Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD16-04054
StatusFinaled
Name TAHOE HOMES LLC
Site Address 7094 E SKY BAR ST
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Zone B; Permit for the construction of a new 2,856 sq. ft., two story (main level 1,475 sq. ft., second level 1,381 sq. ft.) single family dwelling with 6 bedrooms, 3 and a half bathrooms, approximately 311 sq. ft. of covered patio/porch and an 841 sq. ft. attached garage per the approved plans, engineering, ResCheck, ACCA report and any notations. R-1C/DA zoning and setbacks per planning. //leg
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/5/20179/6/20179/6/2017APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
DOC - Permit Finaled9/6/20179/6/20179/6/2017PPASS
DetailsBrandon Shaw
BLD-Energy code compliance7/11/20177/14/20177/14/2017APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Framing/Rough-in7/12/20177/12/20177/12/2017PPASS
DetailsBrandon Shaw
Coeertions to wall bracing done, ok to cover exterior
BLD-Framing/Rough-in7/10/20177/12/20177/12/2017ACANC
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Wall Bracing7/10/20177/10/20177/10/2017PFAIL
DetailsBrandon Shaw
1) No city set of approved plans on site
2) Prior to exterior wall bracing inspection, felt and wire covering exterior. Can't verify nailing pattern.
BLD-Footing3/1/20173/2/20173/2/2017APASS
DetailsJim Storey
Pat Phone #: ###-####
BLD-Footing2/13/20172/14/20172/14/2017PCANC
DetailsDave Hannah
Pat Phone #: ###-####
Issue PAID IN FULL permit  12/2/2016 DONE
OVERRIDE  11/18/2016  
Inspection Record Card- Bld  11/18/2016 DONE
Telephone call  11/18/2016 DONE
called Josh to let know permit is ready and how much is owed-left message on phone
Routing - PLAN CHECK11/18/2016 11/18/2016 PASS
DetailsTisha Gallop
PLANS/APPL TAKEN TO FRONT DESK  11/18/2016 DONE
Permit Ready to Issue  11/18/2016 DONE
All Met
Plan assigned to (LEG) Tisha11/4/2016 11/18/2016 DONE
DetailsTisha Gallop
1st review 11/16; planning (non-build)
Routing - PLANNING11/17/2016 11/17/2016 PASS
DetailsJeff Lowe
Routing - PLAN CHECK11/10/2016 11/16/2016 FAIL
DetailsTisha Gallop
pending planning approval
Case Summary (BLD)  11/16/2016 DONE
1st review completed  11/16/2016 FAIL
Routing - MECHANICAL11/8/2016 11/10/2016 PASS
DetailsTroy James
Routing - PLANNING11/7/2016 11/8/2016 FAIL
DetailsJeff Lowe
curretnly under no-build
Routing - Addressing11/4/2016 11/7/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS11/4/2016 11/7/2016 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  11/4/2016 DONE
Intake Approval  11/4/2016 PASS
Recd Pcfee & Taken To Pln CK  11/4/2016 DONE
Application received 11/4/2016