Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD16-03645
StatusFinaled
Name BRIGHTON STUDIO INC
Site Address 3252 E THOROUGHBRED LN
Project NamePP-03-72
Customer NumberBLD16-03643, 03645, 03646, 03647
ePlanReview 
Description
(4 PERMITS TOTAL FILED UNDER BLD16-03643 IN EPLANREVIEW)Permit for the construction of a new 1920 sq. ft., three story (first story 190 sq. ft., second story 860 sq. ft., third story 870 sq. ft.) Townhouse with 3 bedrooms, 2.5 bathrooms, and a 605 sq. ft. attached garage per the approved plans, ResCheck, engineering, ACCA report and any notations. SP-02 zoning and setbacks per planning. //le
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/7/20176/8/20176/9/2017PPASS
DetailsBrandon Shaw
Garage will be left open Phone #: ###-#### Inspection requested via web by Will Hill
DOC - Permit Finaled6/9/20176/9/20176/9/2017PPASS
DetailsBrandon Shaw
BLD-Energy code compliance3/27/20173/27/20173/27/2017PPASS
DetailsJim Sly
Inspection requested via web by Erby Gonzales
BLD-Framing/Rough-in3/20/20173/20/20173/20/2017PPASS
DetailsJim Sly
Plans on site Inspection requested via web by Erby Gonzales
BLD-Framing/Rough-in3/17/20173/17/20173/17/2017PFAIL
DetailsDave Hannah
Plans/ engineering at garage Inspection requested via web by Erby Gonzales air seal done no inspection done
BLD-Wall Bracing2/21/20172/21/20172/21/2017PPASS
DetailsJim Sly
Exterior Sheer plans on site Inspection requested via web by Erby Gonzales
BLD-Foundation12/1/201612/1/201612/1/2016PPASS
DetailsPhil Shearer
doug Phone #: ###-####
BLD-Footing11/28/201611/28/201611/28/2016PPASS
DetailsPhil Shearer
Doug Phone #: ###-####
Issue PAID IN FULL permit  10/31/2016 DONE
Inspection Record Card- Bld  10/31/2016 DONE
OVERRIDE  10/21/2016  
Plan assigned to (LEG) Tisha10/3/2016 10/21/2016 DONE
DetailsTisha Gallop
10/20 L2 townhouse
Routing - PLAN CHECK10/3/2016 10/21/2016 PASS
DetailsTisha Gallop
LOMR
1st review completed  10/21/2016 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/21/2016 DONE
Permit Ready to Issue  10/21/2016 DONE
All requirements met
Routing - MECHANICAL10/3/2016 10/7/2016 PASS
DetailsTroy James
Routing - PLANNING10/3/2016 10/7/2016 PASS
DetailsJosh Wilson
Routing - Addressing10/3/2016 10/3/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS10/3/2016 10/3/2016 PASS
DetailsRachael Beierle
Plans ACCEPTED BY PLAN TECH  10/3/2016 DONE
Intake Approval  10/3/2016 PASS
Recd Pcfee & Taken To Pln CK  10/3/2016 DONE
DetailsChristina Prado
Application received 10/3/2016