BLD-Final | 2/7/2017 | 2/7/2017 | 2/7/2017 | P | PASS |
Mike Jordan
|
|
|
Bob Phone #: ###-####
|
DOC - Permit Finaled | 2/7/2017 | 2/7/2017 | 2/7/2017 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 2/3/2017 | 2/3/2017 | 2/3/2017 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-####. received new engineering. All work corrected per the new engineering.
|
BLD-Wall Bracing | 1/12/2017 | 1/12/2017 | 1/12/2017 | P | PEND |
Mike Jordan
|
|
|
bob Phone #: ###-####. Needs new drawing from engineer showing new exteror wall construction. Noted to contractor that they can proceed at there own risk.
|
BLD-Wall Bracing | 1/5/2017 | 1/9/2017 | 1/9/2017 | A | PART |
Mike Jordan
|
|
|
bob Phone #: ###-####
|
BLD-Wall Bracing | 1/5/2017 | 1/5/2017 | 1/5/2017 | P | NR |
Mike Jordan
|
|
|
Shear // Bob Phone #: ###-####. No approved plans on site.
|
BLD-Footing | 11/23/2016 | 11/28/2016 | 11/28/2016 | A | PASS |
Mike Jordan
|
|
|
Bob Phone #: ###-####
|
OVERRIDE | | | 11/15/2016 | | |
|
|
|
|
Routing Walk-In (Zoning) | 11/15/2016 | 11/15/2016 | 11/15/2016 | P | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 11/15/2016 | 11/15/2016 | 11/15/2016 | P | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 11/15/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 11/15/2016 | | 11/15/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 11/15/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 11/15/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/15/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 11/15/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/15/2016 | | DONE |
|
|
|
|
Application received | | 11/15/2016 | | | |
|
|
|
|