Information based on query as of Friday, June 21, 2024.
Permit Information
Permit NumberBLD16-03872
StatusFinaled
Name HC COMPANY INC
Site Address 2965 S FEATHERLY WY
Project NameFlorida Tile
Customer Number 
ePlanReviewYes
Description
(FLORIDA TILE) This building is sprinklered for area increase. Permit is to remodel an existing 10,410 sq. ft. warehouse/office by combining a portion of the adjacent vacant space created under BLD14-00496 and adding 8,000 sq. ft. of warehouse to the existing tenant for a total of 18,410 sq. ft. warehouse/office tenant space. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of interior non-load bearing wall between spaces for new opening, construction of new interior non-load bearing demising wall, select new light fixtures, electrical work, mechanical work and interior finishes in compliance with chapter 8 of the 2012 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 12/12/201612/14/2016 DONE
Mailed 12-15
BLD-Final12/1/201612/2/201612/2/2016APASS
DetailsMike Jordan
sean Phone #: ###-####. Ok for perm occ.
Permanent Occupancy  12/2/2016 DONE
BLD-Final12/1/201612/1/201612/1/2016PCANC
DetailsMike Jordan
shawn Phone #: ###-####. Moved to am inspection.
FIRE-Final Inspection11/28/201611/29/201611/29/2016APASS
DetailsTroy Cobbley
Life safety passed. TVFP is going to do the annual inspection
BLD-Framing/Rough-in11/21/201611/22/201611/22/2016APART
DetailsMike Jordan
sean Phone #: ###-####. No approved city plans on site. Steel stud welding requires special inspection. New steel header for new opening ok.
BLD-Framing/Rough-in11/17/201611/18/201611/18/2016APART
DetailsJim Sly
Shawn Phone #: ###-####
East /West demising wall......Located at North end of project (grid line E) OK to cover.
Issue PAID IN FULL permit  11/10/2016 DONE
Print Occupancy Form  11/10/2016 DONE
Plan assigned to (JG)10/27/201610/27/201611/9/2016 PASS
DetailsJavier Guzman
11/09 L2 Florida Tile Expansion ePlan
Routing - PLAN CHECK10/27/2016 11/9/2016 PASS
DetailsJavier Guzman
1st review completed  11/9/2016 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  11/9/2016 DONE
Permit Ready to Issue  11/9/2016 DONE
DetailsChristina Prado
All met/// C_P
needs; GC form & revised cert of value
Routing - FIRE11/8/201611/8/201611/8/2016 PASS
DetailsKatie Marron
A Separate Fire Permit will be required for the intended improvements. No racking is authorized under this permit in the new tenant space; the existing space has a racking permit on file. No further comments attached.
Routing - PUBLIC WORKS10/27/2016 10/28/2016 PASS
DetailsRachael Beierle
Routing - Addressing10/27/2016 10/27/2016 PASS
DetailsEmily Dixon
Intake Approval  10/27/2016 PASS
DetailsJavier Guzman
Application received  10/20/2016 DONE
Application submitted via PDS Online on Oct 20 2016 8:44AM