BLD-Final | 1/25/2018 | 1/26/2018 | 1/26/2018 | P | PASS |
Mike Jordan
|
|
|
Steve Phone #: ###-####
|
DOC - Permit Finaled | 1/26/2018 | 1/26/2018 | 1/26/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 8/14/2017 | 8/15/2017 | 8/15/2017 | A | PASS |
Mike Jordan
|
|
|
Steve Phone #: ###-####
|
BLD-Wall cover | 7/5/2017 | 7/5/2017 | 7/5/2017 | P | PASS |
Mike Jordan
|
|
|
Steve Phone #: ###-####
|
BLD-Framing/Rough-in | 7/5/2017 | 7/5/2017 | 7/5/2017 | P | PASS |
Mike Jordan
|
|
|
Steve Phone #: ###-####
|
BLD-Framing/Rough-in | 4/10/2017 | 4/11/2017 | 4/11/2017 | P | PART |
Mike Jordan
|
|
|
Steve Phone #: ###-####
|
BLD-Wall Bracing | 4/11/2017 | 4/11/2017 | 4/11/2017 | P | PASS |
Mike Jordan
|
|
|
Steve Phone #: ###-####
|
BLD-Framing/Rough-in | 4/6/2017 | 4/7/2017 | 4/7/2017 | A | NR |
Mike Jordan
|
|
|
Call half hour before // Steve Phone #: ###-####
|
BLD-Footing | 3/10/2017 | 3/13/2017 | 3/13/2017 | A | PASS |
Mike Jordan
|
|
|
Interior colimn pad footings repaired. ok to place concrete.
|
BLD-Foundation | 3/8/2017 | 3/10/2017 | 3/10/2017 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-####. Interior column pad footings. Per approved plans and engineering, 8 #4 rebar required each way. Only 5 installed.
|
BLD-Footing | 3/8/2017 | 3/9/2017 | 3/9/2017 | P | CANC |
Mike Jordan
|
|
|
Colton Phone #: ###-####
|
BLD-Energy code compliance | 3/9/2017 | 3/9/2017 | 3/9/2017 | P | PASS |
Mike Jordan
|
|
|
Colton Phone #: ###-####. rigid insulation on foundation under slab on grade.
|
OVERRIDE | | | 12/13/2016 | | |
|
|
|
|
Routing Walk-In (BLD) | 12/13/2016 | 12/13/2016 | 12/13/2016 | P | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 12/13/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 12/13/2016 | | 12/13/2016 | | PASS |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 12/13/2016 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 12/13/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/13/2016 | | DONE |
Brian McGowan
|
|
|
|
(F) Reprint permit | | | 12/13/2016 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 12/13/2016 | | |
|
|
|
|
Permit Ready to Issue | | | 12/13/2016 | | DONE |
|
|
|
plan mod ONLY - DO NOT RE-ISSUE
|
CHANGE STATUS TO (ISS) | | | 12/13/2016 | | DONE |
|
|
|
plan mod fees paid
|
BLD-Foundation | 12/5/2016 | 12/6/2016 | 12/6/2016 | A | PASS |
Mike Jordan
|
|
|
Wall // Colton Phone #: ###-####
|
BLD-Footing | 12/1/2016 | 12/2/2016 | 12/2/2016 | P | PART |
Mike Jordan
|
|
|
colton Phone #: ###-####. All issues resolved. Installing column pad rebar when on site. Ok to place concrete in footings.
|
BLD-Footing | 11/30/2016 | 12/1/2016 | 12/1/2016 | P | FAIL |
Mike Jordan
|
|
|
Colton Phone #: ###-####. Footings not per approved plans. 3" clearance issues as well.
|
OVERRIDE | | | 11/21/2016 | | |
|
|
|
|
Plan assigned to (BJM) | 11/21/2016 | 11/21/2016 | 11/21/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 11/21/2016 | | 11/21/2016 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/21/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 11/21/2016 | | DONE |
|
|
|
All Met
|
Telephone call | | | 11/21/2016 | | DONE |
|
|
|
Spoke with Steve informing him that this permit is ready to be picked up and the fee amount due for issuance
|
Issue PAID IN FULL permit | | | 11/21/2016 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/21/2016 | | DONE |
|
|
|
resubmittals have been submitted for revisions
|
Routing Walk-In (Zoning) | 11/15/2016 | 11/15/2016 | 11/15/2016 | A | PASS |
Nicolette Womack
|
|
|
Driveway cannot exceed 33' in width within the front yard setback.
|
Routing Walk-In (BLD) | 11/15/2016 | 11/15/2016 | 11/15/2016 | A | FAIL |
Brian McGowan
|
|
|
Need special Inspection Form
|
Case Summary (BLD) | | | 11/15/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 11/15/2016 | | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 11/15/2016 | | FAIL |
Brian McGowan
|
|
|
|
Application received | | 11/15/2016 | | | |
|
|
|
|