First Notice | | 3/11/2017 | 3/9/2017 | | DONE |
Christina Prado
|
|
|
completed 3/9/17
|
BLD-Final | 2/28/2017 | 3/1/2017 | 3/1/2017 | A | PASS |
Tony Young
|
|
|
John Phone #: ###-####
|
Permanent Occupancy | | | 3/1/2017 | | DONE |
|
|
|
|
FIRE-Final Inspection | 2/28/2017 | 2/28/2017 | 2/28/2017 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete, final fire alarm inspection complete, final commercial hood fire suppression system inspection complete, fire extinguishers are mounted with current inspection tags, building has a knox box. Final life fire safety inspection passed/complete
|
Print Occupancy Form | | | 2/28/2017 | | DONE |
|
|
|
|
BLD-Conference | 2/14/2017 | 2/15/2017 | 2/15/2017 | A | PASS |
Tony Young
|
|
|
John Phone #: ###-####,, exit sign ?s
|
BLD-Conference | 2/13/2017 | 2/14/2017 | 2/14/2017 | A | DEFR |
Tony Young
|
|
|
John Phone #: ###-####
|
FIRE-Conference | 2/13/2017 | 2/14/2017 | 2/14/2017 | A | DONE |
Troy Cobbley
|
|
|
John and I discussed the placement of the exit signs due to the full height wall now being only 5' high. I deferred him also to the building inspector for secondary approval.
|
BLD-Framing/Rough-in | 1/23/2017 | 1/23/2017 | 1/23/2017 | P | PART |
Tony Young
|
|
|
John Phone #: ###-####,, walls ok
|
Issue PAID IN FULL permit | | | 1/20/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/20/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 1/19/2017 | | |
|
|
|
|
Plan assigned to (CJW) | 11/10/2016 | 11/10/2016 | 1/19/2017 | | PASS |
Carl Westfall
|
|
|
(3rd done) (Nov 30 - 15 days) Native Grill Major TI E Plan
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/19/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/19/2017 | | DONE |
Christina Prado
|
|
|
All requirements met 1/19/17 C_P //// Needs; GC Form, Revised Cert of Value, RP
|
Routing - MECHANICAL | 1/18/2017 | | 1/19/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 1/17/2017 | | 1/18/2017 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLUMBING | 1/18/2017 | | 1/18/2017 | | PASS |
Bill VanDegrift
|
|
|
Some changes to the plumbing sheets
1) ISPC 910, no vertical waste piping allowed on combination waste and vent systems.
2) waste piping and traps to be two pipe sizes larger than fixture tailpieces on combination waste and vent systems.
3) trap all fixtures.
4) VTR at bar.
|
Plan resubmittals received | | | 1/17/2017 | | DONE |
|
|
|
|
Routing - Design Review | 12/19/2016 | | 12/23/2016 | | PASS |
Josh Wilson
|
|
|
|
Plan resubmittals requested | | | 12/23/2016 | | DONE |
|
|
|
|
Routing PW Environmental | 12/19/2016 | | 12/22/2016 | | PASS |
Rick Christenson
|
|
|
Exterior Interceptor Verified
|
Routing - PLUMBING | 12/19/2016 | | 12/21/2016 | | PASS |
Bill VanDegrift
|
|
|
Venting required on bar area fixtures and 4 inch VTR required. Install plumbing per ISPC.
|
Routing - MECHANICAL | 12/19/2016 | | 12/21/2016 | | FAIL |
Troy James
|
|
|
|
Plan resubmittals received | | | 12/19/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/19/2016 | | 12/19/2016 | | FAIL |
Carl Westfall
|
|
|
|
1st review completed | | | 12/2/2016 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 12/2/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/10/2016 | | 12/2/2016 | | FAIL |
Carl Westfall
|
|
|
1st review completed
|
Routing PW Environmental | 11/10/2016 | | 11/21/2016 | | FAIL |
Rick Christenson
|
|
|
Required 1500 Gallon Grease Exterior Interceptor. Proper Plumbing plans required for approval.
|
Plan Reviewer's activity | | | 11/18/2016 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
Left message with Galloway (Katie) in regards to needed ACHD fees verifed or paid at permit issuance.
|
Routing - MECHANICAL | 11/10/2016 | | 11/18/2016 | | FAIL |
Troy James
|
|
|
|
Routing - FIRE | 11/10/2016 | 11/10/2016 | 11/15/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing - PLUMBING | 11/10/2016 | | 11/15/2016 | | FAIL |
Bill VanDegrift
|
|
|
1) provide hot and cold rp's for the pressure washer
2) provide plumbing plans
|
Routing - Addressing | 11/10/2016 | | 11/10/2016 | | PASS |
Laura Hunter
|
|
|
Added suite number 110
|
Routing - PUBLIC WORKS | 11/10/2016 | | 11/10/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 11/10/2016 | | 11/10/2016 | | PASS |
Andy J. Long
|
|
|
|
Routing - Design Review | 11/10/2016 | | 11/10/2016 | | PASS |
Josh Wilson
|
|
|
|
Intake Approval | | | 11/10/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Intake Approval | | | 10/27/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please see mark ups on check list for missing information.
|
Application received | | | 10/26/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 26 2016 4:28PM
|