Print Statement | | | 11/22/2017 | | DONE |
|
|
|
|
First Notice | 6/20/2017 | 6/20/2017 | 11/14/2017 | | DONE |
Jim Sly
|
|
|
Mailed 11-15-17
|
BLD-Final | 6/21/2017 | 6/21/2017 | 6/21/2017 | P | PASS |
Jim Sly
|
|
|
please final again when the fire final has been done
|
FIRE-Final Inspection | 6/21/2017 | 6/21/2017 | 6/21/2017 | P | PASS |
Jim Page
|
|
|
Final life fire safety inspection passed/complete.
|
Print Occupancy Form | | | 6/21/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/21/2017 | | DONE |
|
|
|
building final was done before the fire life safety insp-so had to change status from final to iss so i could schedule the fire life safety insp
|
Permanent Occupancy | | | 6/21/2017 | | DONE |
|
|
|
|
BLD-Final | 6/19/2017 | 6/20/2017 | 6/20/2017 | A | PASS |
Jim Sly
|
|
|
Contact Tim Boesiger if gate access is needed Phone #: ###-#### Inspection requested via web by Tim Boesiger
|
DOC - Permit Finaled | 6/20/2017 | 6/20/2017 | 6/20/2017 | P | PASS |
Jim Sly
|
|
|
|
BLD-Ceiling Grid Inspection | 5/11/2017 | 5/12/2017 | 5/12/2017 | A | PASS |
Jim Sly
|
|
|
WB WWTF Call Tim Boesiger if access gate does not open.. Maintenance Bldg.-two separate areas for inspection Phone #: ###-#### Inspection requested via web by Tim Boesiger
|
BLD-Wall cover | 4/21/2017 | 4/24/2017 | 4/24/2017 | P | CANC |
Jim Sly
|
|
|
Insulation // Tim Phone #: ###-####
|
BLD-Energy code compliance | 4/21/2017 | 4/24/2017 | 4/24/2017 | A | PART |
Jim Sly
|
|
|
Insulation // Tim Phone #: ###-#### Left note and talked to contractor......Need fire sprinkler rough-in inspection and Need proof that foam sprayed insulation meets Flame spread/ smoke dens rating of 75/450.
|
Inspection Record Card- Bld | | | 4/21/2017 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 4/19/2017 | 4/20/2017 | 4/20/2017 | P | PASS |
Jim Sly
|
|
|
Please contact Jeremy Schalk project manager at 208.869.9276 before arriving with approximate time of inspection. Jeremy can meet you the gate if needed and give access to plans. Phone #: ###-#### Inspection requested via web by Tim Boesiger
|
BLD-Wall Bracing | 4/14/2017 | 4/17/2017 | 4/17/2017 | A | PASS |
Mike Jordan
|
|
|
would like call ahead; Tim Phone #: ###-####
|
BLD-Foundation | 4/13/2017 | 4/14/2017 | 4/14/2017 | A | PASS |
Jim Sly
|
|
|
Tim Phone #: ###-#### Observed by Rick Cummings and MTI. OK pending MTI special inspections, tests and approvals.
|
BLD-Footing | 4/13/2017 | 4/14/2017 | 4/14/2017 | A | PASS |
Jim Sly
|
|
|
Tim Phone #: ###-#### Observed by Rick Cummings and MTI. OK pending MTI special inspec tions, tests and approvals.
|
Fees Due Hold | 2/22/2017 | | 3/14/2017 | | DONE |
Christina Prado
|
|
|
|
Issue & PRINT to be Invoiced | | | 2/21/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/21/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/21/2017 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 2/21/2017 | | DONE |
Rita DeYoung
|
|
|
Issued date missing.
|
OVERRIDE | | | 1/4/2017 | | |
|
|
|
|
Plan assigned to (CDM) | 12/1/2016 | 12/1/2016 | 1/4/2017 | | PASS |
Carl D Madsen
|
|
|
1st comp. Boise City Maitainance
|
Routing Off Site - STRUCTURAL | 12/30/2016 | | 1/4/2017 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/4/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/4/2017 | | DONE |
|
|
|
NEED RP, GC form, and Certificate fo value from GC
|
Routing - PLAN CHECK | 12/30/2016 | | 12/30/2016 | | PASS |
Carl D Madsen
|
|
|
|
Route to Impact Fee Review | 12/23/2016 | 12/26/2016 | 12/28/2016 | | PASS |
Cindy M. Gould
|
|
|
|
Routing Off Site - STRUCTURAL | 12/23/2016 | | 12/23/2016 | | FAIL |
Carl D Madsen
|
|
|
|
1st review completed | | | 12/23/2016 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 12/1/2016 | | 12/23/2016 | | FAIL |
Carl D Madsen
|
|
|
fail pending structural resubmittals
|
Meeting | | | 12/6/2016 | | DONE |
|
|
|
as per Bev M-plan review fees were deleted my mistake so i put them back in
|
Routing - Erosion and Sediment | 12/5/2016 | | 12/5/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Valid PD designated. RP to be provided upon contract reward.
|
Routing - PLANNING Land Div | 12/1/2016 | | 12/5/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - MECHANICAL | 12/1/2016 | | 12/5/2016 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 12/1/2016 | 12/1/2016 | 12/2/2016 | | PASS |
Scott Arellano
|
|
|
No comments attached.
|
Routing PW Drainage | 12/2/2016 | | 12/2/2016 | | PASS |
Brian Murphy
|
|
|
LESS THAN 500 FEET
|
Routing - PUBLIC WORKS | 12/1/2016 | | 12/2/2016 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 12/1/2016 | | PASS |
|
|
|
|
Routing - PLUMBING | 12/1/2016 | | 12/1/2016 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - PLANNING | 12/1/2016 | | 12/1/2016 | | PASS |
David Moser
|
|
|
|
Routing - Addressing | 12/1/2016 | | 12/1/2016 | | PASS |
Laura Hunter
|
|
|
|
Intake Approval | | | 11/23/2016 | | FAIL |
Javier Guzman
|
|
|
Please provide the following and upload the requested additional documents (Incomplete submittals will not be accepted):
1. Engineer calculations are required to signed/stamped/dated by an Idaho license engineer
2. Soils and geotech report for support of the structure stamped and signed by an Idaho licensed engineer or declare on plans the default seismic site class & soil bearing per IBC
3. A completely filled out Form #310 is required for any items requiring special inspection and needs to be signed/stamped/dated by an Idaho licensed engineer, form 310 can be found at our website at http://pds.cityofboise.org/home/documents/apps/300/
4. Planning & Zoning letter(s) of approval
|
Application received | | | 11/21/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 21 2016 4:42PM
|