BLD-Foundation | 11/18/2016 | 11/18/2016 | 11/21/2016 | P | PASS |
Dave Hannah
|
|
|
Kerry Phone #: ###-####
|
PubWorks Subgrade Approval | 11/21/2016 | 11/21/2016 | 11/21/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 11/2/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 11/1/2016 | | |
|
|
|
|
Plan assigned to (DAF) | | 10/14/2016 | 11/1/2016 | | DONE |
David Ferguson
|
|
|
due 10/20 - failed review - does not have engineering for hillside and needs to provide ESC info to Andy for approval
|
Telephone call | | | 11/1/2016 | | DONE |
|
|
|
called Scott to let know permit is ready-also that the RP needs to update the CON #
|
Routing - PLAN CHECK | 11/1/2016 | | 11/1/2016 | | PASS |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 11/1/2016 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/1/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/1/2016 | | DONE |
|
|
|
***all requirments met 11-2-16 /CEV
NEED RP-one on file is expired
|
Plan resubmittals received | | | 10/27/2016 | | DONE |
|
|
|
resubmittals received 2 sets ESC control plans-took to Dave F
|
Routing - Erosion and Sediment | 10/27/2016 | | 10/27/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan and narrative submitted and approved. Valid PD and RP designated. Call ###-#### or ###-#### for ESC site preparation inspection.
|
Routing - PLAN CHECK | | | 10/20/2016 | | FAIL |
David Ferguson
|
|
|
|
1st review completed | | | 10/20/2016 | | FAIL |
David Ferguson
|
|
|
|
Routing - PLANNING | 10/19/2016 | | 10/19/2016 | | PASS |
Jeff Lowe
|
|
|
|
Routing - Erosion and Sediment | | | 10/19/2016 | | FAIL |
Andy J. Long
|
|
|
ESC plan or ESC plan waiver required due to hillside construction
|
Routing PW Grading-Hillside | 10/14/2016 | | 10/17/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Plans ACCEPTED BY PLAN TECH | | | 10/14/2016 | | DONE |
|
|
|
|
Intake Approval | | | 10/14/2016 | | PASS |
|
|
|
customer said they had a meeting with Jason Taylor and no P & Z letter is required as well as no large sheets of the grading & drainage
|
Recd Pcfee & Taken To Pln CK | | | 10/14/2016 | | DONE |
|
|
|
no fees were taken at submittal
|
Application received | | 10/14/2016 | | | |
|
|
|
|