BLD-Final | 7/21/2017 | 7/21/2017 | 7/21/2017 | P | PASS |
Tony Young
|
|
|
Please call 1/2 prior. Thanks Jim Phone #: ###-#### Inspection requested via web by James Larkin
|
DOC - Permit Finaled | 7/21/2017 | 7/21/2017 | 7/21/2017 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 7/20/2017 | 7/21/2017 | 7/21/2017 | A | CANC |
Tony Young
|
|
|
Please call 1/2 hr prior. Thanks Jim Phone #: ###-#### >> Inspection requested via web by James Larkin Inspection cancelled from web by: James Larkin
|
PubWorks Occupancy Approval | 7/20/2017 | 7/20/2017 | 7/20/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Energy code compliance | 4/12/2017 | 4/12/2017 | 4/12/2017 | P | PASS |
Tony Young
|
|
|
please call Jim 1/2 hr prior.
Thanks Phone #: ###-#### Inspection requested via web by James Larkin
|
BLD-Framing/Rough-in | 4/7/2017 | 4/7/2017 | 4/7/2017 | P | PART |
Tony Young
|
|
|
Please also inspect sheetrock layer at soffits. Please call Brian at ###-#### prior to inspection. Phone #: ###-#### Inspection requested via web by Brian Stark,, needs sprinkler pass,, ok to insulate
|
BLD-Framing/Rough-in | 4/4/2017 | 4/4/2017 | 4/4/2017 | P | NR |
Tony Young
|
|
|
Please call 1/2 hr prior
Thanks Phone #: ###-#### Inspection requested via web by James Larkin,, walk through frame conf only.. see paint marks
|
BLD-Wall Bracing | 3/14/2017 | 3/15/2017 | 3/15/2017 | A | PASS |
Tony Young
|
|
|
Jim Phone #: ###-####,, exterior shear ok
|
Plan Modification Accepted | | | 3/15/2017 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 3/15/2017 | | 3/15/2017 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 3/14/2017 | 3/14/2017 | 3/14/2017 | P | CANC |
Tony Young
|
|
|
Call half hour before.... Shear // Jim Phone #: ###-####
|
BLD-Wall Bracing | 3/9/2017 | 3/10/2017 | 3/10/2017 | P | NR |
Tony Young
|
|
|
SHear // Jim Phone #: ###-####,, needs to re-nail
|
BLD-Conference | 1/25/2017 | 1/26/2017 | 1/26/2017 | A | PASS |
Tony Young
|
|
|
wall between properties,, issue,, rock wall is complete and appears to be stable
|
BLD-Foundation | 11/27/2016 | 11/28/2016 | 11/28/2016 | A | PASS |
Phil Shearer
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 11/22/2016 | 11/22/2016 | 11/22/2016 | A | PASS |
Phil Shearer
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 11/20/2016 | 11/21/2016 | 11/21/2016 | P | PASS |
Phil Shearer
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
PubWorks Subgrade Approval | 11/21/2016 | 11/21/2016 | 11/21/2016 | | DONE |
Jason C. Taylor
|
|
|
**MAIN RESIDENCE, GARAGE, AND EAST RETAINING WALL FOOTINGS***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 11/17/2016 | 11/18/2016 | 11/18/2016 | P | NR |
Tony Young
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, needs soils report 1st,, no inspection
|
OVERRIDE | | | 11/17/2016 | | |
|
|
|
|
Plan assigned to (BJM) | 10/7/2016 | 10/7/2016 | 11/17/2016 | | DONE |
Brian McGowan
|
|
|
Due 10-21 Level 2, FAIL - Foundation Plan must meet Hillside submittal requirements. No WUI Details provide or called out. Misc items as well fail.
|
Routing - PLAN CHECK | | | 11/17/2016 | | PASS |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 11/17/2016 | | DONE |
|
|
|
|
Telephone call | | | 11/17/2016 | | DONE |
|
|
|
called James- told him permit is ready
|
Issue PAID IN FULL permit | | | 11/17/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/17/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/17/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 11/17/2016 | | DONE |
|
|
|
All Met
|
Routing PW Grading-Hillside | 11/16/2016 | | 11/16/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plan resubmittals received | | | 11/15/2016 | | DONE |
|
|
|
Five copies of sheet C2.0 taken to Brian Mc
|
Routing PW Grading-Hillside | 11/14/2016 | | 11/14/2016 | | FAIL |
Jason C. Taylor
|
|
|
Need plans signed by design engineer and also need 3 copies of grading plan as shown on the permit checklist. JCT
|
Plan resubmittals received | | | 11/3/2016 | | DONE |
|
|
|
received 2 extra copies of sheet C2.0(grading plan), engineering, and retaining wall calcs for Jason Taylor. Also received two copies of sheets 7.2 and 7.3- gave everything to Brian
|
Plan resubmittals received | | | 10/26/2016 | | DONE |
|
|
|
Two copies of Calc for garage and retaining wall, two copies of sheet 1, 2, 2.1, 3, 3.1, 4, 4.1, 5, 5.1, 6, 7, 7.1, 8, 9, 10, 11 and C2.0 taken to Brian Mc
|
Routing - PLAN CHECK | 10/13/2016 | | 10/19/2016 | | FAIL |
Brian McGowan
|
|
|
|
1st review completed | | | 10/19/2016 | | FAIL |
Brian McGowan
|
|
|
Foundation Plan must meet Hillside submittal requirements. No WUI Details provide or called out. Misc items as well fail.
|
Routing - FIRE | 10/12/2016 | | 10/13/2016 | | PASS |
Scott Arellano
|
|
|
Fire Sprinklers are required. A separate fire sprinkler permit is required. All portions of this structure shall comply with the provisions of BMC 7-01-69 section 4920 for defensible space for wildland fire, and are subject to Fire Department inspection.
|
Routing - Erosion and Sediment | 10/11/2016 | | 10/12/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan approved, narrative included on site plan sheet. Valid RP & PD designated. Site preparation inspection required, call ###-#### or ###-####
|
Routing - PLANNING | 10/7/2016 | | 10/11/2016 | | PASS |
Jeff Lowe
|
|
|
Condition of Approval No. 2 states rear setback may be 15-feet on average from top of slope. Conferred with Jason T. that proposed patio cover post complies with intent.
|
Routing - MECHANICAL | 10/11/2016 | | 10/11/2016 | | PASS |
Troy James
|
|
|
|
Plan assigned to (LEG) Tisha | 10/4/2016 | | 10/7/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Routing PW Grading-Hillside | 10/4/2016 | | 10/7/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PUBLIC WORKS | 10/7/2016 | | 10/7/2016 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/4/2016 | | DONE |
|
|
|
|
Intake Approval | | | 10/4/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/4/2016 | | DONE |
|
|
|
|
Routing - Addressing | 10/4/2016 | | 10/4/2016 | | PASS |
Laura Hunter
|
|
|
|
Application received | | 10/3/2016 | | | |
|
|
|
|