Second Notice | | 3/19/2017 | 3/30/2017 | | DONE |
|
|
|
This permit finaled on the web by don stine
|
First Notice | | 2/20/2017 | 3/9/2017 | | DONE |
|
|
|
Mailed 3-10-17
|
Permanent Occupancy | | | 2/10/2017 | | DONE |
|
|
|
|
BLD-Final | 1/24/2017 | 1/25/2017 | 1/25/2017 | P | PASS |
Jim Sly
|
|
|
Don Phone #: ###-####-please call 15 minutes prior to meet OK for Perm Occ.
|
FIRE-Final Inspection | 1/24/2017 | 1/24/2017 | 1/24/2017 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
CHANGE STATUS TO (ISS) | | | 1/23/2017 | | DONE |
|
|
|
Plan Mod
|
Plan assigned to (CDM) | 12/9/2016 | 12/9/2016 | 12/15/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 12/9/2016 | | 12/15/2016 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/15/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/15/2016 | | DONE |
|
|
|
Please do not re issue
|
BLD-Framing/Rough-in | 12/12/2016 | 12/13/2016 | 12/13/2016 | A | PART |
Jim Sly
|
|
|
Don Phone #: ###-#### All the framing appears OK.......waiting for approved re-submittal for stairway........Mechanical will be installed after sheetrock overlay on ceiling.
|
Telephone call | | | 12/13/2016 | | DONE |
|
|
|
called Don to let know address was changed from 17 N Orchard to 21 N Orchard-left message on phone
|
Plan Modification Accepted | | | 12/9/2016 | | DONE |
Christina Prado
|
|
|
Plan Modification requesterd to revise the location of the stairs
|
Print Occupancy Form | | | 11/23/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/23/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/14/2016 | | DONE |
Christina Prado
|
|
|
Need GC Form & Revised Certificate of Value for issuance
|
Plan assigned to (CDM) | 10/6/2016 | 10/6/2016 | 11/12/2016 | | PASS |
Carl D Madsen
|
|
|
1st rev comp. 21 North Concept Salon
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/12/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/7/2016 | | 11/12/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - MECHANICAL | 11/7/2016 | | 11/8/2016 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 11/7/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/28/2016 | | 11/3/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLUMBING | 10/28/2016 | | 11/1/2016 | | PASS |
Bill VanDegrift
|
|
|
may require a floor sink at the island hair sink
|
Routing - MECHANICAL | 10/28/2016 | | 10/31/2016 | | FAIL |
Troy James
|
|
|
|
Route to Impact Fee Review | 10/20/2016 | 10/23/2016 | 10/21/2016 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 10/6/2016 | | 10/20/2016 | | FAIL |
Carl D Madsen
|
|
|
|
1st review completed | | | 10/20/2016 | | FAIL |
|
|
|
|
Routing - PLUMBING | 10/6/2016 | | 10/10/2016 | | FAIL |
Bill VanDegrift
|
|
|
1) total venting must meet the minimum cross sectional area for the minimum building sewer for all fixtures in the building.
2) provide water system design showing sizing, cross connection protection and water heater location
|
Routing - MECHANICAL | 10/6/2016 | | 10/10/2016 | | FAIL |
Troy James
|
|
|
|
Routing - FIRE | 10/6/2016 | 10/6/2016 | 10/7/2016 | | PASS |
Katie Marron
|
|
|
comments attached to case.
|
Intake Approval | | | 10/6/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - Addressing | 10/6/2016 | | 10/6/2016 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 10/6/2016 | | 10/6/2016 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 10/6/2016 | | 10/6/2016 | | DONE |
Andy J. Long
|
|
|
No ESC permit required. No exterior, interior bathroom remodel and service relocates. No exterior trenching.
|
Application received | | | 10/5/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 5 2016 3:37PM
|