BLD-Final | 5/12/2017 | 5/15/2017 | 5/16/2017 | P | DONE |
Dave Hannah
|
|
|
Mark Phone #: ###-####
|
BLD-Final | 5/16/2017 | 5/16/2017 | 5/16/2017 | A | PASS |
Dave Hannah
|
|
|
Mark Phone #: ###-####
|
DOC - Permit Finaled | 5/16/2017 | 5/16/2017 | 5/16/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 2/28/2017 | 3/1/2017 | 3/1/2017 | A | PASS |
Dave Hannah
|
|
|
would like call ahead; Mark Phone #: ###-####
|
BLD-Energy code compliance | 3/1/2017 | 3/1/2017 | 3/1/2017 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 1/3/2017 | 1/3/2017 | 1/3/2017 | P | PASS |
Dave Hannah
|
|
|
ben Phone #: ###-####
|
BLD-Framing/Rough-in | 11/17/2016 | 11/18/2016 | 11/19/2016 | A | PART |
Dave Hannah
|
|
|
Ben-Partial Phone #: ###-#### grond floor ok ok to insulate
|
Routing Walk-In (BLD) | 11/1/2016 | 11/1/2016 | 11/1/2016 | P | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 11/1/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 11/1/2016 | | 11/1/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 11/1/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 11/1/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/1/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 11/1/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/1/2016 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 10/28/2016 | 10/28/2016 | 10/28/2016 | A | FAIL |
David Ferguson
|
|
|
Need further detail for the raised floor system in the mud room for ventilation and vapor barrier. Also, are the headers at the front porch being replaced or are they going to use existing? If existing, then will they carry the load?
|
Application received | | 10/28/2016 | | | |
|
|
|
|