BLD-Aging Inspection | 2/23/2017 | 2/23/2017 | 2/24/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 2/22/2017 | 2/22/2017 | 2/24/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Foundation | 10/10/2016 | 10/11/2016 | 10/11/2016 | A | PASS |
Jim Sly
|
|
|
Larry-pour time 11:00 Phone #: ###-####
|
BLD-Footing | 10/6/2016 | 10/7/2016 | 10/7/2016 | A | PASS |
Jim Sly
|
|
|
Larry Phone #: ###-####
|
OVERRIDE | | | 10/6/2016 | | |
|
|
|
|
Plan assigned to (DAF) | 10/5/2016 | 10/5/2016 | 10/6/2016 | | DONE |
David Ferguson
|
|
|
due 10/10
|
Routing - Erosion and Sediment | 10/5/2016 | | 10/6/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. Valid RP. Site prep inspection required, call ###-#### or ###-####
|
Routing - PLAN CHECK | 10/6/2016 | | 10/6/2016 | | PASS |
David Ferguson
|
|
|
|
1st review completed | | | 10/6/2016 | | DONE |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 10/6/2016 | | DONE |
David Ferguson
|
|
|
|
Inspection Record Card- Bld | | | 10/6/2016 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/6/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/6/2016 | | DONE |
|
|
|
all requirments met
|
Issue PAID IN FULL permit | | | 10/6/2016 | | DONE |
|
|
|
|
PubWorks Subgrade Approval | 10/5/2016 | 10/5/2016 | 10/5/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Routing Walk-In (Zoning) | 10/4/2016 | 10/4/2016 | 10/4/2016 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 10/4/2016 | 10/4/2016 | 10/4/2016 | P | FAIL |
David Ferguson
|
|
|
Jason T. is ok with a subgrade inspection before the contractor pours concrete and has signed off in Tidemark. Failed because a ESC Waiver Letter needs to be part of the submittal documents. **DAF**
|
Routing Walk-In (PW Hillside) | 10/4/2016 | 10/4/2016 | 10/4/2016 | P | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Application received | | 10/4/2016 | | | |
|
|
|
|