Permit Information
Permit NumberBLD16-03775
StatusFinaled
Name STOR-MOR SYSTEMS
Site Address 3108 N 24TH WAY
Project NameDaley Storage Project
Customer Number 
ePlanReviewYes
Description
WUI Zone A; To build a 22x24 (528 square feet) Storage building, with stepped foundation to replace retaining wall on 2 sides. Separate erosion permit is requried. All work is to be done according to approved plans and enigineering.//leg ***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/30/20178/30/20178/30/2017PPASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Preston Reynolds
DOC - Permit Finaled8/30/20178/30/20178/30/2017PPASS
DetailsTony Young
BLD-Final8/18/20178/18/20178/18/2017PPART
DetailsTony Young
please call with any questions Phone #: ###-#### Inspection requested via web by Preston Reynolds,, ok after bracing bottom chord
BLD-Framing/Rough-in8/14/20178/14/20178/15/2017PPASS
DetailsBrandon Shaw
Call me with any questions. Thanks. ###-####
Phone #: ###-#### Inspection requested via web by Preston Reynolds
BLD-Wall Bracing8/8/20178/9/20178/9/2017APASS
DetailsTony Young
Preston Phone #: ###-####
BLD-Footing7/20/20177/20/20177/20/2017PPASS
DetailsTony Young
Preston Phone #: ###-####
BLD-Footing7/19/20177/20/20177/20/2017APASS
DetailsTony Young
Preston Phone #: ###-####
PubWorks Subgrade Approval7/20/20177/20/20177/20/2017 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  12/5/2016 DONE
Inspection Record Card- Bld  12/5/2016 DONE
OVERRIDE  11/30/2016  
Plan assigned to (BJM)10/20/201610/20/201611/30/2016 DONE
DetailsBrian McGowan
Fail - Hillside and WUI requirements must be provided. FAIL _ Wui Details required
Plan resubmittals received  11/30/2016 DONE
Routing - PLAN CHECK11/30/2016 11/30/2016 PASS
DetailsTisha Gallop
PLANS/APPL TAKEN TO FRONT DESK  11/30/2016 DONE
n/a energy; yes esc
Permit Ready to Issue  11/30/2016 DONE
DetailsChristina Prado
All requirements met
Routing - PLAN CHECK11/14/2016 11/14/2016 FAIL
DetailsBrian McGowan
Top of foundation and top of footing need to be specified on foundation plan. WUI details and compliance still need to be shown on plans.
Routing PW Grading-Hillside10/20/2016 10/24/2016 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
1st review completed  10/24/2016 FAIL
DetailsBrian McGowan
Fail - Hillside and WUI requirements must be provided.
Routing - PLAN CHECK10/20/2016 10/24/2016 FAIL
DetailsBrian McGowan
Fail - Hillside and WUI requirements must be provided.
Routing - PLANNING10/20/2016 10/21/2016 PASS
DetailsJeff Lowe
No parking has been proposed and none is approved within accessory structure. Any parking shall comply with Boise City Code 11-07-03-4.3 Driveways.
Routing - Erosion and Sediment10/20/2016 10/21/2016 PASS
DetailsAndy J. Long
ESC plan approved. Valid RP designated.
Plans ACCEPTED BY PLAN TECH  10/20/2016 DONE
Intake Approval  10/20/2016 PASS
Recd Pcfee & Taken To Pln CK  10/20/2016 DONE
Intake Approval  10/19/2016 FAIL
DetailsChristina Prado
Hillside propoerty, need ESC waiver or plans prior to review
Application received  10/12/2016 DONE
Application submitted via PDS Online on Oct 12 2016 6:55AM