Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD16-04245
StatusFinaled
Name CARLSON MATERIAL HANDLING
Site Address 2965 S FEATHERLY WY
Project NameFlorida Tile
Customer Number 
ePlanReviewNo
Description
(FLORIDA TILE ** RACKING**) Permit to install up to 16 ft. high steel storage racking in an existing warehouse. This building is sprinklered for area increase. Work to include: installation of prefabricated storage racking including seismic bolting to existing slab. Approval of this permit is contingent on adhering to approved plans and engineering. The design, testing and utilization of industrial steel storage racks shall be in accordance with the RMI Specification for the Design, Testing and Utilization of Industrial Steel Storage Racks. (Special inspections on the anchor bolts are required per ICC/ESR - 1917) This building is fully fire sprinklered. **DAF**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 1/20/20172/13/2017 DONE
Mailed 2-14-17
First Notice12/29/201612/29/20161/10/2017 DONE
DetailsCandy A. Nichols
sent in mail 1-11-2017
BLD-Final12/28/201612/29/201612/29/2016PPASS
DetailsMike Jordan
Call 20 mintues before to meet // Jeff Phone #: ###-####
DOC - Permit Finaled12/29/201612/29/201612/29/2016PPASS
DetailsMike Jordan
FIRE-Final Inspection12/28/201612/29/201612/29/2016APASS
DetailsTroy Cobbley
life safety passed
Issue PAID IN FULL permit  12/12/2016 DONE
Plan assigned to (DAF)11/22/201611/22/201612/8/2016 DONE
DetailsDavid Ferguson
due 12/02 Racking Paper Level II
Routing - PLAN CHECK11/22/2016 12/8/2016 PASS
DetailsDavid Ferguson
Due 12-5
1st review completed  12/8/2016 DONE
DetailsDavid Ferguson
Case Summary (BLD)  12/8/2016 DONE
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  12/8/2016 DONE
Permit Ready to Issue  12/8/2016 DONE
***all requirments met 12-12-16 /CEV

Inspection Record Card- Bld  12/8/2016 DONE
Telephone call  12/8/2016 DONE
called Jeff to let know permit is ready and how much is owed and that he needs to sign the permit app
Routing - FIRE11/30/201611/22/201612/1/2016 PASS
DetailsKatie Marron
Comments attached to plans.
Pending Assignment by AJS11/21/2016 11/22/2016 DONE
DetailsAdele J Schaffeld-Griffin
Plans ACCEPTED BY PLAN TECH  11/21/2016 DONE
Intake Approval  11/21/2016 PASS
DetailsTim Frost
Recd Pcfee & Taken To Pln CK  11/21/2016 DONE
Application received 11/21/2016