Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD16-04195
StatusFinaled
Name STOTT DESIGN PROPERTY RENOVATION AN
Site Address 2315 N 28TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit to demo existing Garage and remodel existing home. Garage to be built at future date, parking must be provided as per Planning. Home to consist of 2944 total square feet. 1675 square feet Main Floor with Mst. Bedroom, Mst. Bath, Powder, Kitchen, Laundry/Mudroom, Office, Dining and Family Room. 1269 square foot Upper Floor to have (4) Bedrooms and (2) Baths. Prescriptive Energy Code is proposed. Manual J to be provided prior to mechanical installation. 564 square feet of covered porch/patio. All work to be done according to plans, notes, review notes and local codes. Separate electrical, mechanical, plumbing and erosion permits are required. **BJM**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/5/20176/6/20176/6/2017APASS
DetailsTony Young
Scott; Phone #: ###-####,, c of c-o issued
DOC - Permit Finaled6/6/20176/6/20176/6/2017PPASS
DetailsTony Young
BLD-Final5/30/20176/2/20176/2/2017PCANC
DetailsMike Jordan
Scott Phone #: ###-####. Cancelled per Scott via phone call.
BLD-Energy code compliance3/20/20173/21/20173/21/2017APASS
DetailsTony Young
Scott Phone #: ###-####
BLD-Framing/Rough-in3/20/20173/20/20173/21/2017PPEND
DetailsTony Young
Scott Phone #: ###-####
BLD-Framing/Rough-in3/17/20173/20/20173/20/2017APART
DetailsTony Young
Scott Phone #: ###-####,, needs top plate strapping,, seal pack ok,, ok to insulate
BLD-Framing/Rough-in3/16/20173/17/20173/17/2017PPART
DetailsTony Young
Scott Phone #: ###-####,, needs seal package,, straps on top plates not overlapped 24"
BLD-Wall Bracing2/22/20172/23/20172/23/2017APART
DetailsTony Young
Shear // Carlos Phone #: ###-####,, exterior of house ok after minor nailing fixes
Routing - MECHANICAL2/17/2017 2/17/2017 PASS
DetailsTroy James
manual j report submitted
BLD-Foundation1/13/20171/17/20171/17/2017APART
DetailsTony Young
ADAM Phone #: ###-####
BLD-Foundation1/13/20171/13/20171/13/2017PPART
DetailsTony Young
ADAM Phone #: ###-####,, work in progress
BLD-Footing12/21/201612/22/201612/22/2016APART
DetailsTony Young
Adam Phone #: ###-####,, cold weather provisions in place
BLD-Footing12/21/201612/21/201612/21/2016PNR
DetailsTony Young
Adam Phone #: ###-####
Issue PAID IN FULL permit  11/22/2016 DONE
OVERRIDE  11/18/2016  
Telephone call  11/18/2016 DONE
Sent an email, number given dosn't work, informing Mark that this permit is ready, we need to know who the RP will be and the fee amount due for issuance. (email in documents)
1st review completed  11/18/2016 DONE
DetailsBrian McGowan
Routing - PLAN CHECK11/18/2016 11/18/2016 PASS
DetailsBrian McGowan
Case Summary (BLD)  11/18/2016 DONE
DetailsBrian McGowan
Inspection Record Card- Bld  11/18/2016 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  11/18/2016 DONE
DetailsBrian McGowan
Permit Ready to Issue  11/18/2016 DONE
**Owner being RP** Need RP
Routing Walk-In (Zoning)11/16/201611/16/201611/16/2016PPASS
DetailsJeff Lowe
add hardsurface adjacent to existing driveway for parking space. maintain 20 from front and 5 from side.
Routing Walk-In (BLD)11/16/201611/16/201611/16/2016PFAIL
DetailsBrian McGowan
Took in plans to begin review. Manual J is required, they will provide asap, before permit is issued.
Application received 11/16/2016