Meeting | | | 5/11/2018 | | DONE |
|
|
|
sent statement 5-14
|
Third Notice | | 8/15/2017 | 8/14/2017 | | DONE |
|
|
|
This permit finaled on the web by Ferd Smith
|
Third Notice | | 7/17/2017 | 8/10/2017 | | DONE |
|
|
|
Mailed 8-11-17
|
Second Notice | | 6/24/2017 | 7/12/2017 | | DONE |
|
|
|
Mailed 7-13-17
|
First Notice | | 6/18/2017 | 6/14/2017 | | DONE |
|
|
|
sent in mail 6-14-178
|
BLD-Final | 6/7/2017 | 6/8/2017 | 6/8/2017 | P | PASS |
Brandon Shaw
|
|
|
Inspection requested via web by Ferd Smith
|
DOC - Permit Finaled | 6/8/2017 | 6/8/2017 | 6/8/2017 | P | PASS |
Brandon Shaw
|
|
|
|
DOC - Permit Finaled | 6/8/2017 | 6/8/2017 | 6/8/2017 | P | PASS |
Brandon Shaw
|
|
|
|
FIRE-Final Inspection | 6/7/2017 | 6/8/2017 | 6/8/2017 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
PubWorks Occupancy Approval | 6/8/2017 | 6/8/2017 | 6/8/2017 | | DONE |
Tiffany Lowery
|
|
|
|
Permanent Occupancy | | | 6/8/2017 | | DONE |
|
|
|
|
FIRE-Final Inspection | 6/6/2017 | 6/7/2017 | 6/7/2017 | P | FAIL |
Troy Cobbley
|
|
|
Need the project related fire alarm and fire sprinkler pemits addressed. Need single action hardware on the north office door, need correct fire extinguishers in warehouse, need signage on the Electrical Room/Fire Alarm Panel door.
|
Zoning Approval | 6/7/2017 | 6/7/2017 | 6/7/2017 | | DONE |
Andrea Tuning
|
|
|
|
(F) Reprint permit | | | 6/2/2017 | | DONE |
|
|
|
sent to Scott for signature
|
CHANGE STATUS TO (ISS) | | | 6/1/2017 | | DONE |
|
|
|
plan mnod paid-emailed new permit for signature
|
(F) Reprint permit | | | 6/1/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 5/11/2017 | | |
|
|
|
|
Plan assigned to (CDM) | 5/10/2017 | 5/10/2017 | 5/11/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 5/11/2017 | | 5/11/2017 | | PASS |
Carl D Madsen
|
|
|
|
Permit Ready to Issue | | | 5/11/2017 | | DONE |
|
|
|
all met - plan mod DO NOT REISSUE
|
Plan Modification Accepted | | | 5/10/2017 | | DONE |
|
|
|
plan mod accepted in e plan-assigned to Carl M
|
BLD-Conference | 5/8/2017 | 5/8/2017 | 5/8/2017 | P | DONE |
Mike Jordan
|
|
|
Responded to a complaint from the land owner to the north of the project. Noted pitrun that was on land to the north. Spoke with contractor, they will remove all pitrun and northern parcell.
|
BLD-Framing/Rough-in | 3/28/2017 | 3/29/2017 | 3/29/2017 | A | CANC |
Mike Jordan
|
|
|
Framing inspection Phone #: ###-#### Inspection requested via web by Ferd Smith
|
BLD-Energy code compliance | 3/29/2017 | 3/29/2017 | 3/29/2017 | P | PASS |
Mike Jordan
|
|
|
Framing inspection Phone #: ###-#### Inspection requested via web by Ferd Smith
|
BLD-Framing/Rough-in | 3/29/2017 | 3/29/2017 | 3/29/2017 | P | PART |
Mike Jordan
|
|
|
Interior steel stud framed walls and hardlid for office area. Contractor to have architect resubmit deatails for guards on stairs. Owner has deleted the wall and stairs guards are now non code compliant.
|
BLD-Energy code compliance | 2/23/2017 | 2/24/2017 | 2/24/2017 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Ferd Smith
|
BLD-Energy code compliance | 2/6/2017 | 2/9/2017 | 2/9/2017 | P | PASS |
Mike Jordan
|
|
|
Inspect visqueen and foundation insulation in bay 8 ; 9. Phone #: ###-#### Inspection requested via web by Ferd Smith. rigid insualtion under slab ok.
|
BLD-Energy code compliance | 11/28/2016 | 11/29/2016 | 11/29/2016 | P | PART |
Mike Jordan
|
|
|
Ferd Phone #: ###-####. Rigid insulation aginst stemwall interior side. Ok to backfill. Wiil provide the remainder of rigid insulation horizontally under slab on grade.
|
Issue PAID IN FULL permit | | | 11/21/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/21/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 11/18/2016 | | |
|
|
|
|
Permit Ready to Issue | | | 11/18/2016 | | DONE |
Christina Prado
|
|
|
All requirements met 11/18/16//// Need GC Form and Revised Cert of Value
|
Plan assigned to (CDM) | 11/2/2016 | 11/2/2016 | 11/17/2016 | | PASS |
Carl D Madsen
|
|
|
1st review completed BA Fisher Office Warehouse
|
Plan assigned to (CDM) | 10/18/2016 | 10/18/2016 | 11/17/2016 | | PASS |
Carl D Madsen
|
|
|
1st review completed BA Fischer Office and Warehouse 1st rev comp.
|
Routing - PLAN CHECK | 11/16/2016 | | 11/17/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 11/16/2016 | | 11/17/2016 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/17/2016 | | DONE |
|
|
|
|
Routing PW Solid Waste | 11/8/2016 | | 11/10/2016 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Environmental | 11/8/2016 | | 11/10/2016 | | PASS |
Rick Christenson
|
|
|
|
Routing - Design Review | 11/2/2016 | | 11/9/2016 | | PASS |
Josh Wilson
|
|
|
Nine parking spaces are provided.
|
Routing PW Sewer Design | 11/8/2016 | | 11/9/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - FIRE | 11/8/2016 | 11/8/2016 | 11/8/2016 | | PASS |
Katie Marron
|
|
|
No additional comments required.
|
Routing PW Drainage | 11/8/2016 | | 11/8/2016 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 11/8/2016 | | 11/8/2016 | | PASS |
Tom Marshall
|
|
|
|
Routing Off Site - STRUCTURAL | 11/2/2016 | | 11/8/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PUBLIC WORKS | 11/8/2016 | | 11/8/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Street Lights | 10/18/2016 | | 11/8/2016 | | PASS |
Tom Marshall
|
|
|
|
Routing - PLAN CHECK | 11/2/2016 | | 11/5/2016 | | PASS |
Carl D Madsen
|
|
|
|
Plan Modification Accepted | | | 11/2/2016 | | DONE |
|
|
|
was taken in yesterday but not routed in Tidemark
|
1st review completed | | | 10/28/2016 | | FAIL |
|
|
|
|
Routing Off Site - STRUCTURAL | 10/18/2016 | | 10/28/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 10/18/2016 | | 10/28/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Routing PW Drainage | 10/18/2016 | | 10/27/2016 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Environmental | 10/18/2016 | | 10/25/2016 | | PASS |
Rick Christenson
|
|
|
|
Routing - PLUMBING | 10/24/2016 | | 10/24/2016 | | PASS |
Bill VanDegrift
|
|
|
additional cross connection protection may be required at hose bib in the storage.
|
Routing - FIRE | 10/18/2016 | 10/18/2016 | 10/21/2016 | | PASS |
Katie Marron
|
|
|
Revised drawings received before 1st review fully complete. Comments addressed. Updated report attached to case.
|
Routing - MECHANICAL | 10/18/2016 | | 10/21/2016 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 10/18/2016 | | 10/19/2016 | | PASS |
Andy J. Long
|
|
|
ESC narrative and site plan submitted and approved. Valid RP and PD designated. Site preparation inspection required, call ###-#### or ###-####
|
Routing - PLANNING Land Div | 10/18/2016 | | 10/19/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing PW Sewer Design | 10/18/2016 | | 10/19/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - Addressing | 10/18/2016 | | 10/18/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 10/18/2016 | | 10/18/2016 | | PASS |
Rachael Beierle
|
|
|
spoke w/ Scott Marshall. Veridied zone 7 is empty. storage for copper piping.
|
Routing - Design Review | 10/18/2016 | | 10/18/2016 | | PASS |
Andrea Tuning
|
|
|
Provide a minimum of 9-parking spaces.
|
Routing PW Solid Waste | 10/18/2016 | | 10/18/2016 | | PASS |
Evan Carpenter
|
|
|
Solid waste enclosure is OK as planned.
|
Routing - PLUMBING | 10/18/2016 | | 10/18/2016 | | FAIL |
Bill VanDegrift
|
|
|
Red Line
1) hose bib in storage room may require additional protection
2) clean outs required on waste branches over 5 feet long.
change mark
-- C2.1 building sewer does not match plumbing plan
3)
|
Routing - PLANNING | 10/18/2016 | | 10/18/2016 | | PASS |
Cody Riddle
|
|
|
|
Plan Reviewer's activity | | | 10/18/2016 | | DONE |
Javier Guzman
|
|
|
Per Brian Murphy it was ok to accept the letter from soil scientist and not require engineer stamp on letter
|
Intake Approval | | | 10/18/2016 | | PASS |
|
|
|
|
Intake Approval | | | 10/17/2016 | | FAIL |
Javier Guzman
|
|
|
Please provide and upload the following document, (Incomplete submittals will not be accepted):
1. Per submittal standards for us to consider the submitted Soils and geotech report letter it is required to be stamped and signed by an Idaho licensed engineer
|
Intake Approval | | | 10/14/2016 | | FAIL |
Javier Guzman
|
|
|
Please provide and upload the following missing documents, (Incomplete submittals will not be accepted):
1. Soils and geotech report is required to be stamped and signed by an Idaho licensed engineer
2. Soils and geotech report for infiltration systems is required to be stamped and signed by an Idaho licensed civil engineer, geologist, or soil scientist
3. On uploaded form #310 please provide the owners signature
4. Erosion & Sediment Control (ESC) Narrative. Narrative must be designed for the specific project, and be prepared and signed by a plan designer certified by Boise City.
5. List deferred items not on plan sheet A0.0 as stated
|
Application received | | | 10/12/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 12 2016 6:01AM
|