Third Notice | | 1/17/2018 | 1/18/2018 | | DONE |
|
|
|
This permit finaled on the web by derek cooper
|
Third Notice | | 12/17/2017 | 1/12/2018 | | DONE |
|
|
|
Mailed 1-12-18
|
Second Notice | | 11/24/2017 | 12/12/2017 | | DONE |
|
|
|
Mailed 12-13-17
|
First Notice | 10/13/2017 | 10/13/2017 | 11/14/2017 | | DONE |
Jim Sly
|
|
|
Mailed 11-15-17
|
BLD-Final | 10/12/2017 | 10/13/2017 | 10/13/2017 | A | PASS |
Jim Sly
|
|
|
plans will be on site, call with any questions// Kirk Phone #: ###-####
|
DOC - Permit Finaled | 10/13/2017 | 10/13/2017 | 10/13/2017 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 10/12/2017 | 10/12/2017 | 10/12/2017 | P | FAIL |
Troy Cobbley
|
|
|
Repair the exit sign/emergency light and remove the thumb turn deadbolt at the exit door.
|
BLD-Framing/Rough-in | 4/21/2017 | 4/24/2017 | 4/24/2017 | A | PEND |
Jim Sly
|
|
|
Curtis Phone #: ###-#### Talked to Contractor....Bring plans and Engineering when calling for final inspection.
|
CHANGE STATUS TO (ISS) | | | 4/21/2017 | | DONE |
|
|
|
plan mod fees paid
|
Plan assigned to (JG) | 3/13/2017 | 3/13/2017 | 4/12/2017 | | PASS |
Javier Guzman
|
|
|
1st rev comp, Plan mod The Human Bean ePlan, Pend engineering
|
Routing - PLAN CHECK | 4/11/2017 | | 4/12/2017 | | PASS |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 4/11/2017 | | 4/12/2017 | | PASS |
Javier Guzman
|
|
|
Passed in ePlan by AHJ Engineers Keith Jones
|
Permit Ready to Issue | | | 4/12/2017 | | DONE |
|
|
|
DO NOT REISSUE PLAN MOD
|
Routing Off Site - STRUCTURAL | 3/13/2017 | | 4/5/2017 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by AHJ Engineers Keith Jones
|
Routing - PLAN CHECK | 3/13/2017 | | 3/16/2017 | | PASS |
Javier Guzman
|
|
|
|
Routing - Design Review | 3/13/2017 | | 3/16/2017 | | PASS |
Sarah Schafer
|
|
|
Change of metal canopy to trim in barn wood is approved through the building permit.
|
Route to Impact Fee Review | 3/10/2017 | 3/13/2017 | 3/13/2017 | | PASS |
Tonya Wallace
|
|
|
Review requested for Commercial Permit
|
Plan Modification Accepted | | | 3/10/2017 | | DONE |
|
|
|
changes being made to the awnings
|
Issue PAID IN FULL permit | | | 3/1/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/1/2017 | | DONE |
|
|
|
|
Plan assigned to (JG) | 10/5/2016 | 10/5/2016 | 11/2/2016 | | PASS |
Javier Guzman
|
|
|
1st review completed, 10/18 L2 Human Bean ePlan
|
Routing - PLAN CHECK | 10/25/2016 | | 11/2/2016 | | PASS |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 10/25/2016 | | 11/2/2016 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by AHJ Engineers Keith Jones
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/2/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/2/2016 | | DONE |
Christina Prado
|
|
|
All met 3/1/17 C_P //// NEED GC form and certificate of value
|
Routing Off Site - STRUCTURAL | 10/13/2016 | | 10/14/2016 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by AHJ Engineers Keith Jones
|
1st review completed | | | 10/14/2016 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 10/5/2016 | | 10/13/2016 | | FAIL |
Javier Guzman
|
|
|
|
Routing - Design Review | 10/5/2016 | | 10/6/2016 | | PASS |
Sarah Schafer
|
|
|
Approved per DRH16-00383
|
Intake Approval | | | 10/5/2016 | | PASS |
Javier Guzman
|
|
|
|
Application received | | | 9/30/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 30 2016 1:06PM
|