BLD-Final | 4/10/2017 | 4/11/2017 | 4/11/2017 | A | PASS |
Mike Jordan
|
|
|
Sid Phone #: ###-####
|
DOC - Permit Finaled | 4/11/2017 | 4/11/2017 | 4/11/2017 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 3/27/2017 | 3/28/2017 | 3/28/2017 | A | PASS |
Mike Jordan
|
|
|
Sid Phone #: ###-####. Ok to cover.
|
BLD-Framing/Rough-in | 2/13/2017 | 2/14/2017 | 2/14/2017 | A | PART |
Mike Jordan
|
|
|
Sid Phone #: ###-####. Framing ok. Will inspect again after electrical rough in inspection.
|
BLD-Wall Bracing | 1/17/2017 | 1/18/2017 | 1/18/2017 | A | PART |
Mike Jordan
|
|
|
Sid Phone #: ###-####. block panel edges. ok to cover exterior.
|
BLD-Footing | 12/2/2016 | 12/5/2016 | 12/5/2016 | A | PASS |
Mike Jordan
|
|
|
Sid-pour time 10:30 Phone #: ###-####
|
OVERRIDE | | | 12/2/2016 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/2/2016 | | DONE |
|
|
|
as per Dave F no fees due
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/2/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/2/2016 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 11/17/2016 | 11/17/2016 | 11/17/2016 | P | PASS |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 11/17/2016 | | DONE |
David Ferguson
|
|
|
|
Plan Modification Accepted | | | 11/17/2016 | | DONE |
|
|
|
modification being made to foundation drawings
|
OVERRIDE | | | 11/16/2016 | | |
|
|
|
|
Routing Walk-In (BLD) | 11/16/2016 | 11/16/2016 | 11/16/2016 | A | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 11/16/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 11/16/2016 | | 11/16/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 11/16/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 11/16/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/16/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 11/16/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/16/2016 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 11/14/2016 | 11/14/2016 | 11/14/2016 | P | PASS |
Leon Letson
|
|
|
|
Routing Walk-In (BLD) | 11/14/2016 | 11/14/2016 | 11/14/2016 | P | FAIL |
Tisha Gallop
|
|
|
full engineering required for pole structure. customer might redesign as conventional construction.
|
1st review completed | | | 11/14/2016 | | FAIL |
|
|
|
|
Application received | | 11/14/2016 | | | |
|
|
|
|