Permit Information
Permit NumberBLD16-03871
StatusFinaled
Name WOOD RIVER BUILDERS
Site Address 1629 N MOCKBEE PL
Project Name1629 N MOCKBEE PL
Customer NumberCFH16-00055
ePlanReviewYes
Description
WUI Zone A; *This structure is required to have a NFPA 13D fire sprinkler system.* *Special inspections required, see form #310* Permit for the construction of a new 3,541 sq. ft., two story (basment level 245 sq. ft., main level 2900 sq. ft., upper level 396 sq. ft.) single family dwelling with 3 bedrooms, 3 bathrooms, approximately 475 sq. ft. of covered patio/porch and a 1915 sq. ft. attached garage per the approved plans, engineering, ACCA report and any notations. R-1B zoning and setbacks per planning. //leg ***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/15/201712/15/201712/15/2017PPASS
DetailsTony Young
Todd Phone #: ###-####
DOC - Permit Finaled12/15/201712/15/201712/15/2017PPASS
DetailsTony Young
BLD-Final11/14/201711/15/201711/15/2017PNR
DetailsTony Young
Todd Phone #: ###-####,, needs handrail and guard rail to meet code,, also need final letter of ok from the structural engineer that all structural is ok
PubWorks Occupancy Approval11/9/201711/9/201711/9/2017 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.

BLD-Energy code compliance9/6/20179/7/20179/7/2017PPASS
DetailsTony Young
Insulation // Todd Phone #: ###-####,, need tempered glass by final,,
BLD-Framing/Rough-in8/29/20178/30/20178/30/2017PPASS
DetailsBrandon Shaw
Todd Phone #: ###-####
BLD-Wall Bracing8/29/20178/30/20178/30/2017PPASS
DetailsBrandon Shaw
Todd Phone #: ###-####
Plan Modification Accepted  8/7/2017 DONE
new manual j report
Routing - MECHANICAL8/7/2017 8/7/2017 PASS
DetailsTroy James
resubmitted manual j report
PubWorks Subgrade Approval3/10/20173/10/20173/10/2017 DONE
DetailsJason C. Taylor
**ALL RESIDENTIAL FOOTINGS**A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  2/3/2017 DONE
Inspection Record Card- Bld  2/3/2017 DONE
OVERRIDE  1/12/2017  
Plan assigned to (LEG) Tisha11/29/2016 1/12/2017 DONE
DetailsTisha Gallop
2nd review 12/22; need fabricators cert (everything else ok)
Plan resubmittals received  1/12/2017 DONE
Routing - PLAN CHECK1/12/2017 1/12/2017 PASS
DetailsTisha Gallop
PLANS/APPL TAKEN TO FRONT DESK  1/12/2017 DONE
Permit Ready to Issue  1/12/2017 DONE
all requirements met
Plan resubmittals received  12/22/2016 DONE
Routing - PLAN CHECK12/22/2016 12/22/2016 FAIL
DetailsTisha Gallop
need fabricators cert
1st review completed  12/16/2016 FAIL
pending approval by plan check
Routing - PLAN CHECK11/29/2016 12/16/2016 FAIL
DetailsTisha Gallop
Routing PW Grading-Hillside12/8/2016 12/8/2016 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - FIRE11/29/201611/29/201612/1/2016 PASS
DetailsKatie Marron
This home is required to have a NFPA13D Fire sprinkler system per subdivision wildfire plan.
Routing - Erosion and Sediment11/29/2016 12/1/2016 PASS
DetailsAndy J. Long
ESC site map and narrative approved. Valid PD and RP designated. Site preparation inspection required, call ###-####.
Routing - MECHANICAL11/29/2016 11/30/2016 FAIL
DetailsTroy James
left voice message
Routing PW Grading-Hillside11/29/2016 11/30/2016 FAIL
DetailsJason C. Taylor
see notes in ePlan. JCT
Routing - MECHANICAL11/30/2016 11/30/2016 PASS
DetailsTroy James
Routing - PLANNING11/29/2016 11/29/2016 PASS
DetailsNicolette Womack
Routing - Addressing11/29/2016 11/29/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS11/29/2016 11/29/2016 PASS
DetailsMorgan Webb
Intake Approval  11/29/2016 PASS
intake complete - plan review fee due
Plans ACCEPTED BY PLAN TECH  11/29/2016 DONE
Recd Pcfee & Taken To Pln CK  11/29/2016 DONE
Application received  10/20/2016 DONE
Application submitted via PDS Online on Oct 20 2016 8:26AM