Information based on query as of Sunday, June 23, 2024.
Permit Information
Permit NumberBLD16-03657
StatusFinaled
Name PARADIGM CONSTRUCTION COMPANY LLC
Site Address 3684 W QUAIL HOLLOW CT
Project Name3684 Quail Hollow CT
Customer Number 
ePlanReviewNo
Description
Fire Sprinklers are required. A separate fire sprinkler permit is necessary. WUI Zone "A", Class "A" roof required. Permit for the construction of a new 4,405 sq. ft., two story (main level 2,534 sq. ft., upper level 1,871 sq. ft.) single family dwelling with 3 bedrooms, 4 and a half bathrooms, approximately 772 sq. ft. of covered patio/porch and a 829 sq. ft. attached garage per the approved plans, plan review report and any notations. A-1 zoning and setbacks per planning. **BJM** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/21/20177/21/20177/21/2017PPASS
DetailsTony Young
Please call 1/2 prior. Thanks Jim Phone #: ###-#### Inspection requested via web by James Larkin
DOC - Permit Finaled7/21/20177/21/20177/21/2017PPASS
DetailsTony Young
c of o issued
BLD-Final7/20/20177/21/20177/21/2017ACANC
DetailsTony Young
Please call 1/2 hr prior. Thanks Jim Phone #: ###-#### >> Inspection requested via web by James Larkin Inspection cancelled from web by: James Larkin
PubWorks Occupancy Approval7/20/20177/20/20177/20/2017 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Energy code compliance4/12/20174/12/20174/12/2017PPASS
DetailsTony Young
please call Jim 1/2 hr prior.

Thanks Phone #: ###-#### Inspection requested via web by James Larkin
BLD-Framing/Rough-in4/7/20174/7/20174/7/2017PPART
DetailsTony Young
Please also inspect sheetrock layer at soffits. Please call Brian at ###-#### prior to inspection. Phone #: ###-#### Inspection requested via web by Brian Stark,, needs sprinkler pass,, ok to insulate
BLD-Framing/Rough-in4/4/20174/4/20174/4/2017PNR
DetailsTony Young
Please call 1/2 hr prior

Thanks Phone #: ###-#### Inspection requested via web by James Larkin,, walk through frame conf only.. see paint marks
BLD-Wall Bracing3/14/20173/15/20173/15/2017APASS
DetailsTony Young
Jim Phone #: ###-####,, exterior shear ok
Plan Modification Accepted  3/15/2017 DONE
new manual j report
Routing - MECHANICAL3/15/2017 3/15/2017 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall Bracing3/14/20173/14/20173/14/2017PCANC
DetailsTony Young
Call half hour before.... Shear // Jim Phone #: ###-####
BLD-Wall Bracing3/9/20173/10/20173/10/2017PNR
DetailsTony Young
SHear // Jim Phone #: ###-####,, needs to re-nail
BLD-Conference1/25/20171/26/20171/26/2017APASS
DetailsTony Young
wall between properties,, issue,, rock wall is complete and appears to be stable
BLD-Foundation11/27/201611/28/201611/28/2016APASS
DetailsPhil Shearer
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing11/22/201611/22/201611/22/2016APASS
DetailsPhil Shearer
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing11/20/201611/21/201611/21/2016PPASS
DetailsPhil Shearer
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
PubWorks Subgrade Approval11/21/201611/21/201611/21/2016 DONE
DetailsJason C. Taylor
**MAIN RESIDENCE, GARAGE, AND EAST RETAINING WALL FOOTINGS***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
BLD-Footing11/17/201611/18/201611/18/2016PNR
DetailsTony Young
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, needs soils report 1st,, no inspection
OVERRIDE  11/17/2016  
Plan assigned to (BJM)10/7/201610/7/201611/17/2016 DONE
DetailsBrian McGowan
Due 10-21 Level 2, FAIL - Foundation Plan must meet Hillside submittal requirements. No WUI Details provide or called out. Misc items as well fail.
Routing - PLAN CHECK  11/17/2016 PASS
DetailsBrian McGowan
Inspection Record Card- Bld  11/17/2016 DONE
Telephone call  11/17/2016 DONE
called James- told him permit is ready
Issue PAID IN FULL permit  11/17/2016 DONE
Case Summary (BLD)  11/17/2016 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  11/17/2016 DONE
DetailsBrian McGowan
Permit Ready to Issue  11/17/2016 DONE
All Met
Routing PW Grading-Hillside11/16/2016 11/16/2016 PASS
DetailsJason C. Taylor

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Plan resubmittals received  11/15/2016 DONE
Five copies of sheet C2.0 taken to Brian Mc
Routing PW Grading-Hillside11/14/2016 11/14/2016 FAIL
DetailsJason C. Taylor
Need plans signed by design engineer and also need 3 copies of grading plan as shown on the permit checklist. JCT
Plan resubmittals received  11/3/2016 DONE
received 2 extra copies of sheet C2.0(grading plan), engineering, and retaining wall calcs for Jason Taylor. Also received two copies of sheets 7.2 and 7.3- gave everything to Brian
Plan resubmittals received  10/26/2016 DONE
Two copies of Calc for garage and retaining wall, two copies of sheet 1, 2, 2.1, 3, 3.1, 4, 4.1, 5, 5.1, 6, 7, 7.1, 8, 9, 10, 11 and C2.0 taken to Brian Mc
Routing - PLAN CHECK10/13/2016 10/19/2016 FAIL
DetailsBrian McGowan
1st review completed  10/19/2016 FAIL
DetailsBrian McGowan
Foundation Plan must meet Hillside submittal requirements. No WUI Details provide or called out. Misc items as well fail.
Routing - FIRE10/12/2016 10/13/2016 PASS
DetailsScott Arellano
Fire Sprinklers are required. A separate fire sprinkler permit is required. All portions of this structure shall comply with the provisions of BMC 7-01-69 section 4920 for defensible space for wildland fire, and are subject to Fire Department inspection.
Routing - Erosion and Sediment10/11/2016 10/12/2016 PASS
DetailsAndy J. Long
ESC plan approved, narrative included on site plan sheet. Valid RP & PD designated. Site preparation inspection required, call ###-#### or ###-####
Routing - PLANNING10/7/2016 10/11/2016 PASS
DetailsJeff Lowe
Condition of Approval No. 2 states rear setback may be 15-feet on average from top of slope. Conferred with Jason T. that proposed patio cover post complies with intent.
Routing - MECHANICAL10/11/2016 10/11/2016 PASS
DetailsTroy James
Plan assigned to (LEG) Tisha10/4/2016 10/7/2016 DEFR
DetailsTisha Gallop
Routing PW Grading-Hillside10/4/2016 10/7/2016 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - PUBLIC WORKS10/7/2016 10/7/2016 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  10/4/2016 DONE
Intake Approval  10/4/2016 PASS
Recd Pcfee & Taken To Pln CK  10/4/2016 DONE
Routing - Addressing10/4/2016 10/4/2016 PASS
DetailsLaura Hunter
Application received 10/3/2016