BLD-Energy code compliance | 4/27/2017 | 4/28/2017 | 4/28/2017 | A | PASS |
Jim Sly
|
|
|
Insulation // Matt Phone #: ###-####
|
BLD-Framing/Rough-in | 4/25/2017 | 4/26/2017 | 4/26/2017 | A | PASS |
Jim Sly
|
|
|
Matt Phone #: ###-####
|
Plan assigned to (BJM) | 2/24/2017 | 2/24/2017 | 3/9/2017 | | DONE |
Brian McGowan
|
|
|
Due 3-2 ePlan changes
(1) hour additional Plan Modification
|
Routing - PLAN CHECK | 2/24/2017 | | 3/9/2017 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/9/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 3/9/2017 | | DONE |
|
|
|
plan mod ONLY - DO NOT RE-ISSUE
|
CHANGE STATUS TO (ISS) | | | 3/9/2017 | | DONE |
Christina Prado
|
|
|
|
(F) Reprint permit | | | 3/9/2017 | | DONE |
Christina Prado
|
|
|
|
Routing - PLANNING | 2/24/2017 | | 2/27/2017 | | PASS |
Jeff Lowe
|
|
|
|
Plan Modification Accepted | | | 2/24/2017 | | DONE |
Christina Prado
|
|
|
Modification requested to add a portion of roof to cover previously approved deck
|
BLD-Foundation | 12/6/2016 | 12/7/2016 | 12/7/2016 | P | PASS |
Jim Sly
|
|
|
Footing inspection has been completed. Calling for Inspection on stem walls hopefully after 2:00 on Wednesday. Footings have been poured and will sit under blankets for 3 days prior to stem walls being poured. They will also sit under blankets for 3 days in the cold weather after pouring. Please call Matt Swenson ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Matt Swenson
|
BLD-Footing | 12/3/2016 | 12/5/2016 | 12/5/2016 | A | PASS |
Jim Sly
|
|
|
Project plans are locate in PVC tube on South corner of home. Call ###-#### with questions. If no answer leave a message. Thanks! Phone #: ###-#### Inspection requested via web by Matt Swenson
|
Issue PAID IN FULL permit | | | 11/29/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/29/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 11/29/2016 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 11/2/2016 | 11/2/2016 | 11/22/2016 | | DONE |
Brian McGowan
|
|
|
Fail - structural issues.
|
Routing - PLAN CHECK | 11/22/2016 | | 11/22/2016 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/22/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 11/22/2016 | | DONE |
|
|
|
need RP
|
1st review completed | | | 11/10/2016 | | FAIL |
Brian McGowan
|
|
|
Several beams were not sized, spread footings need to be sized, portion of the garage is proposed to be built with open deck above.
|
Routing - PLAN CHECK | 11/2/2016 | | 11/10/2016 | | FAIL |
Brian McGowan
|
|
|
Several beams were not sized, spread footings need to be sized, portion of the garage is proposed to be built with open deck above.
|
Routing - PLANNING | 11/2/2016 | | 11/3/2016 | | PASS |
Jeff Lowe
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/2/2016 | | DONE |
|
|
|
|
Intake Approval | | | 11/2/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/2/2016 | | DONE |
|
|
|
|
Application received | | | 10/18/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 18 2016 5:21PM
|