BLD-Final | 10/18/2017 | 10/19/2017 | 10/19/2017 | A | PASS |
Dave Hannah
|
|
|
Ed Phone #: ###-####
|
DOC - Permit Finaled | 10/19/2017 | 10/19/2017 | 10/19/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 4/14/2017 | 4/14/2017 | 4/21/2017 | | PEND |
Dave Hannah
|
|
|
|
BLD-Footing | 11/30/2016 | 12/1/2016 | 12/1/2016 | A | PASS |
Dave Hannah
|
|
|
Ed Phone #: ###-####
|
BLD-Footing | 11/29/2016 | 11/30/2016 | 11/30/2016 | P | CANC |
Dave Hannah
|
|
|
Ed Phone #: ###-####
|
Permit Ready to Issue | | | 11/16/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/16/2016 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 11/15/2016 | 11/15/2016 | 11/15/2016 | A | PASS |
Brent Moore
|
|
|
|
Routing Walk-In (BLD) | 11/15/2016 | 11/15/2016 | 11/15/2016 | P | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 11/15/2016 | | 11/15/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 11/15/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 11/15/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/15/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing Walk-In (Zoning) | 10/28/2016 | 10/28/2016 | 10/28/2016 | A | FAIL |
Brent Moore
|
|
|
Failed because adding height to existing structure therefore insuffient setbacks. Would nee a variance.
|
Routing Walk-In (BLD) | 10/28/2016 | 10/28/2016 | 10/28/2016 | A | FAIL |
David Ferguson
|
|
|
Adding to a non-conforming structure so failed by Planning. Applicant will likely demo structure and build a new garage that complies.
|
1st review completed | | | 10/28/2016 | | DONE |
Brian McGowan
|
|
|
|
Application received | | 10/28/2016 | | | |
|
|
|
|