Permit Information
Permit NumberBLD16-04158
StatusFinaled
Name BRIGHT SIDNEY C
Site Address 10423 W SOUTHERLAND DR
Project Name 
Customer Number 
ePlanReviewNo
Description
PLAN MODIFICATION TO ALLOW A MONO POURED FOOTING. 11-17-16 **DAF** Permit to build a 24'x32' (768 square foot) garage. Metal roof and metal siding is proposed. All work to be done according to plans, notes and local codes. Separate electrical permit is required. **BJM**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/10/20174/11/20174/11/2017APASS
DetailsMike Jordan
Sid Phone #: ###-####
DOC - Permit Finaled4/11/20174/11/20174/11/2017PPASS
DetailsMike Jordan
BLD-Framing/Rough-in3/27/20173/28/20173/28/2017APASS
DetailsMike Jordan
Sid Phone #: ###-####. Ok to cover.
BLD-Framing/Rough-in2/13/20172/14/20172/14/2017APART
DetailsMike Jordan
Sid Phone #: ###-####. Framing ok. Will inspect again after electrical rough in inspection.
BLD-Wall Bracing1/17/20171/18/20171/18/2017APART
DetailsMike Jordan
Sid Phone #: ###-####. block panel edges. ok to cover exterior.
BLD-Footing12/2/201612/5/201612/5/2016APASS
DetailsMike Jordan
Sid-pour time 10:30 Phone #: ###-####
OVERRIDE  12/2/2016  
CHANGE STATUS TO (ISS)  12/2/2016 DONE
as per Dave F no fees due
PLANS/APPL TAKEN TO FRONT DESK  12/2/2016 DONE
Permit Ready to Issue  12/2/2016 DONE
Routing Walk-In (BLD)11/17/201611/17/201611/17/2016PPASS
DetailsDavid Ferguson
Case Summary (BLD)  11/17/2016 DONE
DetailsDavid Ferguson
Plan Modification Accepted  11/17/2016 DONE
modification being made to foundation drawings
OVERRIDE  11/16/2016  
Routing Walk-In (BLD)11/16/201611/16/201611/16/2016ADONE
DetailsBrian McGowan
1st review completed  11/16/2016 DONE
DetailsBrian McGowan
Routing - PLAN CHECK11/16/2016 11/16/2016 PASS
DetailsBrian McGowan
Case Summary (BLD)  11/16/2016 DONE
DetailsBrian McGowan
Inspection Record Card- Bld  11/16/2016 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  11/16/2016 DONE
DetailsBrian McGowan
Permit Ready to Issue  11/16/2016 DONE
Issue PAID IN FULL permit  11/16/2016 DONE
Routing Walk-In (Zoning)11/14/201611/14/201611/14/2016PPASS
DetailsLeon Letson
Routing Walk-In (BLD)11/14/201611/14/201611/14/2016PFAIL
DetailsTisha Gallop
full engineering required for pole structure. customer might redesign as conventional construction.
1st review completed  11/14/2016 FAIL
Application received 11/14/2016