BLD-Final | 2/17/2017 | 2/17/2017 | 2/17/2017 | P | NR |
Jim Sly
|
|
|
Jason Phone #: ###-####
|
BLD-Energy code compliance | 12/1/2016 | 12/2/2016 | 12/2/2016 | P | PASS |
Mike Jordan
|
|
|
Jason Phone #: ###-####
|
BLD-Energy code compliance | 11/30/2016 | 11/30/2016 | 11/30/2016 | P | PASS |
Mike Jordan
|
|
|
Ok to cover kitchen floor.
|
BLD-Energy code compliance | 11/29/2016 | 11/30/2016 | 11/30/2016 | A | CANC |
Mike Jordan
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 11/30/2016 | 11/30/2016 | 11/30/2016 | A | PASS |
Mike Jordan
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 11/23/2016 | 11/28/2016 | 11/28/2016 | P | NR |
Mike Jordan
|
|
|
Jason Phone #: ###-####. Needs to complete airseal. Also needs to draftstop all fur downs in basement, around chmney upstairs.
|
Routing Walk-In (BLD) | 10/21/2016 | 10/21/2016 | 10/21/2016 | P | PASS |
David Ferguson
|
|
|
|
Plan assigned to (DAF) | 10/21/2016 | 10/21/2016 | 10/21/2016 | | DONE |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 10/21/2016 | | 10/21/2016 | | PASS |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 10/21/2016 | | DONE |
David Ferguson
|
|
|
|
Inspection Record Card- Bld | | | 10/21/2016 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/21/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/21/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/21/2016 | | DONE |
|
|
|
|
1st review completed | | | 10/21/2016 | | DONE |
David Ferguson
|
|
|
|
Routing Walk-In (BLD) | 10/20/2016 | 10/20/2016 | 10/20/2016 | P | FAIL |
David Ferguson
|
|
|
Need details of floor system in the converted garage that shows how is constructed and vented. Need details/section of new front porch. The entire roof on the home will be converted from a 2:12 pitch to a 5:12 pitch with engineered trusses. This applicant was red tagged for doing work without a building permit. All new walls in basement creating new bedrooms with new egress windows.
|
Application received | | 10/20/2016 | | | |
|
|
|
|