Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD16-04117
StatusFinaled
Name BECK CONSTRUCTION INC
Site Address 1410 N HILTON ST
Project NameOrchard Place
Customer Number 
ePlanReviewYes
Description
(DEQ) This project consists of the construction of a 175 sq. ft. entry canopy at the Idaho Department of Environmental Quality (DEQ) staff entrance. Work includes the construction of four masonry columns and a roof structure with standing seam metal roofing. Exiting system shall be maintained throughout the course of construction. (Special inspections on the anchor bolts are required per ICC/ESR - 3187 & 2682) This building is fully fire sprinklered. **DAF**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 11/24/201711/21/2017 DONE
This permit finaled on the web by Gary Beck
First Notice11/2/201711/2/201711/14/2017 DONE
DetailsJim Sly
Mailed 11-15-17
BLD-Final11/2/201711/2/201711/2/2017PPASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Gary Beck
DOC - Permit Finaled11/2/201711/2/201711/2/2017PPASS
DetailsJim Sly
Zoning Approval11/1/201711/1/201711/1/2017 DONE
DetailsAndrea Tuning
FIRE-Final Inspection10/30/201710/31/201710/31/2017APASS
DetailsTroy Cobbley
Life safety passed. The structural inspector verified the combustible concealed space is filled with insulation as per revious entry and the exterior is non-combustible so no sprinklers required per NFPA13 8.15
BLD-Final10/24/201710/25/201710/25/2017ANR
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Gary Beck
Need finals for....Fire sprinkler, fire life and Zoning.
BLD-Other9/28/20179/28/20179/29/2017PPASS
DetailsJim Sly
When inspector Jim Storey approved framing inspection, he requested we call for inspection of the drywall on the soffit of the canopy structure before we covered it with metal soffit. Phone #:


###-#### Inspection requested via web by Gary Beck
Verified 2 layers 5/8 firecode rock on lid.
BLD-Framing/Rough-in8/16/20178/17/20178/17/2017APASS
DetailsJim Storey
Please call Gary @ ###-#### 30 min prior to arrival. Thanks Phone #: ###-#### Inspection requested via web by Gary Beck

[External] ORCHARD PLACE DEQ ENTRY
GB
Gary Beck
Reply all|
Today, 3:31 PM
Jim Storey; +1 more
CAUTION: This email originated from an external entity. Do not click links, or open attachments, unless you recognize the sender and know the content is safe.

RE:
ORCHARD PLACE DEQ ENTRY
1410 N. HILTON STREET
BLD 16-04117

ATTENTION Boise City Building Inspector Jim Storey


Jim,

As per our conversation earlier today and NFPA code below, we have elected to blow the attic with non combustible insulation. Per our conversation we will provide a bag blow count. As discussed we will call for a soffit inspection after type x drywall is installed per approved plans.

Thanks for your help.

Gary
Beck Construction, Inc.

NFPA 13 code sections:



8.15.7 * Exterior
Projections.

8.15.7.1

Unless the requirements of 8.15.7.2, 8.15.7.3,
or 8.15.7.4 are
met, sprinklers shall be installed under exterior projections exceeding 4 ft (1.2 m) in width.

8.15.7.2 *

Sprinklers shall be permitted to be omitted where the exterior projections are constructed with materials that are noncombustible,
limited-combustible, or fire retardant–treated wood as defined in NFPA 703.

8.15.7.3

Sprinklers shall be permitted to be omitted from below the exterior projections of combustible construction,
provided the exposed finish material on the exterior projections are noncombustible, limited-combustible, or fire retardant–treated wood as defined in NFPA 703,
and the exterior projections contain only sprinklered concealed spaces or any of the following unsprinklered combustible concealed spaces:

(1)
Combustible concealed spaces filled entirely with noncombustible insulation

(2)
Light or ordinary hazard occupancies where noncombustible or limited-combustible ceilings are directly attached to the
bottom of solid wood joists so as to create enclosed joist spaces 160 ft3 (4.5 m3)
or less in volume, including space below insulation that is laid directly on top or within the ceiling joists in an otherwise sprinklered attic [see 11.2.3.1.4(4)(d)]

(3)
Concealed spaces over isolated small exterior projections not exceeding 55 ft2 (5.1 m2)
in area

8.15.7.4

Sprinklers shall be permitted to be omitted from exterior exit corridors when the exterior walls of the corridor are
at least 50 percent open and when the corridor is entirely of noncombustible construction.

8.15.7.5 *

Sprinklers shall be installed under exterior projections greater than 2 ft (0.6 m) wide over areas where combustibles
are stored.

BLD-Foundation7/17/20177/18/20177/18/2017APASS
DetailsJim Sly
early as poss // foundaiton wall // Jay Phone #: ###-####
BLD-Footing7/17/20177/17/20177/17/2017PPART
DetailsBrandon Shaw
BLD-Footing7/11/20177/12/20177/12/2017PPASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Gary Beck
Special inspection Epoxy dowels.......rebar placement.....OK.
BLD-Conference7/6/20177/7/20177/7/2017ADONE
DetailsJim Sly
PLEASE CALL GARY @ ###-#### 30 MIN PRIOR TO ARRIVAL Phone #: ###-#### Inspection requested via web by Gary Beck
Issue PAID IN FULL permit  2/6/2017 DONE
Print Occupancy Form  2/6/2017 DONE
Plan assigned to (DAF)11/25/201611/25/201612/20/2016 DONE
DetailsDavid Ferguson
due 12/07 DEQ Entry Canopy - 1st review failed - need #310 and ESR report - also failed addressing
Routing Off Site - STRUCTURAL11/17/2016 12/20/2016 PASS
DetailsDavid Ferguson
Approved 3rd structural through ePlan
Routing - Addressing12/20/2016 12/20/2016 PASS
DetailsLaura Hunter
Routing - PLAN CHECK12/20/2016 12/20/2016 PASS
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  12/20/2016 DONE
Permit Ready to Issue  12/20/2016 DONE
received the RP still NEED: GC & rev cert of val
Need RP & GC and revised cert of value
Routing - PLAN CHECK11/17/2016 12/15/2016 FAIL
DetailsDavid Ferguson
1st review completed  12/15/2016 DONE
DetailsDavid Ferguson
Routing - PLANNING Land Div11/17/2016 11/30/2016 PASS
DetailsTodd Tucker
Plan assigned to (JG)11/17/201611/17/201611/25/2016 DEFR
DetailsJavier Guzman
12/07 DEQ Entry Canopy
Routing - FIRE11/17/201611/17/201611/18/2016 PASS
DetailsKatie Marron
Canopy is combustible, sprinkler modifications and separate permit are indicated. No affect to approved FD Access.
Routing - PLANNING11/17/2016 11/18/2016 PASS
DetailsCody Riddle
No review required
Routing - Addressing11/17/2016 11/18/2016 FAIL
DetailsLaura Hunter
Footprint of building in key plan does not match current building footprint. Needs to be updated to verify address
Routing - PUBLIC WORKS11/17/2016 11/18/2016 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment11/17/2016 11/18/2016 PASS
DetailsAndy J. Long
No ESC permit required.
Routing - Design Review11/17/2016 11/17/2016 PASS
DetailsAndrea Tuning
Intake Approval  11/17/2016 PASS
Intake Approval  11/14/2016 FAIL
Provide the verification of legal lot and parcel
Provide the zoning approval letter
Application received  11/9/2016 DONE
Application submitted via PDS Online on Nov 9 2016 2:33PM