First Notice | 10/20/2017 | 10/20/2017 | 11/14/2017 | | DONE |
Jim Sly
|
|
|
Mailed 11-15-17
|
BLD-Final | 10/20/2017 | 10/20/2017 | 10/20/2017 | P | PASS |
Jim Sly
|
|
|
Ken Phone #: ###-####
|
DOC - Permit Finaled | 10/20/2017 | 10/20/2017 | 10/20/2017 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 10/16/2017 | 10/17/2017 | 10/17/2017 | A | NR |
Jim Sly
|
|
|
Ken Phone #: ###-#### Need Zoning and Plumbing final.
|
Zoning Approval | 10/17/2017 | 10/17/2017 | 10/17/2017 | | PASS |
Sarah Schafer
|
|
|
|
FIRE-Final Inspection | 10/10/2017 | 10/11/2017 | 10/11/2017 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Ken was going to install the address on both sides of the building prior to a building sign off. I discussed providing the small documents to the building inspector Ken Phone #: ###-####
|
FIRE-Final Inspection | 10/9/2017 | 10/10/2017 | 10/10/2017 | A | FAIL |
Troy Cobbley
|
|
|
Need the city approved plans, need building address, need stickers at doors, need tags on fire extinguishers. Emergency lights and exit signs tested ok.
Ken Phone #: ###-####
|
FIRE-Final Inspection | 10/6/2017 | 10/9/2017 | 10/9/2017 | P | FAIL |
Troy Cobbley
|
|
|
Left message on voice mail that I would be there in 20 or 30 minutes. Arrive at job site but had no contact or access. I left another voice message to re-schedule.
Ken-please call 30 minutes prior to meet for access Phone #: ###-####
|
PubWorks Occupancy Approval | 9/27/2017 | 9/27/2017 | 9/27/2017 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Wall cover | 8/14/2017 | 8/15/2017 | 8/16/2017 | P | PASS |
Jim Sly
|
|
|
dry wall- ken Phone #: ###-#### 1hr wall....OK
|
BLD-Energy code compliance | 8/3/2017 | 8/4/2017 | 8/4/2017 | P | PASS |
Jim Sly
|
|
|
Ken Phone #: ###-####
|
BLD-Framing/Rough-in | 7/28/2017 | 7/31/2017 | 8/1/2017 | P | PASS |
Jim Sly
|
|
|
Ken Phone #: ###-####
|
BLD-Conference | 7/10/2017 | 7/11/2017 | 7/11/2017 | A | DONE |
Jim Sly
|
|
|
Call ahead for access - Ken Phone #: ###-####
|
BLD-Other | 6/22/2017 | 6/23/2017 | 6/23/2017 | A | PASS |
Jim Sly
|
|
|
fire tape sheetrock (between 10-noon) // Sharm Phone #: ###-#### Exterior side of East wall.....5/8 rock installation.....OK.
|
BLD-Other | 6/7/2017 | 6/7/2017 | 6/7/2017 | P | DONE |
Jim Sly
|
|
|
Sean Phone #: ###-#### Perimeter foundation insulation OK
|
BLD-Footing | 5/19/2017 | 5/22/2017 | 5/22/2017 | A | PASS |
Jim Sly
|
|
|
prefer around 10am // Shawn Nelson Phone #: ###-#### OK pending Geotech special insp, tests and approvals.
|
BLD-Foundation | 5/16/2017 | 5/17/2017 | 5/17/2017 | P | DONE |
Jim Sly
|
|
|
Rebar // Sean Phone #: ###-#### Pre-Construction Conference. GeoTech will be doing all special inspections.
|
Issue PAID IN FULL permit | | | 3/17/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/17/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/17/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 3/6/2017 | | |
|
|
|
|
Plan assigned to (CJW) | 10/26/2016 | 10/26/2016 | 3/6/2017 | | PASS |
Carl Westfall
|
|
|
(4th done) (Nov 15 - 15 days) Skyvue Business park - new bldg
|
Routing - PLAN CHECK | 3/2/2017 | | 3/6/2017 | | PASS |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/6/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/6/2017 | | DONE |
|
|
|
***all requirments met 3-7-17 /CEV
Need GC Form and Revised Cert of Value
|
Routing PW Drainage | 3/2/2017 | | 3/3/2017 | | PASS |
Jason C. Taylor
|
|
|
|
Plan resubmittals received | | | 3/2/2017 | | DONE |
|
|
|
|
Routing PW Drainage | 2/24/2017 | | 2/28/2017 | | FAIL |
Jason C. Taylor
|
|
|
|
Plan resubmittals requested | | | 2/28/2017 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/24/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/24/2017 | | 2/24/2017 | | PASS |
Carl Westfall
|
|
|
Passed the 4th review
|
Plan resubmittals requested | | | 2/16/2017 | | DONE |
|
|
|
|
Routing PW Drainage | 2/8/2017 | | 2/15/2017 | | FAIL |
Brian Murphy
|
|
|
NEEDS GEO-TECT PER JASON AND JIM W. WRITE UP CHANGE.
|
Routing PW Solid Waste | 2/8/2017 | | 2/10/2017 | | PASS |
Evan Carpenter
|
|
|
Solid waste is OK as planned.
|
Routing - PLAN CHECK | 2/8/2017 | | 2/9/2017 | | FAIL |
Carl Westfall
|
|
|
The method of insulating and venting the roof has not been resolved.
|
Plan resubmittals received | | | 2/8/2017 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 12/22/2016 | | DONE |
|
|
|
All agencies done with 2nd review
|
Routing PW Drainage | 12/8/2016 | | 12/21/2016 | | FAIL |
Brian Murphy
|
|
|
NEED GEOTECH AND APDX J
|
Routing - Design Review | 12/8/2016 | | 12/14/2016 | | PASS |
Josh Wilson
|
|
|
|
Routing PW Solid Waste | 12/8/2016 | | 12/12/2016 | | FAIL |
Evan Carpenter
|
|
|
There needs to be 12’ of clearance between the gate posts on the solid waste enclosure to ensure that the dumpster can be serviced properly.
|
Routing - MECHANICAL | 12/8/2016 | | 12/9/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 12/7/2016 | | 12/9/2016 | | FAIL |
Carl Westfall
|
|
|
See the abbreviated plan review report
|
Plan resubmittals requested | | | 12/9/2016 | | DONE |
|
|
|
Did the IBC plan review before routing. Emailed the Architect an abbreviated IBC plan review report. Waiting for a response while other agencies do their resubmittal reviews.
|
Plan resubmittals received | | | 12/7/2016 | | DONE |
|
|
|
|
Route to Impact Fee Review | 11/25/2016 | 11/28/2016 | 11/29/2016 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 11/25/2016 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 11/25/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/26/2016 | | 11/25/2016 | | FAIL |
Carl Westfall
|
|
|
See the plan review report
|
Routing Off Site - STRUCTURAL | 10/26/2016 | | 11/4/2016 | | PASS |
Carl Westfall
|
|
|
Chris Holladay AHJ
|
Routing PW Drainage | 10/26/2016 | | 10/31/2016 | | FAIL |
Brian Murphy
|
|
|
ALL DRAINAGE REPORTS ECT
|
Routing - Erosion and Sediment | 10/26/2016 | | 10/28/2016 | | PASS |
Andy J. Long
|
|
|
ESC site map and narrative submitted and approved. Vald RP and PD designated. Site preparation inspection required, call ###-#### or ###-####
|
Routing - PLUMBING | 10/26/2016 | | 10/28/2016 | | PASS |
Bill VanDegrift
|
|
|
civil on esc plan
thermol expansion protection required
|
Routing - Design Review | 10/26/2016 | | 10/28/2016 | | FAIL |
Josh Wilson
|
|
|
Provide two bicycle parking spaces and planter boxes on teh osuth elevation fo the building per DRH16-00107.
|
Routing - MECHANICAL | 10/26/2016 | | 10/27/2016 | | FAIL |
Troy James
|
|
|
|
Routing - PLANNING | 10/26/2016 | | 10/27/2016 | | PASS |
Ted Vanegas
|
|
|
|
Routing - PLANNING Land Div | 10/26/2016 | | 10/27/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing PW Solid Waste | 10/26/2016 | | 10/27/2016 | | FAIL |
Evan Carpenter
|
|
|
There needs to be 12’ of clearance between the gate posts on the solid waste enclosure to ensure that the dumpster can be serviced properly.
|
Routing PW Street Lights | 10/26/2016 | | 10/27/2016 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Sewer Design | 10/26/2016 | | 10/27/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Connecting to existing stub.
|
Routing - FIRE | 10/26/2016 | 10/26/2016 | 10/26/2016 | | PASS |
Katie Marron
|
|
|
Basic life safety requirements. No comments required.
|
Routing - Addressing | 10/26/2016 | | 10/26/2016 | | PASS |
Laura Hunter
|
|
|
Suites 100, 110, 120 & 130
|
Routing - PUBLIC WORKS | 10/26/2016 | | 10/26/2016 | | PASS |
Rachael Beierle
|
|
|
|
Plan Reviewer's activity | | | 10/26/2016 | | DONE |
|
|
|
Pre-screen approved
|
Intake Approval | | | 10/26/2016 | | PASS |
|
|
|
|
Intake Approval | | | 10/24/2016 | | FAIL |
|
|
|
Please provide the form 502 checklist with all required documents.
Please correct the orientation of some of the plan sheets. All sheets are required to be uploaded in a horizontal orientation.
|
Application received | | | 10/21/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 21 2016 12:51PM
|