ready to Issue | | | 10/3/2016 | | DONE |
|
|
|
NEED GC form
|
Routing Walk-In (BLD) | 9/30/2016 | 9/30/2016 | 9/30/2016 | A | CANC |
Brian McGowan
|
|
|
Brian took in plans
|
Routing Walk-In (Zoning) | 9/29/2016 | 9/29/2016 | 9/29/2016 | P | PASS |
Ted Vanegas
|
|
|
|
Routing Walk-In (BLD) | 9/29/2016 | 9/29/2016 | 9/29/2016 | P | FAIL |
Brian McGowan
|
|
|
Wanted to use 8" CMU for foundation stem wall. Engineering is required. Special Inspections are required. Decided to do a 6" concrete stem wall instead. Will modify plans and return tomorrow.
|
1st review completed | | | 9/29/2016 | | FAIL |
Brian McGowan
|
|
|
|
Application received | | 9/29/2016 | | | |
|
|
|
|