BLD-Energy code compliance | 4/21/2017 | 4/21/2017 | 4/21/2017 | P | PASS |
Brandon Shaw
|
|
|
Insulation // Bill Phone #: ###-####
|
BLD-Framing/Rough-in | 4/18/2017 | 4/19/2017 | 4/19/2017 | A | PASS |
Jim Storey
|
|
|
Bill Phone #: ###-####
|
BLD-Framing/Rough-in | 4/17/2017 | 4/18/2017 | 4/17/2017 | A | DEFR |
Jim Storey
|
|
|
Bill Phone #: ###-####
|
BLD-Framing/Rough-in | 4/17/2017 | 4/17/2017 | 4/17/2017 | P | DEFR |
Jim Storey
|
|
|
Bill Phone #: ###-#### out of time rolled over am
|
Routing Walk-In (BLD) | 2/9/2017 | 2/9/2017 | 2/9/2017 | A | PASS |
Tisha Gallop
|
|
|
plan modification to change large beam/post/footing per engineering
|
Inspection Record Card- Bld | | | 2/9/2017 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 2/7/2017 | 2/7/2017 | 2/7/2017 | P | FAIL |
Tisha Gallop
|
|
|
contractor came in for possible modification to change size and span of large beam. Engineering is required.
|
BLD-Footing | 1/27/2017 | 1/30/2017 | 1/30/2017 | A | PASS |
Jim Storey
|
|
|
Adam-pour time noon Phone #: ###-####heat on site
|
OVERRIDE | | | 1/11/2017 | | |
|
|
|
|
Routing Walk-In (BLD) | 1/11/2017 | 1/11/2017 | 1/11/2017 | P | PASS |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/11/2017 | | DONE |
|
|
|
1 hr admin fee
|
Permit Ready to Issue | | | 1/11/2017 | | DONE |
|
|
|
plan mod ONLY - DO NOT RE-ISSUE
|
(F) Reprint permit | | | 1/11/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/11/2017 | | DONE |
|
|
|
plan mod fees paid
|
Routing Walk-In (Zoning) | 1/9/2017 | 1/9/2017 | 1/9/2017 | P | PASS |
David Moser
|
|
|
|
Routing Walk-In (BLD) | 1/9/2017 | 1/9/2017 | 1/9/2017 | P | FAIL |
David Ferguson
|
|
|
Plan Mod - recommended that he either drop it off to be routed to Tisha who did the original review or come back on Wednesday when she's scheduled to work the counter.
|
Plan Modification Accepted | | | 1/9/2017 | | |
|
|
|
|
CHANGE STATUS TO (REV) | | | 1/9/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 11/29/2016 | | |
|
|
|
|
Routing Walk-In (BLD) | 11/29/2016 | 11/29/2016 | 11/29/2016 | P | PASS |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 11/29/2016 | | 11/29/2016 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 11/29/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/29/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/29/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/29/2016 | | DONE |
|
|
|
***all requirments met 11-29-16 /CEV
need GC form and RP
|
Routing Walk-In (Zoning) | 11/10/2016 | 11/10/2016 | 11/10/2016 | A | PASS |
Celine Acord
|
|
|
|
Routing Walk-In (BLD) | 11/10/2016 | 11/10/2016 | 11/10/2016 | A | PASS |
David Ferguson
|
|
|
Drawings need more detail and possibly engineering. Removing 30 of exterior walls without enough details on the plans to show structural detail.
|
1st review completed | | | 11/10/2016 | | FAIL |
David Ferguson
|
|
|
|
Application received | | 11/10/2016 | | | |
|
|
|
|