BLD-Final | 1/31/2018 | 2/1/2018 | 2/1/2018 | P | PASS |
Brandon Shaw
|
|
|
Carlos Phone #: ###-####
|
DOC - Permit Finaled | 2/1/2018 | 2/1/2018 | 2/1/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Energy code compliance | 9/1/2017 | 9/1/2017 | 9/1/2017 | P | PASS |
Dave Hannah
|
|
|
Carlos Phone #: ###-####
|
BLD-Framing/Rough-in | 8/31/2017 | 9/1/2017 | 9/1/2017 | A | PASS |
Dave Hannah
|
|
|
After 9 // Carlos Phone #: ###-####
|
BLD-Framing/Rough-in | 7/18/2017 | 7/19/2017 | 7/19/2017 | A | PART |
Brandon Shaw
|
|
|
Framing for mud room anddown stairs, South West bedroom. Ok to insulate and cover these rooms only.
|
BLD-Foundation | 7/7/2017 | 7/7/2017 | 7/7/2017 | P | PART |
Tony Young
|
|
|
Stemwall/rebar-Raylin Phone #: ###-####,, work in progress,, will need to get drainage away,, or have retaining walls later for grade
|
BLD-Footing | 6/27/2017 | 6/28/2017 | 6/28/2017 | A | PASS |
Tony Young
|
|
|
Jeff Phone #: ###-####
|
PubWorks Subgrade Approval | 6/28/2017 | 6/28/2017 | 6/28/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 6/27/2017 | 6/27/2017 | 6/27/2017 | P | PEND |
Tony Young
|
|
|
Jeff Phone #: ###-####,, needs soils report
|
BLD-Footing | 6/1/2017 | 6/2/2017 | 6/2/2017 | P | NR |
Dave Hannah
|
|
|
Early PM - Jeff Phone #: ###-#### needs geo tech
|
BLD-Framing/Rough-in | 3/7/2017 | 3/9/2017 | 3/9/2017 | A | PART |
Tony Young
|
|
|
Carlos-please call to meet Phone #: ###-####,, interior bathroom area.. ok to cover
|
OVERRIDE | | | 2/27/2017 | | |
|
|
|
|
Telephone call | | | 2/27/2017 | | DONE |
|
|
|
called Carlos to let know permit is ready, how much is owed and that we need the RP
|
Issue PAID IN FULL permit | | | 2/27/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/14/2017 | | 2/27/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 2/27/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 2/27/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/27/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 2/27/2017 | | DONE |
|
|
|
met
|
Routing - Erosion and Sediment | 2/15/2017 | | 2/24/2017 | | PASS |
Andy J. Long
|
|
|
|
Routing - PLANNING | 2/15/2017 | | 2/15/2017 | | PASS |
Colleen T Carroll
|
|
|
|
Routing PW Grading-Hillside | 2/15/2017 | | 2/15/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing PW Flood Plain | 2/14/2017 | | 2/15/2017 | | PASS |
Jason C. Taylor
|
|
|
Project is not in the floodplain. No review required. JCT
|
Routing - Addressing | 2/15/2017 | | 2/15/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 2/15/2017 | | 2/15/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing Walk-In (BLD) | 2/7/2017 | 2/7/2017 | 2/7/2017 | P | FAIL |
Brian McGowan
|
|
|
Foundation plan needs to be stamped and signed by engineer. WUI Details need to be updated. ESC waiver letter required. Low slope roof materials need to be specified.
|
1st review completed | | | 2/7/2017 | | FAIL |
Brian McGowan
|
|
|
Foundation plan needs to be stamped and signed by engineer. WUI Details need to be updated. ESC waiver letter required. Low slope roof materials need to be specified.
|
Routing Walk-In (Zoning) | 2/2/2017 | 2/2/2017 | 2/2/2017 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 2/2/2017 | 2/2/2017 | 2/2/2017 | P | FAIL |
David Ferguson
|
|
|
Need more comprehensive WUI details, sections, connection details for carport and front porch.
|
Routing Walk-In (PW Hillside) | 11/8/2016 | 11/8/2016 | 11/8/2016 | A | FAIL |
Jason C. Taylor
|
|
|
need geo tech report
|
Routing Walk-In (BLD) | 11/8/2016 | 11/8/2016 | 11/8/2016 | A | FAIL |
Brian McGowan
|
|
|
Foundation needs engineering calcs and stamped and signed. Needs to meet WUI Codes. Metal post caps and poles for Entry and Carport will need special inspections and manuf. by approved manufactureres.
|
1st review completed | | | 11/8/2016 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 11/8/2016 | | 11/8/2016 | | FAIL |
Brian McGowan
|
|
|
|
Application received | | 11/8/2016 | | | |
|
|
|
|