BLD-Final | 2/7/2017 | 2/8/2017 | 2/8/2017 | A | PASS |
Jim Storey
|
|
|
Please call 30 mins prior to inspection. 208 ###-#### Sean Crowley Inspection requested via web by Sean Crowley
|
DOC - Permit Finaled | 2/8/2017 | 2/8/2017 | 2/8/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Wall cover | 1/6/2017 | 1/9/2017 | 1/9/2017 | A | PASS |
Jim Storey
|
|
|
Please call 30 mins prior to arrival. Phone #: ###-#### Inspection requested via web by Sean Crowley
|
BLD-Framing/Rough-in | 1/4/2017 | 1/5/2017 | 1/6/2017 | A | DEFR |
Jim Storey
|
|
|
Please call 45 mins prior to arrival. The neighborhood roads are not plowed. If possible I can meet the inspector and bring him to the jobsite Phone #: ###-#### Inspection requested via web by Sean Crowley
|
BLD-Framing/Rough-in | 1/5/2017 | 1/6/2017 | 1/6/2017 | A | PASS |
Jim Storey
|
|
|
Please call 45 mins prior to arrival. The neighborhood roads are not plowed. If possible I can meet the inspector and bring him to the jobsite Phone #: ###-#### Inspection requested via web by Sean Crowley
|
BLD-Foundation | 12/7/2016 | 12/8/2016 | 12/8/2016 | A | PASS |
Jim Storey
|
|
|
John Phone #: ###-####
|
BLD-Footing | 12/6/2016 | 12/7/2016 | 12/7/2016 | A | FAIL |
Jim Storey
|
|
|
John Phone #: ###-#### to cold need heat
|
OVERRIDE | | | 11/28/2016 | | |
|
|
|
|
Routing Walk-In (Zoning) | 11/28/2016 | 11/28/2016 | 11/28/2016 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 11/28/2016 | 11/28/2016 | 11/28/2016 | A | PASS |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 11/28/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/28/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/28/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/28/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (REV) | | | 11/28/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/28/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 10/21/2016 | | |
|
|
|
|
Telephone call | | | 10/21/2016 | | DONE |
|
|
|
called Keilty Remodeling tof let know permit is ready and how much is owed-also that we need the RP-left message on office phone
|
Permit Ready to Issue | | | 10/21/2016 | | DONE |
|
|
|
***all requirements met 11-28-16***need RP
|
Routing Walk-In (Zoning) | 10/20/2016 | 10/20/2016 | 10/20/2016 | P | PASS |
Colleen T Carroll
|
|
|
|
Plan assigned to (BJM) | 10/20/2016 | 10/20/2016 | 10/20/2016 | | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 10/20/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 10/20/2016 | | 10/20/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 10/20/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 10/20/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/20/2016 | | DONE |
Brian McGowan
|
|
|
|
Application received | | 10/20/2016 | | | |
|
|
|
|