BLD-Final | 2/16/2018 | 2/16/2018 | 2/16/2018 | P | PASS |
Jim Storey
|
|
|
Thanks Jim, I will text the code for the garage and the location of the key. Call on your way and I will try to meet you there. Danny Phone #: ###-#### Inspection requested via web by Danny Utterbeck
|
DOC - Permit Finaled | 2/16/2018 | 2/16/2018 | 2/16/2018 | P | PASS |
Jim Storey
|
|
|
|
Zoning Approval | 2/15/2018 | 2/15/2018 | 2/15/2018 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Final | 1/17/2018 | 1/18/2018 | 1/18/2018 | A | NR |
Mike Jordan
|
|
|
Jim, time to final this one out! Anytime in the morning is great. Access to the house, I will text you the garage door code. The key to the house is sitting on the sprinkler system control in the garage and does open the back door of the house. Permitted plan is on the kitchen island. Please let me know if there is anything glaring. The house Is ready for you now so if you are in the area sooner, Thanks, Phone #: ###-#### Inspection requested via web by Danny Utterbeck. Open plumbing permit and needs zoning final.
|
BLD-Aging Inspection | 12/27/2017 | 12/27/2017 | 12/27/2017 | P | PASS |
Jim Storey
|
|
|
wip?
|
BLD-Wall cover | 8/14/2017 | 8/15/2017 | 8/15/2017 | A | PASS |
Jim Storey
|
|
|
Jim, insulation is complete and I made the corrections. Please inspect for drywall. Thanks, Danny Phone #: ###-#### Inspection requested via web by Danny Utterbeck
|
BLD-Framing/Rough-in | 8/10/2017 | 8/11/2017 | 8/11/2017 | A | PART |
Jim Storey
|
|
|
Jim.....may I get a framing inspection this morning for insulation.....the permitted plans are in the box chained to the wall in 1205 Melrose....I will text the combo to you....Danny Phone #: ###-#### king stud at dryer / patch roof vent in garage at laydown paripet ok to insulate
|
BLD-Framing/Rough-in | 8/10/2017 | 8/10/2017 | 8/11/2017 | P | NR |
Jim Sly
|
|
|
Jim, can you inspect framing for insulation this afternoon? Please call with issues I''m not far away. Danny Phone #: ###-#### Inspection requested via web by Danny Utterbeck Need plans....Check hold downs........
|
BLD-Wall Bracing | 6/14/2017 | 6/14/2017 | 6/14/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Wall Bracing | 6/6/2017 | 6/7/2017 | 6/7/2017 | A | FAIL |
Brandon Shaw
|
|
|
Good morning! Was want to get the sheer wall inspection this morning! The Box with Permitted plans is chained to the wall just inside the back of the second house. Combos are the same. Thanks Phone #: ###-#### Inspection requested via web by Danny Utterbeck Wall panel nailing- edge/field nailing- OK Hold downs as per plan, kitchen wall, missing. Detail B, pg 5.0 Hold down, per Detial D, MSTC 40, up stairs, missing. OK to cover exterior only
|
BLD-Foundation | 4/4/2017 | 4/4/2017 | 4/4/2017 | A | PASS |
Jim Storey
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 4/3/2017 | 4/3/2017 | 4/3/2017 | P | PASS |
Jim Storey
|
|
|
Ricardo Phone #: ###-####
|
Issue PAID IN FULL permit | | | 2/9/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 12/22/2016 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/22/2016 | | DONE |
|
|
|
|
Telephone call | | | 12/22/2016 | | DONE |
|
|
|
Dalled Dan to let know permit is ready and how much is owed
|
Plan assigned to (LEG) Tisha | 10/31/2016 | | 12/22/2016 | | DONE |
Tisha Gallop
|
|
|
1st review 11/10; plan check & planning
|
Routing - PUBLIC WORKS | | | 12/22/2016 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 12/22/2016 | | 12/22/2016 | | PASS |
Tisha Gallop
|
|
|
|
Case Summary (BLD) | | | 12/22/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/22/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/22/2016 | | DONE |
|
|
|
All Met
|
Plan resubmittals received | | | 12/15/2016 | | DONE |
|
|
|
Resubmittals Received 2 Lateral Calcs, sheets a2.0, A3.0, A5.0, A5.1, A7.0 & Took to Tisha
|
Plan resubmittals received | | | 12/13/2016 | | DONE |
|
|
|
received two copies of sheet A5.0 and A5.1- gave to Tisha
|
Routing Walk-In (BLD) | 11/29/2016 | 11/29/2016 | 11/29/2016 | P | CANC |
Tisha Gallop
|
|
|
no contact with customer
|
Routing - PLANNING | 11/22/2016 | | 11/22/2016 | | PASS |
Andrea Tuning
|
|
|
|
Plan resubmittals received | | | 11/16/2016 | | DONE |
|
|
|
Six copies of Sheets 1, 2, 3 and 4. Taken to Tisha
|
Case Summary (BLD) | | | 11/10/2016 | | DONE |
|
|
|
|
1st review completed | | | 11/10/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/4/2016 | | 11/10/2016 | | FAIL |
Tisha Gallop
|
|
|
e-mailed Dan Utterbeck comments
|
Routing - MECHANICAL | 11/3/2016 | | 11/4/2016 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 11/2/2016 | | 11/3/2016 | | FAIL |
Sarah Schafer
|
|
|
DRH16-00222 - Three items not complete.
b. Location of curb, gutter and sidewalk on Melrose not shown on the site plan.
d. Copy of signed and recorded common wall agreement for attached garages not provided.
e. No detail of screen wall in the front setback provided.
Left message for Danny Utterbeck to call me back.935 AM.
|
Routing - Addressing | 10/31/2016 | | 11/2/2016 | | PASS |
Emily Dixon
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/31/2016 | | DONE |
|
|
|
|
Intake Approval | | | 10/31/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/31/2016 | | DONE |
|
|
|
|
Application received | | 10/31/2016 | | | |
|
|
|
|