Letter of compliance/Occupancy | | | 1/10/2017 | | DONE |
|
|
|
|
BLD-Final | 12/29/2016 | 12/30/2016 | 12/30/2016 | A | PASS |
Jim Sly
|
|
|
Llyod Phone #: ###-####
|
DOC - Permit Finaled | 12/30/2016 | 12/30/2016 | 12/30/2016 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 11/21/2016 | 11/22/2016 | 11/22/2016 | A | PASS |
Jim Sly
|
|
|
Lloyd Phone #: ###-####
|
BLD-Framing/Rough-in | 11/21/2016 | 11/22/2016 | 11/22/2016 | A | PASS |
Jim Sly
|
|
|
Lloyd Phone #: ###-####
|
BLD-Footing | 10/31/2016 | 10/31/2016 | 10/31/2016 | P | PASS |
Jim Sly
|
|
|
Dan-back yard Phone #: ###-#### Wall OK too.
|
Routing Walk-In (BLD) | 10/14/2016 | 10/14/2016 | 10/14/2016 | P | PASS |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 10/14/2016 | | 10/14/2016 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 10/14/2016 | | DONE |
|
|
|
|
1st review completed | | | 10/14/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/14/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/14/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/14/2016 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 10/12/2016 | 10/12/2016 | 10/12/2016 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 10/12/2016 | 10/12/2016 | 10/12/2016 | P | FAIL |
Brian McGowan
|
|
|
Wanted to alter the foundation structure. Drawings are required showing the change.
|
Application received | | 10/12/2016 | | | |
|
|
|
|