Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD16-04223
StatusFinaled
Name BARGREEN ELLINGSON INC
Site Address 1140 N ALLUMBAUGH ST
Project NameValley View Sr. Living - Hood
Customer Number 
ePlanReviewYes
Description
(VALLEY VIEW SENIOR LIVING – KITCHEN TYPE I HOOD AND DUCT) The fire sprinkler system is used for occupancy and for building area increase. To install a Type I grease hood and duct system within a new 169 square foot kitchen to serve an I-2 Occupancy Skilled Nursing Facility. Work is to include cutting holes in a 1-hr fire-resistance-rated floor-ceiling assembly, cutting holes in a 1-hr fire-resistance-rated roof-ceiling assembly, and structurally reinforcing the floor and roof. The grease duct and the make-up air duct are each required to be within a separate 1-hr shaft, minimum. Special Inspection required for epoxy anchors. Verification of the capacity of the floor and roof to support the new equipment is a deferred submittal item. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice11/8/201811/8/201811/8/2018 DONE
DetailsMike Jordan
This permit finaled on the web by Stephen Lee
BLD-Final11/5/201811/8/201811/8/2018PPASS
DetailsMike Jordan
Please call me when you''re expected to be on site and I will meet you there. Phone #: ###-#### Inspection requested via web by Stephen Lee
DOC - Permit Finaled11/8/201811/8/201811/8/2018PPASS
DetailsMike Jordan
All issues have been resolved. ok for final.
BLD-Conference10/31/201810/31/201810/31/2018PPASS
DetailsMike Jordan
Review of fire shaft and first layer of fire rated gypsum board. Work commences at 8:30, please call if you have time earlier to stop by. If first layer is installed, will call to have you come by an inspect. Phone #: ###-#### Inspection requested via web by Stephen Lee
BLD-Conference9/29/201810/1/201810/1/2018APASS
DetailsMike Jordan
Please call prior to arrival, I will meet you onsite. Earlier in the AM preferred. Phone #: ###-#### Inspection requested via web by Stephen Lee. Angle supports added per plan and noted special inspection reports. Ok to fire proof new supports.
BLD-Conference9/27/20189/28/20189/28/2018PCANC
DetailsMike Jordan
Please call prior to arrival and I will meet you onsite. This conference is for you to inspect the structural bracing that was just installed on 09/26/2018. Phone #: ###-#### >> Inspection requested via web by Stephen Lee Inspection cancelled from web by: Stephen Lee
BLD-Conference7/11/20187/12/20187/12/2018PDONE
DetailsMike Jordan
afternoon between 1:45 and 3:45 for review of fire shaft correction notice. Please call me before you plan on going out so I can meet you there. Phone #: ###-#### Inspection requested via web by Stephen Lee. Discussed repairs with contractor and their proposed solutions prior to moving foward.
BLD-Conference7/10/20187/11/20187/11/2018PCANC
DetailsMike Jordan
Reschedule for tomorrow afternoon between 1:45 and 3:45 for review of fire shaft correction notice. Please call me before you plan on going out so I can meet you there. Phone #: ###-#### Inspection requested via web by Stephen Lee. rescheduled for tomorow afternoon.
BLD-Conference7/10/20187/11/20187/10/2018ACANC
DetailsMike Jordan
Please call Stephen prior to heading over, I will meet you onsite. The site is available to meet between 8:45 am to 10:45 am. in the morning, if those times do not work for your schedule then we have another window between 1:45 to 3:45 in the afternoon. This is to review the fire shaft correction notice. Phone #: ###-#### >> Inspection requested via web by Stephen Lee Inspection cancelled from web by: Stephen Lee
BLD-Final5/6/20185/9/20185/9/2018AFAIL
DetailsMike Jordan
Please contact Stephen Lee when on your way, I will meet you there. Phone #: ###-#### Inspection requested via web by Stephen Lee. Provide the UL for the double wall grease duct from captive air showing 1hr. assembly and fireblock detail at penetrations. Make up air duct needs to be wrapped or in 1hr shaft for entire length. Provide UL and method for wrapping make up air duct and firestop details at penetrationns. Install all structural components as shown on Sheet A1-1.. Provide special inspection for epoxt bolting. correction notice issued.
FIRE-Final Inspection5/2/20185/3/20185/3/2018PPASS
DetailsTroy Cobbley
Life safety passed.

call on your way- Steve Phone #: ###-####
Extend Review Timeline  12/12/2017 DONE
1st approved 180 day extension per Adele. See documents
Plan assigned to (CJW)12/1/201612/1/201612/14/2016 PASS
DetailsCarl Westfall
(1st done) (Dec. 21 - 15 days) (5 sheets) Valley View Senior Living
Routing - PLAN CHECK12/13/2016 12/14/2016 PASS
DetailsCarl Westfall
Routing Off Site - STRUCTURAL12/14/2016 12/14/2016 PASS
DetailsCarl Westfall
The detail at the roof is the same as the previously approved detail for the floor. Since the only comment from the Consultant Structural Engineer was that the structural detail be placed on the drawings, the plan was not sent back to the Consultant to review the roof.
PLANS/APPL TAKEN TO FRONT DESK  12/14/2016 DONE
Permit Ready to Issue  12/14/2016 DONE
all requirements met
Issue PAID IN FULL permit  12/14/2016 DONE
Print Occupancy Form  12/14/2016 DONE
1st review completed  12/13/2016 DONE
The Owner is in a crisis and needed this project to be reviewed. It likely should have been routed to Environmental and CDHD the 1st time but was not. Approval from CDHD is a contitional of permit issuance. If Environmental had concerns they may need to be resolved after permit issuance. CJW
Plan resubmittals requested  12/13/2016 DONE
Plan resubmittals received  12/13/2016 DONE
Submitted 25 seconds before midnight
Routing - PLAN CHECK12/1/2016 12/13/2016 FAIL
DetailsCarl Westfall
1st review done
Routing - MECHANICAL12/1/2016 12/7/2016 PASS
DetailsTroy James
Routing Off Site - STRUCTURAL12/1/2016 12/6/2016 FAIL
DetailsCarl Westfall
Keith Jones
Routing - FIRE12/1/201612/1/201612/2/2016 PASS
DetailsKatie Marron
Comments attached to case
Intake Approval  12/1/2016 PASS
DetailsDavid Ferguson
Routing - Addressing12/1/2016 12/1/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS12/1/2016 12/1/2016 PASS
DetailsRachael Beierle
WEST BOISE SEWER DISTRICT
Application received  11/17/2016 DONE
Application submitted via PDS Online on Nov 17 2016 4:37PM
Routing PW Environmental    CANC
Is a grease trap required? PW did not route it to PW Environmental the 1st time.
Routing Off Site - C.D.H    CANC
Was not routed to CDHD the 1st time. Evidently this facility is not regulated by CDHD.