BLD-Aging Inspection | 8/22/2017 | 8/22/2017 | 8/23/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 8/21/2017 | 8/21/2017 | 8/23/2017 | | PEND |
Tony Young
|
|
|
|
Routing Walk-In (BLD) | 10/6/2016 | 10/6/2016 | 10/6/2016 | A | PASS |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 10/6/2016 | | 10/6/2016 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 10/6/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/6/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/6/2016 | | DONE |
|
|
|
all requirments met
|
Issue PAID IN FULL permit | | | 10/6/2016 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 10/5/2016 | 10/5/2016 | 10/5/2016 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 10/5/2016 | 10/5/2016 | 10/5/2016 | A | FAIL |
Brian McGowan
|
|
|
|
1st review completed | | | 10/5/2016 | | FAIL |
Brian McGowan
|
|
|
Panels being installed onto a metal roof. Specific engineering required for S-5 attachments based on the specific roofing.
|
Application received | | 10/5/2016 | | | |
|
|
|
|