Information based on query as of Sunday, June 23, 2024.
Permit Information
Permit NumberBLD16-03924
StatusFinaled
Name EAGLE MATERIAL HANDLING LLC
Site Address 8455 W WESTPARK ST
Project NamePatrick Industries-Racking
Customer Number 
ePlanReviewNo
Description
(PATRICK INDUSTRIES - RACKING PERMIT) Permit to add 12 foot tall storage racking in an existing warehouse building 456. Work to include: installation of three different configuations prefabricated 12 foot tall storage racking including seismic bolting to existing slab. Approval of this permit is contingent on adhering to approved plans and engineering. The design, testing and utilization of industrial steel storage racks shall be in accordance with the RMI Specification for the Design, Testing and Utilization of Industrial Steel Storage Racks. (Special inspections on the anchor bolts are required per ICC/ESR - 3520)**RMH** Orignal Tenant Improvment under BLD16-00142
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice12/16/201612/16/20161/10/2017 DONE
DetailsMike Jordan
Mailed 1-11
BLD-Final12/12/201612/16/201612/16/2016APASS
DetailsMike Jordan
Please call ahead for access - James Phone #: ###-####
DOC - Permit Finaled12/16/201612/16/201612/16/2016PPASS
DetailsMike Jordan
FIRE-Final Inspection12/12/201612/12/201612/12/2016PPASS
DetailsTroy Cobbley
Life safery passed
BLD-Final12/7/201612/7/201612/7/2016PNR
DetailsMike Jordan
Jamey ###-####. Needs fire/life/safety final first.
Issue PAID IN FULL permit  12/1/2016 DONE
Plan assigned to (RMH)11/29/201611/29/201611/30/2016 PASS
DetailsRon Hill
PLANS/APPL TAKEN TO FRONT DESK  11/30/2016 DONE
Permit Ready to Issue  11/30/2016 DONE
All Met GC turned in Application/plans
Inspection Record Card- Bld  11/30/2016 DONE
Telephone call  11/30/2016 DONE
called Brent- told him permit is ready and fees due
1st review completed  11/30/2016 DONE
DetailsRon Hill
Routing - FIRE11/28/201611/18/201611/29/2016 PASS
DetailsKatie Marron
Comments attached
Plan assigned to (DAF)11/18/201611/18/201611/29/2016 DEFR
DetailsDavid Ferguson
due 11/29 Patrick Industries Racking Level II Paper
Routing - PLAN CHECK11/16/2016 11/29/2016 PASS
DetailsRon Hill
Pending Assignment by AJS11/16/2016 11/18/2016 DONE
DetailsAdele J Schaffeld-Griffin
Intake Approval  11/16/2016 PASS
DetailsTim Frost
Intake Approval  11/16/2016 PASS
Plans ACCEPTED BY PLAN TECH  11/16/2016 DONE
Recd Pcfee & Taken To Pln CK  11/16/2016 DONE
Intake Approval  11/8/2016 FAIL
Applicant is still missing required information.
Telephone call  11/8/2016 DONE
called Brent to let know that the application is not complete and they need to come pick up and complete before we can take them in. Emailed Aaron the checklist that Tim Frost re lined for intake
Intake Approval  11/1/2016 FAIL
Sent the following email to the contact person.

Sent the following email to the contact.

The project is missing most of the information. Please, go to our website CItyofBoise.org. Get form #516. Complete ALL of the items. There are a number of additional forms which are required. Upload form #516 and the other forms.
Application received  10/25/2016 DONE
Application submitted via PDS Online on Oct 25 2016 1:44PM