BLD-Final | 11/2/2017 | 11/3/2017 | 11/3/2017 | A | PASS |
Brandon Shaw
|
|
|
Mark Phone #: ###-####
|
DOC - Permit Finaled | 11/3/2017 | 11/3/2017 | 11/3/2017 | P | PASS |
Brandon Shaw
|
|
|
|
Zoning Approval | 11/1/2017 | 11/1/2017 | 11/1/2017 | | PASS |
Ted Vanegas
|
|
|
|
BLD-Energy code compliance | 10/3/2017 | 10/4/2017 | 10/4/2017 | A | PASS |
Mike Jordan
|
|
|
Frank Phone #: ###-####
|
BLD-Framing/Rough-in | 9/28/2017 | 9/28/2017 | 9/28/2017 | P | PASS |
Tony Young
|
|
|
fRANK Phone #: ###-####,, garage ok
|
BLD-Wall Bracing | 9/5/2017 | 9/6/2017 | 9/6/2017 | A | PASS |
Dave Hannah
|
|
|
Frank Aldana Phone #: ###-####
|
BLD-Foundation | 7/31/2017 | 8/1/2017 | 8/1/2017 | A | PASS |
Brandon Shaw
|
|
|
Concrete at 10 // Adam Phone #: ###-####
|
BLD-Footing | 7/31/2017 | 7/31/2017 | 7/31/2017 | P | PASS |
Tony Young
|
|
|
Concrete at 1 // Adam Phone #: ###-####.. garage footings ok
|
BLD-Energy code compliance | 7/7/2017 | 7/10/2017 | 7/10/2017 | A | PASS |
Tony Young
|
|
|
Frank Aldana// insulation Phone #: ###-####
|
BLD-Framing/Rough-in | 7/6/2017 | 7/7/2017 | 7/7/2017 | A | PASS |
Tony Young
|
|
|
Frank Aldana// 2nd insp for fireblocking and insulation Phone #: ###-####
|
BLD-Framing/Rough-in | 6/29/2017 | 6/30/2017 | 6/30/2017 | A | PASS |
Jim Sly
|
|
|
Mark Phone #: ###-#### Pass when all corrections completed....C/N posted. OK to insulate
|
Plan Modification Accepted | | | 5/30/2017 | | DONE |
|
|
|
revised acca report
|
Routing - MECHANICAL | 5/30/2017 | | 5/30/2017 | | PASS |
Chad Schwendiman
|
|
|
revised acca report
|
BLD-Wall Bracing | 5/18/2017 | 5/19/2017 | 5/19/2017 | A | PASS |
Brandon Shaw
|
|
|
Shear // Frank or ###-#### Carlos Phone #: ###-####
|
OVERRIDE | | | 4/21/2017 | | |
|
|
|
|
Routing Walk-In (BLD) | 4/6/2017 | 4/6/2017 | 4/21/2017 | A | DONE |
Carl D Madsen
|
|
|
|
Plan assigned to (BJM) | 4/6/2017 | 4/6/2017 | 4/21/2017 | | DEFR |
Brian McGowan
|
|
|
FAIL - Missing the structure for the upper floors over the Garage and Home. No sections were provided for these areas.
|
Telephone call | | | 4/21/2017 | | DONE |
|
|
|
called mark and left vm plan mod is ready and fee
|
(F) Reprint permit | | | 4/21/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/21/2017 | | DONE |
|
|
|
Plan Mod
|
Routing - PLAN CHECK | 4/21/2017 | | 4/21/2017 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 4/21/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/21/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/21/2017 | | DONE |
|
|
|
all requirements met/ plan mod only - do not reissue
|
Plan resubmittals received | | | 4/20/2017 | | DONE |
Christina Prado
|
|
|
Received two sets of revised plan sheets marked A3.0, A4.0, A5.0, A7.0 & A9.0, as well as two sets of Truss details and load calculations; PLans stamped and taken to Plan Review for review and approval
|
Routing - PLAN CHECK | 4/6/2017 | | 4/18/2017 | | FAIL |
Brian McGowan
|
|
|
Missing the structure for the upper floors over the Garage and Home. No sections were provided for these areas.
|
Plan Modification Accepted | | | 4/13/2017 | | DONE |
|
|
|
revised acca report
|
Routing - MECHANICAL | 4/13/2017 | | 4/13/2017 | | PASS |
Chad Schwendiman
|
|
|
revised acca report
|
Routing - MECHANICAL | 4/6/2017 | | 4/11/2017 | | FAIL |
Troy James
|
|
|
Emailed correction to northwest heating
|
Routing Walk-In (Zoning) | 4/6/2017 | 4/6/2017 | 4/6/2017 | A | PASS |
Katelyn Menuge
|
|
|
|
BLD-Other | 2/24/2017 | 2/24/2017 | 2/24/2017 | P | PEND |
Bob Archibald
|
|
|
New COA issued 2/1/17 for demolition of remaining structure. A new building permit and DRH required before verticle construction can resume
|
BLD-Foundation | 1/9/2017 | 1/9/2017 | 1/10/2017 | P | PART |
Tony Young
|
|
|
Rebar .... Call 15 mins before to meet // Rob Phone #: ###-####,, basement walls ok
|
BLD-Foundation | 12/21/2016 | 12/28/2016 | 12/28/2016 | P | CANC |
Phil Shearer
|
|
|
Rebar // Rob ###-####
|
BLD-Footing | 12/7/2016 | 12/7/2016 | 12/7/2016 | P | PASS |
Phil Shearer
|
|
|
Pour at 330 // JR Phone #: ###-####
|
OVERRIDE | | | 10/26/2016 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/26/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/26/2016 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 10/24/2016 | | 10/26/2016 | | DONE |
Tisha Gallop
|
|
|
1st review 10/25; need porch details
|
Routing - PLAN CHECK | 10/26/2016 | | 10/26/2016 | | PASS |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 10/26/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/26/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/26/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/26/2016 | | DONE |
|
|
|
|
Routing - MECHANICAL | 10/24/2016 | | 10/25/2016 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLAN CHECK | 10/25/2016 | | 10/25/2016 | | FAIL |
Tisha Gallop
|
|
|
called applicant and left voicemail, need construction details for front porch remodel.
|
1st review completed | | | 10/25/2016 | | FAIL |
|
|
|
|
Routing Walk-In (Zoning) | 10/24/2016 | 10/24/2016 | 10/24/2016 | P | PASS |
Ted Vanegas
|
|
|
|
Routing Walk-In (BLD) | 10/24/2016 | 10/24/2016 | 10/24/2016 | P | CANC |
Tisha Gallop
|
|
|
took in as level 2; routed to mech.
|
Application received | | 10/24/2016 | | | |
|
|
|
|