BLD-Framing/Rough-in | 5/19/2017 | 5/22/2017 | 5/22/2017 | A | PASS |
Jim Sly
|
|
|
As soon as possible /// Bill Phone #: ###-####
|
BLD-Wall Bracing | 5/11/2017 | 5/11/2017 | 5/11/2017 | P | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-####
|
BLD-Footing | 4/7/2017 | 4/10/2017 | 4/10/2017 | A | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-#### Mono pour footing, wall and slab.....OK.
|
BLD-Footing | 4/4/2017 | 4/5/2017 | 4/5/2017 | A | FAIL |
Jim Sly
|
|
|
Cafco Inc Phone #: ###-#### Footing does not match what is on approved plan. wants to mono pour footing wall and slab Need to know what Boise City requires for this technique. Called Contr.
|
OVERRIDE | | | 11/7/2016 | | |
|
|
|
|
Routing Walk-In (Zoning) | 11/7/2016 | 11/7/2016 | 11/7/2016 | P | PASS |
Katelyn Menuge
|
|
|
|
Routing Walk-In (BLD) | 11/7/2016 | 11/7/2016 | 11/7/2016 | P | PASS |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 11/7/2016 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 11/7/2016 | | 11/7/2016 | | DONE |
Tisha Gallop
|
|
|
|
1st review completed | | | 11/7/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/7/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/7/2016 | | DONE |
|
|
|
NEED RP
|
Inspection Record Card- Bld | | | 11/7/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/7/2016 | | DONE |
|
|
|
|
Application received | | 11/7/2016 | | | |
|
|
|
|