BLD-Final | 12/15/2017 | 12/15/2017 | 12/15/2017 | P | PASS |
Tony Young
|
|
|
Todd Phone #: ###-####
|
DOC - Permit Finaled | 12/15/2017 | 12/15/2017 | 12/15/2017 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 11/14/2017 | 11/15/2017 | 11/15/2017 | P | NR |
Tony Young
|
|
|
Todd Phone #: ###-####,, needs handrail and guard rail to meet code,, also need final letter of ok from the structural engineer that all structural is ok
|
PubWorks Occupancy Approval | 11/9/2017 | 11/9/2017 | 11/9/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 9/6/2017 | 9/7/2017 | 9/7/2017 | P | PASS |
Tony Young
|
|
|
Insulation // Todd Phone #: ###-####,, need tempered glass by final,,
|
BLD-Framing/Rough-in | 8/29/2017 | 8/30/2017 | 8/30/2017 | P | PASS |
Brandon Shaw
|
|
|
Todd Phone #: ###-####
|
BLD-Wall Bracing | 8/29/2017 | 8/30/2017 | 8/30/2017 | P | PASS |
Brandon Shaw
|
|
|
Todd Phone #: ###-####
|
Plan Modification Accepted | | | 8/7/2017 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 8/7/2017 | | 8/7/2017 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
PubWorks Subgrade Approval | 3/10/2017 | 3/10/2017 | 3/10/2017 | | DONE |
Jason C. Taylor
|
|
|
**ALL RESIDENTIAL FOOTINGS**A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 2/3/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/3/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 1/12/2017 | | |
|
|
|
|
Plan assigned to (LEG) Tisha | 11/29/2016 | | 1/12/2017 | | DONE |
Tisha Gallop
|
|
|
2nd review 12/22; need fabricators cert (everything else ok)
|
Plan resubmittals received | | | 1/12/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/12/2017 | | 1/12/2017 | | PASS |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/12/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/12/2017 | | DONE |
|
|
|
all requirements met
|
Plan resubmittals received | | | 12/22/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/22/2016 | | 12/22/2016 | | FAIL |
Tisha Gallop
|
|
|
need fabricators cert
|
1st review completed | | | 12/16/2016 | | FAIL |
|
|
|
pending approval by plan check
|
Routing - PLAN CHECK | 11/29/2016 | | 12/16/2016 | | FAIL |
Tisha Gallop
|
|
|
|
Routing PW Grading-Hillside | 12/8/2016 | | 12/8/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - FIRE | 11/29/2016 | 11/29/2016 | 12/1/2016 | | PASS |
Katie Marron
|
|
|
This home is required to have a NFPA13D Fire sprinkler system per subdivision wildfire plan.
|
Routing - Erosion and Sediment | 11/29/2016 | | 12/1/2016 | | PASS |
Andy J. Long
|
|
|
ESC site map and narrative approved. Valid PD and RP designated. Site preparation inspection required, call ###-####.
|
Routing - MECHANICAL | 11/29/2016 | | 11/30/2016 | | FAIL |
Troy James
|
|
|
left voice message
|
Routing PW Grading-Hillside | 11/29/2016 | | 11/30/2016 | | FAIL |
Jason C. Taylor
|
|
|
see notes in ePlan. JCT
|
Routing - MECHANICAL | 11/30/2016 | | 11/30/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 11/29/2016 | | 11/29/2016 | | PASS |
Nicolette Womack
|
|
|
|
Routing - Addressing | 11/29/2016 | | 11/29/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 11/29/2016 | | 11/29/2016 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 11/29/2016 | | PASS |
|
|
|
intake complete - plan review fee due
|
Plans ACCEPTED BY PLAN TECH | | | 11/29/2016 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/29/2016 | | DONE |
|
|
|
|
Application received | | | 10/20/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 20 2016 8:26AM
|