BLD-Final | 10/3/2018 | 10/3/2018 | 10/3/2018 | P | PASS |
Brandon Shaw
|
|
|
Bobbi-please call to meet for access Phone #: ###-####
|
DOC - Permit Finaled | 10/3/2018 | 10/3/2018 | 10/3/2018 | P | PASS |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 3/19/2018 | 3/19/2018 | 3/19/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Other | 12/8/2017 | 12/8/2017 | 12/8/2017 | P | CANC |
Brandon Shaw
|
|
|
Bobby-fire inspection for the garage Phone #: ###-####
|
BLD-Framing/Rough-in | 12/7/2017 | 12/8/2017 | 12/8/2017 | A | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
BLD-Framing/Rough-in | 12/7/2017 | 12/7/2017 | 12/7/2017 | P | CANC |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
BLD-Energy code compliance | 12/6/2017 | 12/6/2017 | 12/6/2017 | P | PART |
Jim Storey
|
|
|
Bob Phone #: ###-#### pending floor joist under tub/ fire aproval of garage
|
BLD-Framing/Rough-in | 12/4/2017 | 12/4/2017 | 12/4/2017 | P | PART |
Tony Young
|
|
|
Bob Phone #: ###-####,, ok to insulate,, needs final ok on sprinklers,, see Bobby for list of corrections
|
Plan Modification Accepted | | | 11/14/2017 | | DONE |
|
|
|
New manual j report
|
Routing - MECHANICAL | 11/14/2017 | | 11/14/2017 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Foundation | 6/23/2017 | 6/23/2017 | 6/23/2017 | P | PART |
Jim Sly
|
|
|
Pat Phone #: ###-#### Walls All OK ........except front stairway walls.
|
BLD-Footing | 5/22/2017 | 5/22/2017 | 5/22/2017 | P | PART |
Tony Young
|
|
|
pat Phone #: ###-####,, work in progress
|
BLD-Footing | 5/9/2017 | 5/9/2017 | 5/9/2017 | P | CANC |
Mike Jordan
|
|
|
Pat Phone #: ###-####
|
PubWorks Subgrade Approval | 4/11/2017 | 4/11/2017 | 4/11/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####
|
Issue PAID IN FULL permit | | | 3/14/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/14/2017 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 2/3/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 12/30/2016 | 12/30/2016 | 2/3/2017 | | DONE |
|
|
|
Due 1-11 - Level 2 ePlan - Fail - Need form 310, verify wall heights at patio
|
Routing - PLAN CHECK | 2/3/2017 | | 2/3/2017 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/3/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 2/3/2017 | | DONE |
|
|
|
all requirments met
|
1st review completed | | | 1/11/2017 | | FAIL |
Brian McGowan
|
|
|
Detail/section of deck required. Verify retaining wall heights around patio and retaining walls specified if needed. Special inspection forms required for steel columns and hangers..
|
Routing - PLAN CHECK | 12/23/2016 | | 1/11/2017 | | FAIL |
|
|
|
|
Routing PW Grading-Hillside | 12/23/2016 | | 1/5/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plan assigned to (LEG) Tisha | 12/23/2016 | | 12/30/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - FIRE | 12/23/2016 | 12/23/2016 | 12/27/2016 | | PASS |
Scott Arellano
|
|
|
This home is required to have a NFPA13D Fire sprinkler system per subdivision wildfire plan. Additionally per plan common space will be maintained by HOA and is included in the defensible space. (ref. CFH16-00055 Fire notes)
|
Routing - PUBLIC WORKS | 12/23/2016 | | 12/27/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 12/23/2016 | | 12/27/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Valid stormwater management team designated. Site preparation/pre-excavation inspection required.
|
Routing - MECHANICAL | 12/23/2016 | | 12/27/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 12/23/2016 | | 12/27/2016 | | PASS |
Susan Riggs
|
|
|
|
Routing - Addressing | 12/23/2016 | | 12/23/2016 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/23/2016 | | DONE |
|
|
|
|
Intake Approval | | | 12/23/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/23/2016 | | DONE |
|
|
|
|
Application received | | | 11/15/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 15 2016 9:55AM
|