BLD-Final | 8/11/2017 | 8/14/2017 | 8/14/2017 | P | PASS |
Jim Storey
|
|
|
House should be unlocked -- please call if there are any problems or questions. Thanks, Kim Phone #: ###-#### Inspection requested via web by Kim Winkle
|
DOC - Permit Finaled | 8/14/2017 | 8/14/2017 | 8/14/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 8/9/2017 | 8/11/2017 | 8/11/2017 | P | DEFR |
Jim Storey
|
|
|
House should be unlocked -- please call if there are any problems or questions. Thanks, Kim Phone #: ###-#### Inspection requested via web by Kim Winkle
|
BLD-Final | 8/2/2017 | 8/9/2017 | 8/9/2017 | A | NR |
Jim Storey
|
|
|
Final for C of O. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
BLD-Conference | 8/2/2017 | 8/2/2017 | 8/2/2017 | P | PART |
Jim Storey
|
|
|
Mike Phone #: ###-#### stairs not ready ok to move belongs in no sleep over
|
BLD-Other | 5/1/2017 | 5/2/2017 | 5/2/2017 | A | PASS |
Jim Storey
|
|
|
Need an inspection of the Sheetrock Sheer areas please. Phone #: ###-#### Inspection requested via web by Kim Winkle
|
BLD-Framing/Rough-in | 4/25/2017 | 4/25/2017 | 4/26/2017 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Kim Winkle ok to cover but stiar framing is in questen dont know finishes need to be checked at final ?
|
BLD-Energy code compliance | 4/24/2017 | 4/25/2017 | 4/25/2017 | A | FAIL |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kim Winkle
|
BLD-Framing/Rough-in | 4/14/2017 | 4/17/2017 | 4/17/2017 | P | FAIL |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Kim Winkle c/n posted
|
BLD-Framing/Rough-in | 4/14/2017 | 4/17/2017 | 4/14/2017 | A | CANC |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kim Winkle Inspection cancelled from web by: Kim Winkle
|
BLD-Wall Bracing | 3/29/2017 | 3/30/2017 | 3/30/2017 | A | DONE |
Mike Jordan
|
|
|
Need a re-inspect sheet inspection please. Phone #: ###-#### Inspection requested via web by Kim Winkle. Per framer, blocking in portal frame oriantation fixed.
|
BLD-Wall Bracing | 3/22/2017 | 3/24/2017 | 3/24/2017 | P | PART |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Kim Winkle
|
BLD-Footing | 1/24/2017 | 1/25/2017 | 1/25/2017 | A | PART |
Jim Sly
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron Footing will pass if the following items are verified. Heron, concrete contractor says he will supply supplimental heat. Ave daily Temp approx. 20 degrees. Talked to Kim at Syringa. Need to verify that fill at garage front area was compacted and tested.
|
BLD-Footing | 12/13/2016 | 12/13/2016 | 12/13/2016 | A | PART |
Jim Storey
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron north/west ft and west window wells
|
BLD-Foundation | 11/28/2016 | 11/29/2016 | 11/29/2016 | A | PASS |
Jim Storey
|
|
|
As early as possible Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 11/17/2016 | 11/17/2016 | 11/17/2016 | P | PASS |
Dave Hannah
|
|
|
Steve// Ricardo Phone #: ###-####/ ###-####
|
BLD-Conference | 11/16/2016 | 11/17/2016 | 11/17/2016 | P | CANC |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
OVERRIDE | | | 11/17/2016 | | |
|
|
|
|
Plan assigned to (DAF) | 11/17/2016 | 11/17/2016 | 11/17/2016 | | PASS |
David Ferguson
|
|
|
plan mod
|
Routing - PLAN CHECK | 11/17/2016 | | 11/17/2016 | | PASS |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 11/17/2016 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/17/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/17/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/17/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 11/17/2016 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 11/17/2016 | | DONE |
|
|
|
plan mod -received 2 sheets of A-7 & 2 sets of calcs-took to Dave F
|
BLD-Footing | 11/15/2016 | 11/16/2016 | 11/16/2016 | P | FAIL |
Jim Storey
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron no basement need aproved basement from planreview
|
BLD-Conference | 11/2/2016 | 11/7/2016 | 11/7/2016 | A | PASS |
Jim Storey
|
|
|
BMP inspection please. Contact Steve Hanson with any questions. thanks, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
OVERRIDE | | | 11/1/2016 | | |
|
|
|
|
Plan assigned to (DAF) | 10/13/2016 | 10/13/2016 | 11/1/2016 | | DONE |
David Ferguson
|
|
|
due 10/20 - failed 1st review - need engineering and other info
|
Routing - PLAN CHECK | 11/1/2016 | | 11/1/2016 | | PASS |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 11/1/2016 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/1/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/1/2016 | | DONE |
|
|
|
All Met
|
Inspection Record Card- Bld | | | 11/1/2016 | | DONE |
|
|
|
|
Meeting | | | 11/1/2016 | | DONE |
|
|
|
didn't call Kim was already in the office
|
Issue PAID IN FULL permit | | | 11/1/2016 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/25/2016 | | DONE |
|
|
|
Two copies of Tall wall & 3rd bay gravity calcs and two copies ofLateral Calcs. Two copies of sheets A-3,A-7, A-10 and A-22. Taken to Dave Fer.
|
1st review completed | | | 10/19/2016 | | FAIL |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 10/10/2016 | | 10/19/2016 | | FAIL |
David Ferguson
|
|
|
|
Routing - PLANNING | 10/17/2016 | | 10/17/2016 | | PASS |
Jeff Lowe
|
|
|
applicant provided warranty deed verifying parcel existed prior to annexation/ordinance
|
Plan assigned to (LEG) Tisha | 10/7/2016 | | 10/13/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Route to Impact Fee Review | 10/7/2016 | 10/10/2016 | 10/10/2016 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - MECHANICAL | 10/10/2016 | | 10/10/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 10/7/2016 | | 10/10/2016 | | FAIL |
Jeff Lowe
|
|
|
it is noted that the property line between Lots 15 and 16 has been adjusted. The City of Boise does not have record the property line adjustment was reviewed nor approved by the City. The City may only recognize the platted line (as depicted on Rutledge Heights Subdivision) and thus the dwelling as proposed does not meet the side setback of 5-feet as prescribed in the R-1C zoning district. the building plans as proposed fail. The remedy is to apply for and receive approval of a Record of Survey application for a Property Line Adjustment.
|
Routing - Addressing | 10/7/2016 | | 10/7/2016 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | | | 10/7/2016 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/7/2016 | | DONE |
|
|
|
|
Intake Approval | | | 10/7/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/7/2016 | | DONE |
|
|
|
|
Application received | | 10/5/2016 | | | |
|
|
|
|