Third Notice | | 12/17/2017 | 12/20/2017 | | DONE |
|
|
|
This permit finaled on the web by Drew Moorhouse
|
Second Notice | | 11/24/2017 | 12/12/2017 | | DONE |
|
|
|
Mailed 12-13-17
|
First Notice | | 11/5/2017 | 11/14/2017 | | DONE |
|
|
|
Mailed 11-15-17
|
Permanent Occupancy | | | 10/26/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/20/2017 | | DONE |
|
|
|
|
BLD-Final | 9/21/2017 | 9/21/2017 | 9/21/2017 | P | PASS |
Jim Sly
|
|
|
Jim,
We have gotten our final on the landscape plumbing permit. we are ready to sign off our final occupancy. Please give me a call if you have any questions.
Thanks, Drew Moorhouse McCarter-Moorhouse ###-#### Phone #: ###-#### Inspection requested via web by Drew Moorhouse OK for Perm Occ.
|
BLD-Final | 9/7/2017 | 9/8/2017 | 9/8/2017 | A | PART |
Jim Sly
|
|
|
Looking for my final inspection. I would like to meet you onsite if possible. Let me know what time works best for you to meet. I appreciate your time.
Thanks, Drew Moorhouse ###-#### Phone #: ###-#### Inspection requested via web by Drew Moorhouse OK for Temp. Occ. OK for Perm Occ. when Plumbing perms.
|
Zoning Approval | 9/7/2017 | 9/7/2017 | 9/7/2017 | | DONE |
Andrea Tuning
|
|
|
|
PubWorks Occupancy Approval | 8/25/2017 | 8/25/2017 | 8/25/2017 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 8/23/2017 | 8/24/2017 | 8/24/2017 | P | NR |
Jim Sly
|
|
|
Looking for our final, lock box is on the south side of the building on the electrical transformer and the code is 1027 Phone #: ###-#### Inspection requested via web by Drew Moorhouse
|
FIRE-Final Inspection | 8/23/2017 | 8/24/2017 | 8/24/2017 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Automatic flush bolts to be provided in the in-active leaf of the main exit prior to a building inspection.
|
BLD-Wall Bracing | 5/23/2017 | 5/24/2017 | 5/25/2017 | P | PASS |
Jim Sly
|
|
|
Lock box is on the temp power pole and code is 1027 Phone #: ###-#### Inspection requested via web by Drew Moorhouse
|
BLD-Energy code compliance | 5/23/2017 | 5/24/2017 | 5/25/2017 | P | PASS |
Jim Sly
|
|
|
Lock box is on the temp power pole and code is 1027 Phone #: ###-#### Inspection requested via web by Drew Moorhouse
|
BLD-Wall Bracing | 5/18/2017 | 5/18/2017 | 5/18/2017 | P | FAIL |
Jim Sly
|
|
|
Lock Box is on the temp power pole on the south side of the building code is 1027. I added the wall bracing inspection as well. wasn''t sure if needed for sheer.
hanks, Drew Moorhouse Phone #: ###-#### Inspection requested via web by Drew Moorhouse Correction notice posted.
|
BLD-Framing/Rough-in | 5/18/2017 | 5/18/2017 | 5/18/2017 | P | PASS |
Jim Sly
|
|
|
Lock Box is on the temp power pole on the south side of the building code is 1027 Phone #: ###-#### Inspection requested via web by Drew Moorhouse
|
Meeting | | | 4/6/2017 | | DONE |
|
|
|
App J was brought in for Brian Murphy. Was done online-took to Brian Murphy
|
BLD-Foundation | 2/6/2017 | 2/6/2017 | 2/6/2017 | P | PASS |
Jim Sly
|
|
|
Dave Phone #: ###-####
|
BLD-Footing | 2/3/2017 | 2/3/2017 | 2/3/2017 | P | PASS |
Jim Sly
|
|
|
Ben Phone #: ###-####
|
Print Occupancy Form | | | 2/1/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/1/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 1/17/2017 | | |
|
|
|
|
Plan assigned to (JG) | 11/10/2016 | 11/10/2016 | 1/17/2017 | | PASS |
Javier Guzman
|
|
|
1st review completed, 12/07 Rocky Mountain Endodontics, ePlan, pend PW & Struct
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/17/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/17/2017 | | DONE |
|
|
|
Need GC Form and Revised Cert of Value
|
Routing Off Site - STRUCTURAL | 1/3/2017 | | 1/17/2017 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by KPFF engineering Jordan Terry
|
Routing PW Drainage | 1/3/2017 | | 1/17/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Design | 1/3/2017 | | 1/12/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - PLAN CHECK | 1/3/2017 | | 1/4/2017 | | PASS |
Javier Guzman
|
|
|
|
Routing - PLUMBING | 1/3/2017 | | 1/4/2017 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC.
|
Route to Impact Fee Review | 12/9/2016 | 12/12/2016 | 12/12/2016 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 12/9/2016 | | FAIL |
Javier Guzman
|
|
|
|
Routing PW Environmental | 11/10/2016 | | 12/9/2016 | | PASS |
Rick Christenson
|
|
|
Must Complete Dental Application. City's website or contact Terry Alber @ ###-####.
|
Routing - PLAN CHECK | 11/10/2016 | | 12/9/2016 | | FAIL |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 11/10/2016 | | 12/6/2016 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by KPFF engineer Jordan Terry
|
Routing PW Street Lights | 11/10/2016 | | 12/6/2016 | | PASS |
Tom Marshall
|
|
|
signed odd in ePlan w/conditions by PW Street Lights Tom Marshall
|
Routing PW Solid Waste | 11/10/2016 | | 12/1/2016 | | PASS |
|
|
|
|
Routing - MECHANICAL | 11/10/2016 | | 11/21/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING Land Div | 11/10/2016 | | 11/17/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - FIRE | 11/10/2016 | 11/10/2016 | 11/16/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing - Erosion and Sediment | 11/10/2016 | | 11/16/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Valid PD and RP designated.
|
Routing PW Drainage | 11/10/2016 | | 11/16/2016 | | FAIL |
Brian Murphy
|
|
|
needs 3 to slopes apndx j
|
Routing - Design Review | 11/10/2016 | | 11/15/2016 | | PASS |
Josh Wilson
|
|
|
|
Routing - PLUMBING | 11/10/2016 | | 11/15/2016 | | FAIL |
Bill VanDegrift
|
|
|
1) sewer and water services do not match civil, resubmit
2) mount rp's over mop sink.
3) additional cross connection protection may be required
|
Routing - PLANNING | 11/10/2016 | | 11/15/2016 | | PASS |
Cody Riddle
|
|
|
No review required
|
Intake Approval | | | 11/10/2016 | | PASS |
|
|
|
|
Routing - Addressing | 11/10/2016 | | 11/10/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 11/10/2016 | | 11/10/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Sewer Design | 11/10/2016 | | 11/10/2016 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Waste & Vent Plan is not consistent with with the sewer location shown on this site plan. Please coordinate work to match. Identify the extent of the existing sewer service installed to this pad.
|
Plan Reviewer's activity | | | 11/9/2016 | | PASS |
|
|
|
Plan intake review approved
|
Application received | | | 11/4/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 4 2016 9:31AM
|
Intake Approval | | | 11/4/2016 | | FAIL |
|
|
|
No plan intake checklist uploaded
|
Intake Approval | | | 11/4/2016 | | FAIL |
|
|
|
Please see each circled item on the plan intake checklist and resolve them as noted.
|