Second Notice | | 11/24/2017 | 11/21/2017 | | DONE |
|
|
|
This permit finaled on the web by Gary Beck
|
First Notice | 11/2/2017 | 11/2/2017 | 11/14/2017 | | DONE |
Jim Sly
|
|
|
Mailed 11-15-17
|
BLD-Final | 11/2/2017 | 11/2/2017 | 11/2/2017 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Beck
|
DOC - Permit Finaled | 11/2/2017 | 11/2/2017 | 11/2/2017 | P | PASS |
Jim Sly
|
|
|
|
Zoning Approval | 11/1/2017 | 11/1/2017 | 11/1/2017 | | DONE |
Andrea Tuning
|
|
|
|
FIRE-Final Inspection | 10/30/2017 | 10/31/2017 | 10/31/2017 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. The structural inspector verified the combustible concealed space is filled with insulation as per revious entry and the exterior is non-combustible so no sprinklers required per NFPA13 8.15
|
BLD-Final | 10/24/2017 | 10/25/2017 | 10/25/2017 | A | NR |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Beck Need finals for....Fire sprinkler, fire life and Zoning.
|
BLD-Other | 9/28/2017 | 9/28/2017 | 9/29/2017 | P | PASS |
Jim Sly
|
|
|
When inspector Jim Storey approved framing inspection, he requested we call for inspection of the drywall on the soffit of the canopy structure before we covered it with metal soffit. Phone #:
###-#### Inspection requested via web by Gary Beck Verified 2 layers 5/8 firecode rock on lid.
|
BLD-Framing/Rough-in | 8/16/2017 | 8/17/2017 | 8/17/2017 | A | PASS |
Jim Storey
|
|
|
Please call Gary @ ###-#### 30 min prior to arrival. Thanks Phone #: ###-#### Inspection requested via web by Gary Beck
[External] ORCHARD PLACE DEQ ENTRY GB Gary Beck Reply all| Today, 3:31 PM Jim Storey; +1 more CAUTION: This email originated from an external entity. Do not click links, or open attachments, unless you recognize the sender and know the content is safe.
RE: ORCHARD PLACE DEQ ENTRY 1410 N. HILTON STREET BLD 16-04117 ATTENTION Boise City Building Inspector Jim Storey Jim, As per our conversation earlier today and NFPA code below, we have elected to blow the attic with non combustible insulation. Per our conversation we will provide a bag blow count. As discussed we will call for a soffit inspection after type x drywall is installed per approved plans. Thanks for your help. Gary Beck Construction, Inc. NFPA 13 code sections:
8.15.7 * Exterior Projections.
8.15.7.1
Unless the requirements of 8.15.7.2, 8.15.7.3, or 8.15.7.4 are met, sprinklers shall be installed under exterior projections exceeding 4 ft (1.2 m) in width.
8.15.7.2 *
Sprinklers shall be permitted to be omitted where the exterior projections are constructed with materials that are noncombustible, limited-combustible, or fire retardant–treated wood as defined in NFPA 703.
8.15.7.3
Sprinklers shall be permitted to be omitted from below the exterior projections of combustible construction, provided the exposed finish material on the exterior projections are noncombustible, limited-combustible, or fire retardant–treated wood as defined in NFPA 703, and the exterior projections contain only sprinklered concealed spaces or any of the following unsprinklered combustible concealed spaces:
(1) Combustible concealed spaces filled entirely with noncombustible insulation
(2) Light or ordinary hazard occupancies where noncombustible or limited-combustible ceilings are directly attached to the bottom of solid wood joists so as to create enclosed joist spaces 160 ft3 (4.5 m3) or less in volume, including space below insulation that is laid directly on top or within the ceiling joists in an otherwise sprinklered attic [see 11.2.3.1.4(4)(d)]
(3) Concealed spaces over isolated small exterior projections not exceeding 55 ft2 (5.1 m2) in area
8.15.7.4
Sprinklers shall be permitted to be omitted from exterior exit corridors when the exterior walls of the corridor are at least 50 percent open and when the corridor is entirely of noncombustible construction.
8.15.7.5 *
Sprinklers shall be installed under exterior projections greater than 2 ft (0.6 m) wide over areas where combustibles are stored.
|
BLD-Foundation | 7/17/2017 | 7/18/2017 | 7/18/2017 | A | PASS |
Jim Sly
|
|
|
early as poss // foundaiton wall // Jay Phone #: ###-####
|
BLD-Footing | 7/17/2017 | 7/17/2017 | 7/17/2017 | P | PART |
Brandon Shaw
|
|
|
|
BLD-Footing | 7/11/2017 | 7/12/2017 | 7/12/2017 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Beck Special inspection Epoxy dowels.......rebar placement.....OK.
|
BLD-Conference | 7/6/2017 | 7/7/2017 | 7/7/2017 | A | DONE |
Jim Sly
|
|
|
PLEASE CALL GARY @ ###-#### 30 MIN PRIOR TO ARRIVAL Phone #: ###-#### Inspection requested via web by Gary Beck
|
Issue PAID IN FULL permit | | | 2/6/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/6/2017 | | DONE |
|
|
|
|
Plan assigned to (DAF) | 11/25/2016 | 11/25/2016 | 12/20/2016 | | DONE |
David Ferguson
|
|
|
due 12/07 DEQ Entry Canopy - 1st review failed - need #310 and ESR report - also failed addressing
|
Routing Off Site - STRUCTURAL | 11/17/2016 | | 12/20/2016 | | PASS |
David Ferguson
|
|
|
Approved 3rd structural through ePlan
|
Routing - Addressing | 12/20/2016 | | 12/20/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PLAN CHECK | 12/20/2016 | | 12/20/2016 | | PASS |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/20/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/20/2016 | | DONE |
|
|
|
received the RP still NEED: GC & rev cert of val
Need RP & GC and revised cert of value
|
Routing - PLAN CHECK | 11/17/2016 | | 12/15/2016 | | FAIL |
David Ferguson
|
|
|
|
1st review completed | | | 12/15/2016 | | DONE |
David Ferguson
|
|
|
|
Routing - PLANNING Land Div | 11/17/2016 | | 11/30/2016 | | PASS |
Todd Tucker
|
|
|
|
Plan assigned to (JG) | 11/17/2016 | 11/17/2016 | 11/25/2016 | | DEFR |
Javier Guzman
|
|
|
12/07 DEQ Entry Canopy
|
Routing - FIRE | 11/17/2016 | 11/17/2016 | 11/18/2016 | | PASS |
Katie Marron
|
|
|
Canopy is combustible, sprinkler modifications and separate permit are indicated. No affect to approved FD Access.
|
Routing - PLANNING | 11/17/2016 | | 11/18/2016 | | PASS |
Cody Riddle
|
|
|
No review required
|
Routing - Addressing | 11/17/2016 | | 11/18/2016 | | FAIL |
Laura Hunter
|
|
|
Footprint of building in key plan does not match current building footprint. Needs to be updated to verify address
|
Routing - PUBLIC WORKS | 11/17/2016 | | 11/18/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 11/17/2016 | | 11/18/2016 | | PASS |
Andy J. Long
|
|
|
No ESC permit required.
|
Routing - Design Review | 11/17/2016 | | 11/17/2016 | | PASS |
Andrea Tuning
|
|
|
|
Intake Approval | | | 11/17/2016 | | PASS |
|
|
|
|
Intake Approval | | | 11/14/2016 | | FAIL |
|
|
|
Provide the verification of legal lot and parcel
Provide the zoning approval letter
|
Application received | | | 11/9/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 9 2016 2:33PM
|