Information based on query as of Friday, July 5, 2024.
Permit Information
Permit NumberBLD16-04079
StatusFinaled
Name ESI
Site Address 12142 W JOPLIN RD
Project NameBFD - Training/Safety
Customer Number 
ePlanReviewYes
Description
(BOISE FIRE DEPARTMENT – TRAINING & SAFETY BUILDING)(***GREEN CONSTRUCTION CODE USED - PRIORITY REVIEW*** ) To meet 2012 International Green Construction Code as adopted. To construct a 9,813 sq. ft. one story commercial business building and related site improvements. Scope of work includes: construction of a slab on grade concrete foundation, CMU exterior envelope walls, open web steel roof joist, steel roof decking, electrical, mechanical and plumbing work and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. Sprinklers used for area increase. This building will be fully Fire Sprinklered with an approved Fire Alarm system. System shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. Note: Special Inspections Required see form 310. Note: This building requires a Preoccupancy Commissioning Report, this report shall be submitted and accepted by the Building Official prior to issuance of the Certificate of Occupancy. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 9/15/201810/12/2018 DONE
mailed 10-15-18
Second Follow up  10/12/2018 DONE
Third Notice 8/13/20189/10/2018 DONE
mailed 9-11-18 sent letter
First Follow up  9/10/2018 DONE
Third Notice 7/15/20188/8/2018 DONE
mailed 8-10-18
Third Notice 6/16/20187/10/2018 DONE
mailed 7-11-18
Second Notice 5/20/20186/11/2018 DONE
mailed 6-12
First Notice 4/15/20185/10/2018 DONE
mailed 5-11-18
Permanent Occupancy  4/5/2018 DONE
BLD-Final4/3/20184/4/20184/4/2018APASS
DetailsJim Sly
Perm C of O Phone #: ###-#### Inspection requested via web by Chris Palmer
BLD-Final4/2/20184/2/20184/3/2018PPART
DetailsJim Sly
Late afternoon if possible Phone #: ###-#### Inspection requested via web by Chris Palmer
OK for Temp. Occ. OK for Perm Occ when Plumbing finals.
Temporary Occupancy4/3/20187/2/20184/3/2018 DONE
DetailsChristina Prado
PubWorks Occupancy Approval4/3/20184/3/20184/3/2018 DONE
DetailsTiffany Lowery
Zoning Approval4/3/20184/3/20184/3/2018 DONE
DetailsLeon Letson
BLD-Final3/29/20183/29/20183/29/2018PCANC
DetailsJim Sly
Phone #: ###-#### >> Inspection requested via web by Chris Palmer Inspection cancelled from web by: Chris Palmer
FIRE-Final Inspection3/26/20183/27/20183/27/2018APASS
DetailsTroy Cobbley
life safety passed

Phone #: ###-#### Inspection requested via web by Chris Palmer
FIRE-Final Inspection3/22/20183/23/20183/23/2018AFAIL
DetailsTroy Cobbley
Need the project related fire alarm and fire sprinkler permits finaled. All other life safety items appear ok. The address is temp. Also per the assistant chief the fire hydrant bollards and the gate access will be handled by the fire dept.


Phone #: ###-#### Inspection requested via web by Chris Palmer
BLD-Ceiling Grid Inspection1/23/20181/24/20181/24/2018PPASS
DetailsJim Sly
Grid at the Training Safety Bldg. Please coordinate with Mechanical.
Thanks! Phone #: ###-#### Inspection requested via web by Chris Palmer
BLD-Energy code compliance1/3/20181/4/20181/4/2018APASS
DetailsJim Sly
Upper walls and overhead door walls in the Apparatus Bay at the Training/Safety Bldg Phone #: ###-#### Inspection requested via web by Chris Palmer
BLD-Framing/Rough-in12/14/201712/15/201712/15/2017PPASS
DetailsJim Sly
Wall framing in the apparatus bay in the Training Bldg. Phone #: ###-#### Inspection requested via web by Chris Palmer
BLD-Energy code compliance11/29/201711/30/201711/30/2017APASS
DetailsJim Sly
Batt insulation in the Training/Safety Building Phone #: ###-#### Inspection requested via web by Chris Palmer
BLD-Energy code compliance11/20/201711/21/201711/21/2017APASS
DetailsJim Sly
Exterior wall foam insulation inspection in the Safety/Training Building. Phone #: ###-#### Inspection requested via web by Chris Palmer
BLD-Framing/Rough-in11/13/201711/14/201711/14/2017APASS
DetailsJim Sly
Fire Training and Safety Building framing inspection Phone #: ###-#### Inspection requested via web by Chris Palmer
BLD-Concrete8/16/20178/17/20178/17/2017APART
DetailsJim Sly
before 9am please rebar- david Phone #: ###-####
OK pending MTI special inspections, tests and approvals.
BLD-Other8/2/20178/3/20178/3/2017APART
DetailsJim Sly
grouting at 9:30 for CMU reinforcement - Dave Phone #: ###-####
OK pending MTI special inspection tests and approval.
BLD-Footing6/30/20177/5/20177/5/2017APART
DetailsJim Sly
Requesting 9am- Rebar for stem wall -Justin Phone #: ###-####
OK pending MTI special inspection, tests and approvals.
BLD-Footing6/22/20176/23/20176/23/2017PPART
DetailsJim Sly
Dave Perkins Phone #: ###-####
Footing for Safety Training Bldg OK pending MTI special inspections, tests and approvals.
Issue PAID IN FULL permit  3/28/2017 DONE
DetailsChristina Prado
Print Occupancy Form  3/28/2017 DONE
DetailsChristina Prado
Plan assigned to (JG)11/26/201611/26/20161/18/2017 PASS
DetailsJavier Guzman
1st review completed, BOISE FIRE DEPT. - TRAINING & SAFETY BUILDING #2
Routing - PLAN CHECK1/17/2017 1/18/2017 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  1/18/2017 DONE
Permit Ready to Issue  1/18/2017 DONE
Needs; GC Form, Revised Cert of Value, RP, ACHD
Routing - PLAN CHECK12/29/2016 1/12/2017 FAIL
DetailsJavier Guzman
Routing Off Site - STRUCTURAL12/29/2016 1/12/2017 PASS
DetailsJavier Guzman
signed off in ePlan by Stapley Engineering Jan Welch
Route to Impact Fee Review12/9/201612/12/201612/12/2016 PASS
DetailsCindy M. Gould
Routing Off Site - STRUCTURAL11/26/2016 12/9/2016 FAIL
DetailsJavier Guzman
Failed in ePlan by Stapley Engineering Jan Welch
Routing PW Environmental11/28/2016 12/9/2016 PASS
DetailsRick Christenson
1st review completed  12/9/2016 FAIL
DetailsJavier Guzman
Routing PW Drainage11/28/2016 12/7/2016 PASS
DetailsBrian Murphy
Routing - PLAN CHECK11/26/2016 12/5/2016 FAIL
DetailsJavier Guzman
Routing - MECHANICAL11/28/2016 12/1/2016 PASS
DetailsTroy James
Routing - FIRE11/26/201611/26/201611/29/2016 PASS
DetailsScott Arellano
Comments attached to case.
Routing - PLANNING11/26/2016 11/29/2016 PASS
DetailsLeon Letson
Routing - PLANNING Land Div11/26/2016 11/29/2016 PASS
DetailsTodd Tucker
Routing - Addressing11/26/2016 11/28/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS11/26/2016 11/28/2016 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment11/26/2016 11/28/2016 PASS
DetailsAndy J. Long
no seperate ESC permit required, ESC plan & site SWPPP submitted and covered with GRD-00084 & ESC16-01512
Routing PW Solid Waste11/28/2016 11/28/2016 PASS
DetailsEvan Carpenter
Solid waste is OK as planned.
Routing PW Sewer Design11/28/2016 11/28/2016 PASS
DetailsKyle S. Rosenmeyer
Add note: Contact Boise Public Works 48 hours prior to manhole work to obtain tap permit and schedule inspection.

Change manhole label from 589F1 to a number unrelated to the Boise Sewer manholes nearby (to avoid confusion). Public ownership of the sewer main will cease at manhole 589F.
Routing - PLUMBING11/26/2016 11/28/2016 PASS
DetailsBill VanDegrift
Per plan and ISPC.
Intake Approval  11/23/2016 PASS
Intake Approval  11/18/2016 FAIL
DetailsDavid Ferguson
Remove "Not for construction" from plans and make sure that all plan sheets are stamped, signed and dated.
Application received  11/7/2016 DONE
Application submitted via PDS Online on Nov 7 2016 2:55PM