FIRE-Final Inspection | 9/29/2017 | 9/29/2017 | 9/29/2017 | P | FAIL |
Troy Cobbley
|
|
|
All items are corrected except the additional exit sign in the intermediate room between the front office and warehous. Brian Phone #: ###-####
|
BLD-Aging Inspection | 8/24/2017 | 8/24/2017 | 8/25/2017 | | PEND |
Mike Jordan
|
|
|
Stop by t speak with tenant. Still needs to remove lock at exit and provide additional exit sign. Noted to tenant to have completed and call for inspections.
|
BLD-Final | 4/11/2017 | 4/12/2017 | 4/12/2017 | A | NR |
Mike Jordan
|
|
|
Brian Phone #: ###-####. Fire/life/safety failed.
|
FIRE-Final Inspection | 4/11/2017 | 4/11/2017 | 4/11/2017 | P | FAIL |
Troy Cobbley
|
|
|
Provide annual inspection for the fire extinguishers, provide verification of annual inspections for the building fire sprinkler and fire alarm systems, provide exit signs as per the city approved plans and remove the locking hardware from the warehouse to office area. Or call plan review and get exiting updated to utilize the warehouse door not shown on the plans. Also provide testing of the existing exit signs and emergency lights. Provide sticker at the main exit
|
Issue PAID IN FULL permit | | | 4/11/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/11/2017 | | DONE |
|
|
|
|
Telephone call | | | 4/10/2017 | | DONE |
|
|
|
Rob called in regards to the letter. I informed him that the permit for occupancy for the space and it's going to expire on the 25th of this month
|
Expiration Notice | 4/4/2017 | 4/25/2017 | 4/4/2017 | | DONE |
Brittany Hill
|
|
|
|
Plan assigned to (JG) | 10/27/2016 | 10/27/2016 | 11/1/2016 | | PASS |
Javier Guzman
|
|
|
11/02 L2 Alcal Specialty Construction Inc Occ Eval
|
Routing - PLAN CHECK | 10/31/2016 | | 11/1/2016 | | PASS |
Javier Guzman
|
|
|
|
Routing - FIRE | 10/31/2016 | | 11/1/2016 | | PASS |
Scott Arellano
|
|
|
Inspector to verify basic Fire Life Safety requirements. No comments required.
|
1st review completed | | | 11/1/2016 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 11/1/2016 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/1/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/1/2016 | | DONE |
|
|
|
|
Telephone call | | | 11/1/2016 | | DONE |
|
|
|
called Rob to let know permit is ready-left message on his phone
|
Print Occupancy Form | | | 11/1/2016 | | DONE |
|
|
|
|
Routing PW Environmental | 10/28/2016 | | 10/31/2016 | | PASS |
Rick Christenson
|
|
|
|
Routing - PUBLIC WORKS | 10/28/2016 | | 10/31/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Addressing | 10/27/2016 | | 10/28/2016 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/27/2016 | | DONE |
|
|
|
|
Intake Approval | | | 10/27/2016 | | PASS |
Javier Guzman
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/27/2016 | | DONE |
|
|
|
|
Application received | | 10/27/2016 | | | |
|
|
|
|