Second Notice | | 8/12/2017 | 8/2/2017 | | DONE |
|
|
|
This permit finaled on the web by Jeremy Barber
|
First Notice | | 8/12/2017 | 8/2/2017 | | DONE |
|
|
|
|
Permanent Occupancy | | | 8/2/2017 | | DONE |
|
|
|
|
BLD-Final | 7/31/2017 | 8/1/2017 | 8/1/2017 | A | PASS |
Dave Hannah
|
|
|
Please call Jody Wise ###-#### for access to pool area 20 minutes before you arrive to inspect. Thanks Phone #: ###-#### Inspection requested via web by Jody Wise
|
Routing PW Drainage | 8/1/2017 | | 8/1/2017 | | PASS |
|
|
|
NO SYSTEMS NO INSPECTIONS NEED NO O AND M
|
Zoning Approval | 7/31/2017 | 7/31/2017 | 7/31/2017 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Final | 5/24/2017 | 5/26/2017 | 5/26/2017 | A | PART |
Jim Storey
|
|
|
Please call Phone #: ###-#### Inspection requested via web by Jody Wise temp ok for padio and storage area/ protection under sink to be instaled for ada/ pending walk way and zoning
|
FIRE-Final Inspection | 5/24/2017 | 5/25/2017 | 5/25/2017 | A | PASS |
Jim Page
|
|
|
Fial life fire safety inspection passed/complete
|
CHANGE STATUS TO (ISS) | | | 5/23/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 5/23/2017 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 4/20/2017 | 4/20/2017 | 4/21/2017 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 4/20/2017 | | 4/21/2017 | | PASS |
Carl Westfall
|
|
|
1st plan mod
|
Plan Reviewer's activity | | | 4/21/2017 | | DONE |
|
|
|
Completed the plan mod and sent to the permits desk
|
Permit Ready to Issue | | | 4/21/2017 | | DONE |
|
|
|
plan mod ONLY - DO NOT RE-ISSUE
|
Plan Modification Accepted | | | 4/20/2017 | | DONE |
Christina Prado
|
|
|
Plan Mod to modify the location of exterior ramp, stairs & dock at beach area
|
BLD-Energy code compliance | 3/9/2017 | 3/10/2017 | 3/10/2017 | A | PASS |
Dave Hannah
|
|
|
Jody Wise ###-#### please give mea call Phone #: ###-#### Inspection requested via web by Jody Wise
|
BLD-Framing/Rough-in | 2/24/2017 | 2/27/2017 | 2/27/2017 | A | PASS |
Dave Hannah
|
|
|
I''m after a shear wall inspection at the watercraft shed. Thanks. Phone #: ###-#### Inspection requested via web by Jody Wise
|
BLD-Framing/Rough-in | 2/20/2017 | 2/21/2017 | 2/21/2017 | A | PART |
Jim Sly
|
|
|
Shear wall inspection. I need you to look at a wall before I cover it with another wall at the mail center. Thanks Jody Wise ###-#### Phone #: ###-#### Inspection requested via web by Jody Wise
West wall Mail center shear nailing....OK.
|
BLD-Foundation | 12/13/2016 | 12/14/2016 | 12/19/2016 | A | PASS |
Dave Hannah
|
|
|
MTI inspecting rebar and compaction Phone #: ###-#### Inspection requested via web by Jody Wise
|
BLD-Footing | 12/7/2016 | 12/8/2016 | 12/9/2016 | A | PEND |
Dave Hannah
|
|
|
MTI scheduled for inspection of compaction test, rebar inspection and concrete test. Phone #: ###-#### Inspection requested via web by Jody Wise ok after mti sign off
|
Issue PAID IN FULL permit | | | 11/21/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/21/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/15/2016 | | DONE |
Christina Prado
|
|
|
***MET 11/18/16 CAN***Need RP, GC Form & Revised Certificate of Value for issuance
|
Plan assigned to (CJW) | 10/3/2016 | 10/3/2016 | 11/14/2016 | | PASS |
Carl Westfall
|
|
|
(1st done) (Oct 21 - 15 days) whitewater apts outdoor kitchen and watercraft shop
|
Routing - Design Review | 11/1/2016 | | 11/14/2016 | | PASS |
Andrea Tuning
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/14/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/1/2016 | | 11/9/2016 | | PASS |
Carl Westfall
|
|
|
|
Routing Off Site - STRUCTURAL | 11/1/2016 | | 11/8/2016 | | PASS |
Carl Westfall
|
|
|
Chris Merrill
|
Plan resubmittals received | | | 11/1/2016 | | DONE |
|
|
|
|
Route to Impact Fee Review | 10/20/2016 | 10/23/2016 | 10/21/2016 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 10/20/2016 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 10/20/2016 | | DONE |
|
|
|
|
Routing PW Drainage | 10/3/2016 | | 10/19/2016 | | FAIL |
Brian Murphy
|
|
|
need drainage letter
|
Routing - PLAN CHECK | 10/3/2016 | | 10/17/2016 | | PEND |
Carl Westfall
|
|
|
Pending approval by the Consultant Structural Engineer.
|
Routing Off Site - STRUCTURAL | 10/3/2016 | | 10/17/2016 | | FAIL |
Carl Westfall
|
|
|
Chris Merrill (Stapley)
|
Routing PW Environmental | 10/3/2016 | | 10/10/2016 | | PASS |
Rick Christenson
|
|
|
|
Routing - PLUMBING | 10/3/2016 | | 10/10/2016 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - MECHANICAL | 10/3/2016 | | 10/7/2016 | | PASS |
Troy James
|
|
|
Gas piping and any mechanical work shall be field verified for code compliance.
|
Routing - PLANNING Land Div | 10/3/2016 | | 10/6/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - Erosion and Sediment | 10/3/2016 | | 10/4/2016 | | PASS |
Andy J. Long
|
|
|
ESC site map and plan narrative submitted and approved. Valid Plan Designer designated, RP to be list with contract award. Pre-construction ESC BMP installation and inspection required, call ###-#### or ###-####.
|
Routing - FIRE | 10/3/2016 | 10/3/2016 | 10/3/2016 | | PASS |
Katie Marron
|
|
|
no comments required
|
Routing - Addressing | 10/3/2016 | | 10/3/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 10/3/2016 | | 10/3/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 10/3/2016 | | 10/3/2016 | | FAIL |
Andrea Tuning
|
|
|
The applicant has not submitted a floodplain application for review and approval.
|
Intake Approval | | | 10/3/2016 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 9/30/2016 | | FAIL |
Javier Guzman
|
|
|
Please provide the following document (Incomplete checklist submittals will not be accepted):
A completely filled out Form #310 is required and needs to be signed/stamped/dated by an Idaho licensed engineer, form 310 can be found at our website at http://pds.cityofboise.org/home/documents/apps/300/
|
Intake Approval | | | 9/30/2016 | | FAIL |
Javier Guzman
|
|
|
Please provide the following document (Incomplete checklist submittals will not be accepted):
Please completely filled out Form #310 cover sheet
|
Application received | | | 9/29/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 29 2016 2:58PM
|