BLD-Final | 4/27/2017 | 4/27/2017 | 4/27/2017 | P | PASS |
Brandon Shaw
|
|
|
phil Phone #: ###-####
|
DOC - Permit Finaled | 4/27/2017 | 4/27/2017 | 4/27/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Wall Bracing | 2/6/2017 | 2/6/2017 | 2/6/2017 | P | PASS |
Jim Sly
|
|
|
###-#### - phil
|
BLD-Energy code compliance | 1/11/2017 | 1/11/2017 | 1/11/2017 | P | PASS |
Jim Sly
|
|
|
Phil Phone #: ###-####
|
BLD-Framing/Rough-in | 1/6/2017 | 1/9/2017 | 1/9/2017 | P | PASS |
Phil Shearer
|
|
|
phil Phone #: ###-####
|
BLD-Wall Bracing | 12/13/2016 | 12/14/2016 | 12/14/2016 | A | PASS |
Phil Shearer
|
|
|
Phil Phone #: ###-####
|
Plan Modification Accepted | | | 12/12/2016 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 12/12/2016 | | 12/12/2016 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Foundation | 11/8/2016 | 11/8/2016 | 11/8/2016 | P | PASS |
Phil Shearer
|
|
|
Bill Phone #: ###-####
|
BLD-Footing | 11/4/2016 | 11/4/2016 | 11/4/2016 | P | PASS |
Jim Storey
|
|
|
John Phone #: ###-####
|
OVERRIDE | | | 11/4/2016 | | |
|
|
|
|
Plan assigned to (BJM) | 10/13/2016 | 10/13/2016 | 11/4/2016 | | DONE |
Brian McGowan
|
|
|
Due 10-24 - Special inspections required, forms needed, tall wall and wall bracing engineering calculations required.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/4/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 11/4/2016 | | DONE |
|
|
|
need RP one on file is expired
|
Routing - Addressing | 10/12/2016 | | 11/4/2016 | | PASS |
Emily Dixon
|
|
|
|
Inspection Record Card- Bld | | | 11/4/2016 | | DONE |
|
|
|
|
Telephone call | | | 11/4/2016 | | DONE |
|
|
|
Left a message for John informing him permit is ready, fees due and that his CON expired 10/14/16
|
Issue PAID IN FULL permit | | | 11/4/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/3/2016 | | 11/3/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 11/3/2016 | | DONE |
Brian McGowan
|
|
|
|
Plan resubmittals received | | | 10/31/2016 | | DONE |
|
|
|
received (2) sets of resubmitted plan sheets and calculations
|
Plan resubmittals received | | | 10/25/2016 | | DONE |
|
|
|
received (2) sets of resubmittals
|
1st review completed | | | 10/24/2016 | | FAIL |
Brian McGowan
|
|
|
Special inspections required, forms needed, tall wall and wall bracing engineering calculations required.
|
Routing - PLAN CHECK | 10/14/2016 | | 10/24/2016 | | FAIL |
Brian McGowan
|
|
|
Special inspections required, forms needed, tall wall and wall bracing engineering calculations required.
|
Routing - MECHANICAL | 10/13/2016 | | 10/14/2016 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 10/12/2016 | | 10/13/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLANNING | 10/13/2016 | | 10/13/2016 | | PASS |
Jeff Lowe
|
|
|
|
Plan assigned to (LEG) Tisha | 10/12/2016 | | 10/13/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/12/2016 | | DONE |
|
|
|
|
Intake Approval | | | 10/12/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/12/2016 | | DONE |
|
|
|
|
Application received | | 10/12/2016 | | | |
|
|
|
|