Permit Information
Permit NumberBLD16-04004
StatusFinaled
Name ESI
Site Address 850 W FRONT ST
Project NameBoise Centre Phase III SuperSt
Customer Number 
ePlanReviewYes
Description
**PRoject Management - Ron Hill** (BOISE CENTRE PHASE III – SUPERSTRUCTURE PACKAGE – CONVENTION CENTER EXPANSION) The fire sprinkler system is used for fire area. Demolition work, including removing the tiered concrete slabs within the former audience seating area, was done under permit BLD16-03579. To construct a new 2nd story within the former Summit Meeting Room and to do other related shell work. This permit does not establish a Certificate of Occupancy for any portion of the building. The tenant improvement work will be done under a separate future permit. Work is to include reinforced concrete footings, underground plumbing, steel columns, steel beams, concrete slabs on grade, masonry walls, masonry shearwalls, reinforced concrete floors over a metal deck, steel stair stringers, tube steel support columns for the stairway, stairway treads, steel stud walls, and metal roof decks. Special Inspection is required for soils, concrete, masonry, welding, bolting, epoxy rebar dowel anchors, epoxy anchors, expansion anchors, screw anchors, sprayed fire-resistant materials, and intumescent fire-resistant coatings. The soils report is a deferred submittal item. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to be maintained in compliance with NFPA 13 and the fire alarm system is required to be maintained in compliance with NFPA 72 during construction as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/8/201711/8/201711/8/2017PPASS
DetailsDave Hannah
Corey Phone #: ###-####
Letter of compliance/Occupancy  11/8/2017 DONE
DetailsChristina Prado
CHANGE STATUS TO (FNL)  11/8/2017 DONE
BLD-Ceiling Grid Inspection6/23/20176/23/20176/23/2017APASS
DetailsBrandon Shaw
Early a.m. ceiling grid inspection level one and level to call Adam thank you Akj Phone #: ###-#### Inspection requested via web by Adam Johnson
Issue PAID IN FULL permit  4/21/2017 DONE
(F) Reprint permit  4/21/2017 DONE
Inspection Record Card- Bld  4/21/2017 DONE
Expiration Notice4/10/20175/1/20174/10/2017 DONE
DetailsBrittany Hill
OVERRIDE  1/20/2017  
Plan assigned to (CJW)11/15/201611/15/20161/20/2017 PASS
DetailsCarl Westfall
(1st done) (Dec 5 - 15 days) (20 sheets) Convention Center Superstructure
Routing - PLAN CHECK1/19/2017 1/20/2017 PASS
DetailsCarl Westfall
Routing Off Site - STRUCTURAL1/19/2017 1/20/2017 PASS
DetailsCarl Westfall
Jared Bauder (CH2MHill)
PLANS/APPL TAKEN TO FRONT DESK  1/20/2017 DONE
Permit Ready to Issue  1/20/2017 DONE
DetailsChristina Prado
All met 4/19/17 C_P //// Need ACHD only as of 2/9 ESI Paid for the SWR and BLD BLH /// NEED ACHD, RP, GC, and certificate of value
Plan resubmittals received  1/19/2017 DONE
Routing - PLAN CHECK12/21/2016 1/4/2017 FAIL
DetailsCarl Westfall
Routing Off Site - STRUCTURAL12/22/2016 1/4/2017 FAIL
DetailsCarl Westfall
Jared Bauder (CH2MHill)
Plan resubmittals requested  1/4/2017 DONE
Plan resubmittals received  12/21/2016 DONE
Route to Impact Fee Review12/8/201612/11/201612/12/2016 PASS
DetailsCindy M. Gould
1st review completed  12/8/2016 DONE
Plan resubmittals requested  12/8/2016 DONE
Routing - PLAN CHECK11/15/2016 12/8/2016 FAIL
DetailsCarl Westfall
1st review
Routing Off Site - STRUCTURAL11/15/2016 12/7/2016 FAIL
Jared Bauder (CH2MHill)
Routing - Erosion and Sediment11/15/2016 11/18/2016 PASS
DetailsAndy J. Long
ESC plan waiver approved. Need to designate RP
Routing - PLANNING Land Div11/15/2016 11/17/2016 PASS
DetailsTodd Tucker
Routing - FIRE11/15/201611/15/201611/16/2016 PASS
DetailsKatie Marron
No comments required.
Routing - Design Review11/15/2016 11/16/2016 PASS
DetailsJosh Wilson
Routing - PUBLIC WORKS11/15/2016 11/15/2016 PASS
DetailsRachael Beierle
per Ron H interior shell framing only. TI to come. All work inside current building
Intake Approval  11/15/2016 PASS
DetailsCarl Westfall
Routing - Addressing11/15/2016 11/15/2016 PASS
DetailsLaura Hunter
Plan Reviewer's activity  11/14/2016 PASS
Plan intake approved
Intake Approval  11/7/2016 FAIL
(11-7-16) Please see the circled items in the plan intake checklist and resolve them as noted.
Application received  11/1/2016 DONE
Application submitted via PDS Online on Nov 1 2016 9:28AM