BLD-Final | 11/17/2017 | 11/17/2017 | 11/17/2017 | A | PASS |
Jim Storey
|
|
|
Mr Story, may I get a C.O. This morning on 1203 Melrose? If I don''t get there before you the key is on the fence post in the back between the Second and third house, thanks, Danny Phone #: ###-#### Inspection requested via web by Danny Utterbeck
|
DOC - Permit Finaled | 11/17/2017 | 11/17/2017 | 11/17/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Footing | 6/29/2017 | 6/30/2017 | 6/30/2017 | A | PART |
Brandon Shaw
|
|
|
Sono tube in place at time of inspection.
|
BLD-Wall cover | 6/27/2017 | 6/28/2017 | 6/28/2017 | A | PASS |
Jim Storey
|
|
|
Jim, Insulation was completed today, may I get inspected for drywall cover. Thanks, Danny Phone #: ###-#### Inspection requested via web by Danny Utterbeck
|
BLD-Framing/Rough-in | 6/22/2017 | 6/23/2017 | 6/23/2017 | A | PART |
Jim Storey
|
|
|
Jim, may I get the framing inspection! Please advise if there is anything glaring. Thanks, Danny Phone #: ###-#### Inspection requested via web by Danny Utterbeck post at crawl need hvac
|
BLD-Wall Bracing | 6/6/2017 | 6/7/2017 | 6/7/2017 | A | PART |
Brandon Shaw
|
|
|
Jim, would take a second while out on Melrose and double check the sheer wall on 1203 Melrose? Just want to make sure we have the correction done. Phone #: ###-#### Inspection requested via web by Danny Utterbeck As per detail D-MSTC40 up stairs wall not installed. all other corrections made, OK to sied exterior.
|
BLD-Wall Bracing | 5/18/2017 | 5/19/2017 | 5/19/2017 | A | FAIL |
Jim Storey
|
|
|
Good Morning, framers contacted me and asked for sheerwall inspections sometime this morning. I will text codes to you to access permit plans. Thanks, Danny Phone #: ###-#### Inspection requested via web by Danny Utterbeck c/n on site missingstraps/hold downs/double king studs/ per aproved plan and engineering
|
BLD-Footing | 3/7/2017 | 3/7/2017 | 3/7/2017 | A | PASS |
Jim Storey
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
Issue PAID IN FULL permit | | | 2/9/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 12/22/2016 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/22/2016 | | DONE |
|
|
|
|
Telephone call | | | 12/22/2016 | | DONE |
|
|
|
Dalled Dan to let know permit is ready and how much is owed
|
Plan assigned to (LEG) Tisha | 10/31/2016 | | 12/22/2016 | | DONE |
Tisha Gallop
|
|
|
1st review 11/10; plan check & planning
|
Routing - PLAN CHECK | 11/22/2016 | | 12/22/2016 | | PASS |
Tisha Gallop
|
|
|
|
Case Summary (BLD) | | | 12/22/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/22/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/22/2016 | | DONE |
|
|
|
All Met
|
Plan resubmittals received | | | 12/15/2016 | | DONE |
|
|
|
Two copies of Lateral Calculations, two copies of sheets A0.0, A3.0, A5.0, A5.1, and A7.0. Taken to Tisha
|
Routing - PLANNING | 11/22/2016 | | 11/22/2016 | | PASS |
Andrea Tuning
|
|
|
|
Plan resubmittals received | | | 11/16/2016 | | DONE |
|
|
|
Six copies of Sheets 1, 2, 3 and 4. Taken to Tisha
|
Routing - PLANNING | 11/1/2016 | | 11/10/2016 | | FAIL |
Sarah Schafer
|
|
|
see DR review comments by Sarah Schafer
|
1st review completed | | | 11/10/2016 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 11/4/2016 | | 11/10/2016 | | FAIL |
Tisha Gallop
|
|
|
e-mailed Dan Utterbeck comments
|
Routing - MECHANICAL | 11/3/2016 | | 11/4/2016 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 11/2/2016 | | 11/3/2016 | | FAIL |
Sarah Schafer
|
|
|
DRH16-00222 - Three items not complete.
b. Location of curb, gutter and sidewalk on Melrose not shown on the site plan.
d. Copy of signed and recorded common wall agreement for attached garages not provided.
e. No detail of screen wall in the front setback provided.
Left message for Danny Utterbeck to call me back.935 AM.
|
Routing - Addressing | 10/31/2016 | | 11/1/2016 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | | | 11/1/2016 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/31/2016 | | DONE |
|
|
|
|
Intake Approval | | | 10/31/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/31/2016 | | DONE |
|
|
|
|
Application received | | 10/31/2016 | | | |
|
|
|
|