BLD-Final | 4/26/2017 | 4/26/2017 | 4/26/2017 | P | PASS |
Brandon Shaw
|
|
|
Garage access code is 0713. Please call with any questions. Thank you Phone #: ###-#### Inspection requested via web by Kim Winkle
|
DOC - Permit Finaled | 4/26/2017 | 4/26/2017 | 4/26/2017 | P | PASS |
Brandon Shaw
|
|
|
|
DOC - Permit Finaled | 4/26/2017 | 4/26/2017 | 4/26/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 4/26/2017 | 4/26/2017 | 4/26/2017 | P | CANC |
Brandon Shaw
|
|
|
Garage access code is 0713. Please call if there are any questions. Thank you Phone #: ###-#### >> Inspection requested via web by Kim Winkle Inspection cancelled from web by: Kim Winkle
|
BLD-Final | 4/26/2017 | 4/26/2017 | 4/26/2017 | A | CANC |
Brandon Shaw
|
|
|
Garage access code is 0713. Please let me know if there are any questions. Thank you Phone #: ###-#### >> Inspection requested via web by Kim Winkle Inspection cancelled from web by: Kim Winkle
|
BLD-Final | 4/24/2017 | 4/25/2017 | 4/25/2017 | P | NR |
Brandon Shaw
|
|
|
Garage access code is 0713 enter. Please call with any questions or issues. Thank you, Kim Phone #: ###-#### Inspection requested via web by Kim Winkle
|
PubWorks Occupancy Approval | 4/21/2017 | 4/21/2017 | 4/21/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Conference | 2/3/2017 | 2/3/2017 | 2/3/2017 | P | PART |
Jim Sly
|
|
|
Need an inspection of the double layer of 5/8" Sheetrock on the exterior soffit before we proceed forward to cover. Thank you! Phone #: ###-#### Inspection requested via web by Kim Winkle Only ONE layer.......installed and inspected.
|
BLD-Energy code compliance | 2/1/2017 | 2/2/2017 | 2/2/2017 | P | PASS |
Dave Hannah
|
|
|
Thank you :) Phone #: ###-#### Inspection requested via web by Kim Winkle
|
BLD-Framing/Rough-in | 1/30/2017 | 1/31/2017 | 1/31/2017 | P | PASS |
Dave Hannah
|
|
|
Thank you Phone #: ###-#### Inspection requested via web by Kim Winkle ok to insulate
|
BLD-Framing/Rough-in | 1/27/2017 | 1/27/2017 | 1/30/2017 | P | PEND |
Dave Hannah
|
|
|
Thank you Phone #: ###-#### Inspection requested via web by Kim Winkle fire blocking in furred out walls in basement
|
BLD-Wall Bracing | 1/11/2017 | 1/11/2017 | 1/11/2017 | P | PASS |
Dave Hannah
|
|
|
Thank you! Phone #: ###-#### Inspection requested via web by Kim Winkle ok to cover ext
|
Routing PW Grading-Hillside | 11/23/2016 | | 11/23/2016 | | PASS |
Jason C. Taylor
|
|
|
Plan mod approved. JCT
|
Plan Modification Accepted | | | 11/17/2016 | | DONE |
|
|
|
plan mod-received 3 engineer stamped sheets of the site grading & drainage took to Dave F
|
BLD-Foundation | 11/14/2016 | 11/15/2016 | 11/15/2016 | A | PASS |
Phil Shearer
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 11/9/2016 | 11/9/2016 | 11/9/2016 | A | PASS |
Phil Shearer
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 11/9/2016 | 11/9/2016 | 11/9/2016 | P | CANC |
Phil Shearer
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron Inspection cancelled via mobile web on Wednesday, November 09, 2016.
|
PubWorks Subgrade Approval | 11/8/2016 | 11/8/2016 | 11/8/2016 | | DONE |
Jason C. Taylor
|
|
|
**ALL FOOTING INCLUDING GARAGE***NO COLUMNS***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 11/2/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 11/1/2016 | | |
|
|
|
|
Plan assigned to (DAF) | 10/13/2016 | 10/13/2016 | 11/1/2016 | | DONE |
David Ferguson
|
|
|
due 10/28 - plan review failed building, hillside and public works
|
Inspection Record Card- Bld | | | 11/1/2016 | | DONE |
|
|
|
|
Telephone call | | | 11/1/2016 | | DONE |
|
|
|
called Steve to let know permit is ready and how much is owed-left message on Steve's phone
|
Plan resubmittals received | | | 11/1/2016 | | DONE |
|
|
|
One Copy of sheets 1 of 2 and 2 of 2. Jason Taylor came and spoke with Kim from Syringa and took plans
|
Case Summary (BLD) | | | 11/1/2016 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/1/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/1/2016 | | DONE |
|
|
|
All Met
|
Routing - MECHANICAL | 10/28/2016 | | 10/31/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 10/31/2016 | | 10/31/2016 | | PASS |
David Ferguson
|
|
|
|
Plan resubmittals received | | | 10/31/2016 | | DONE |
|
|
|
resubmittals recieved 1 set of 1 of 1 and 1-2-took to Dave F
|
Routing PW Grading-Hillside | 10/28/2016 | | 10/28/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PUBLIC WORKS | 10/28/2016 | | 10/28/2016 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLANNING | 10/28/2016 | | 10/28/2016 | | PASS |
Brent Moore
|
|
|
|
1st review completed | | | 10/26/2016 | | FAIL |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 10/13/2016 | | 10/26/2016 | | FAIL |
David Ferguson
|
|
|
|
Routing - FIRE | 10/17/2016 | | 10/18/2016 | | PASS |
Scott Arellano
|
|
|
No comments attached to plans. All portions of this structure shall comply with the provisions of BMC 7-01-69 section 4920 for defensible space and are subject to Fire Department inspection.
|
Routing - Erosion and Sediment | 10/13/2016 | | 10/17/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan narrative and site map approved. Valid RP and PD designated. Site preparation inspection and BMPs installation required prior to excavation, call ###-#### or ###-####
|
Routing - PLANNING | 10/12/2016 | | 10/13/2016 | | PASS |
Brent Moore
|
|
|
|
Routing - MECHANICAL | 10/13/2016 | | 10/13/2016 | | PASS |
Troy James
|
|
|
|
Plan assigned to (LEG) Tisha | 10/11/2016 | | 10/13/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - Addressing | 10/11/2016 | | 10/12/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 10/12/2016 | | 10/12/2016 | | FAIL |
Morgan Webb
|
|
|
|
Routing PW Grading-Hillside | 10/12/2016 | | 10/12/2016 | | FAIL |
Jason C. Taylor
|
|
|
The grading plan shows that the walls are 4ft exposed height but they will still need to be embedded into the ground 24” into the ground. So I will need the engineering for a retaining wall that is 6’ tall. JCT
|
Routing PW Sewer Rating | 10/12/2016 | | 10/12/2016 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/11/2016 | | DONE |
|
|
|
|
Intake Approval | | | 10/11/2016 | | PASS |
Kristal Soland
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/11/2016 | | DONE |
|
|
|
|
Application received | | 10/11/2016 | | | |
|
|
|
|