Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD16-04152
StatusFinaled
Name TAHOE HOMES LLC
Site Address 3947 E PARKCENTER BLVD
Project NameDHE #2 BLDG 11, 4-8
Customer NumberBLD16-04149 EPLAN
ePlanReview 
Description
(4 PERMITS TOTAL FILED UNDER BLD16-04149 IN EPLANREVIEW) As per Ron Johnson, no WUI Code requirements due to being South of Parkcenter Blvd. Permit for the construction of a new 2085 sq. ft., two story (first story 1067 sq. ft., second story 1018 sq. ft.) Townhouse with 3 bedrooms, 2.5 bathrooms, approximately 48 sq. ft. of covered patio/porch and a 688 sq. ft. attached garage per the approved plans, plan review report and any notations. SP-01 zoning and setbacks per planning. **BJM**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/6/201710/6/201710/6/2017APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by joey benart
DOC - Permit Finaled10/6/201710/6/201710/6/2017PPASS
DetailsBrandon Shaw
BLD-Energy code compliance8/15/20178/15/20178/15/2017ACANC
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by joey benart
BLD-Energy code compliance8/14/20178/14/20178/15/2017PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by joey benart
BLD-Framing/Rough-in8/11/20178/11/20178/11/2017APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by joey benart
BLD-Conference6/29/20176/29/20176/29/2017PDONE
DetailsBrandon Shaw
Marriage line for gable truss and double plate- fire walls. Fire caulk seams and patch holes as discussed.
BLD-Wall Bracing6/19/20176/19/20176/19/2017PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by joey benart
Issue PAID IN FULL permit  1/30/2017 DONE
Inspection Record Card- Bld  1/30/2017 DONE
OVERRIDE  12/21/2016  
Plan assigned to (BJM)12/2/201612/2/201612/21/2016 DONE
DetailsBrian McGowan
Due 12-21 Level 2
1st review completed  12/21/2016 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  12/21/2016 DONE
DetailsBrian McGowan
Permit Ready to Issue  12/21/2016 DONE
DetailsChristina Prado
All requirements met
Routing - PLAN CHECK12/2/2016 12/21/2016 PASS
DetailsBrian McGowan
Routing - Design Review12/2/2016 12/14/2016 PASS
DetailsJosh Wilson
Appeal period expired.
Routing - MECHANICAL12/2/2016 12/2/2016 PASS
DetailsTroy James
Routing - Addressing12/2/2016 12/2/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS12/2/2016 12/2/2016 PASS
DetailsRachael Beierle
Plans ACCEPTED BY PLAN TECH  12/2/2016 DONE
Intake Approval  12/2/2016 PASS
Recd Pcfee & Taken To Pln CK  12/2/2016 DONE
Plan assigned to (LEG) Tisha12/2/2016 12/2/2016 DEFR
DetailsTisha Gallop
Application received 11/14/2016