BLD-Final | 10/15/2017 | 10/16/2017 | 10/16/2017 | A | PASS |
Jim Storey
|
|
|
Jim, would like to get final inspection for C.O. This morning! Reminder that we spoke Friday and final electrical is being done Monday morning! You were going to watch for it to be done before you headed over for C.O.! Thanks, Danny Phone #: ###-#### Inspection requested via web by Danny Utterbeck
|
DOC - Permit Finaled | 10/16/2017 | 10/16/2017 | 10/16/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Footing | 6/29/2017 | 6/30/2017 | 6/30/2017 | A | PART |
Brandon Shaw
|
|
|
Sono tube in place at time of inspection.
|
BLD-Wall cover | 6/27/2017 | 6/28/2017 | 6/28/2017 | A | PASS |
Jim Storey
|
|
|
Jim, insulation was completed today, please inspect for drywall cover. Danny Phone #: ###-#### Inspection requested via web by Danny Utterbeck
|
BLD-Framing/Rough-in | 6/22/2017 | 6/23/2017 | 6/23/2017 | A | PART |
Jim Storey
|
|
|
Jim, may I get the framing inspection this morning! Please let me know if I can answer questions! Thanks, Danny Phone #: ###-#### Inspection requested via web by Danny Utterbeck pending hvac
|
BLD-Wall Bracing | 5/8/2017 | 5/9/2017 | 5/9/2017 | A | PART |
Jim Storey
|
|
|
Jim, I apologize that the framer wasn''t ready for sheer. He is who asked me to contact you Friday. He called me an hour ago or so asking for it (again). He is ready this afternoon but, it is late in the day! I left a message on your phone, please call me with comments. Danny Phone #: ###-#### Inspection requested via web by Danny Utterbeck back of house need engineering/ fire wall in garage not built corect.
|
BLD-Wall Bracing | 5/7/2017 | 5/8/2017 | 5/8/2017 | A | NR |
Jim Storey
|
|
|
Good morning, framer is asking for sheerwall inspection. The permitted plans for the job are in an army green box chained the the power pole at street. There are two pad locks the combination to the locks are 1956 and 1975. Please call with questions, Danny Phone #: ###-#### Inspection requested via web by Danny Utterbeck plan not able to access/ work not complet
|
BLD-Footing | 3/7/2017 | 3/7/2017 | 3/7/2017 | A | PASS |
Jim Storey
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
Issue PAID IN FULL permit | | | 2/9/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/9/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 1/12/2017 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/12/2017 | | DONE |
|
|
|
|
Telephone call | | | 1/12/2017 | | DONE |
|
|
|
called Danny-told him permit is ready and fees due
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/12/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/12/2017 | | DONE |
|
|
|
MET
|
Plan assigned to (LEG) Tisha | 10/31/2016 | | 1/12/2017 | | DONE |
Tisha Gallop
|
|
|
2nd review 12/22; plan check
|
Routing - PLAN CHECK | 1/11/2017 | | 1/11/2017 | | PASS |
Tisha Gallop
|
|
|
|
Case Summary (BLD) | | | 1/11/2017 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/9/2017 | | DONE |
|
|
|
Two copies of sheets A2.0, A3.0, A4.0, A6.0 and A7.0 taken to Tisha
|
Routing - PLAN CHECK | 11/22/2016 | | 12/22/2016 | | FAIL |
Tisha Gallop
|
|
|
second floor framing (possible point load); emailed Dan Utterbeck
|
Plan resubmittals received | | | 12/15/2016 | | DONE |
|
|
|
Two copies of Wall Bracing Length Calculator, two copies of sheets A0.0, A4.0, A5.0, A5.1, and A7.0. Taken to Tisha
|
Routing - PLANNING | 11/22/2016 | | 11/22/2016 | | PASS |
Andrea Tuning
|
|
|
|
Plan resubmittals received | | | 11/16/2016 | | DONE |
|
|
|
Six copies of Sheets 1, 2, 3 and 4. Taken to Tisha
|
Plan resubmittals received | | | 11/15/2016 | | DONE |
|
|
|
Received two copies of plan sheets 1,2,3,and 4 of site grading and drainage plans for sidewalks, curbs & gutters. Inserted by LEG and routed to ANT
|
Routing - PLANNING | 11/1/2016 | | 11/10/2016 | | FAIL |
Sarah Schafer
|
|
|
see DR review comments by Sarah Schafer
|
1st review completed | | | 11/10/2016 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 11/4/2016 | | 11/10/2016 | | FAIL |
Tisha Gallop
|
|
|
e-mailed Dan Utterbeck comments
|
Routing - MECHANICAL | 11/3/2016 | | 11/4/2016 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 11/2/2016 | | 11/3/2016 | | FAIL |
Sarah Schafer
|
|
|
DRH16-00222 - Three items not complete.
b. Location of curb, gutter and sidewalk on Melrose not shown on the site plan.
d. Copy of signed and recorded common wall agreement for attached garages not provided.
e. No detail of screen wall in the front setback provided.
Left message for Danny Utterbeck to call me back.935 AM.
|
Routing - Addressing | 10/31/2016 | | 11/1/2016 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | | | 11/1/2016 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/31/2016 | | DONE |
|
|
|
|
Intake Approval | | | 10/31/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/31/2016 | | DONE |
|
|
|
|
Application received | | 10/31/2016 | | | |
|
|
|
|