Second Notice | | 12/22/2017 | 12/18/2017 | | DONE |
|
|
|
This permit finaled on the web by Kim Anderson
|
First Notice | 12/1/2017 | 12/1/2017 | 12/12/2017 | | DONE |
Jim Storey
|
|
|
Mailed 12-13-17
|
BLD-Final | 11/30/2017 | 12/1/2017 | 12/1/2017 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Kaleb Checketts
|
DOC - Permit Finaled | 12/1/2017 | 12/1/2017 | 12/1/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 11/30/2017 | 11/30/2017 | 11/30/2017 | A | DEFR |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Kaleb Checketts
|
BLD-Final | 11/30/2017 | 11/30/2017 | 11/30/2017 | P | DEFR |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Kaleb Checketts pending ele sign off
|
BLD-Final | 11/9/2017 | 11/13/2017 | 11/13/2017 | A | NR |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Kaleb Checketts open ele permit
|
BLD-Other | 9/25/2017 | 9/25/2017 | 9/25/2017 | P | PASS |
Jim Storey
|
|
|
rebar for small 5x6 conc pad // Caleb Phone #: ###-####
|
BLD-Concrete | 8/7/2017 | 8/8/2017 | 8/8/2017 | A | PASS |
Jim Storey
|
|
|
Rebar-Caleb Phone #: ###-#### w/si
|
BLD-Footing | 8/7/2017 | 8/8/2017 | 8/8/2017 | A | PASS |
Jim Storey
|
|
|
Caleb Phone #: ###-#### w/si
|
Issue PAID IN FULL permit | | | 5/3/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/3/2017 | | DONE |
|
|
|
|
Expiration Notice | 4/27/2017 | 5/18/2017 | 4/27/2017 | | DONE |
Brittany Hill
|
|
|
|
Plan assigned to (DAF) | 11/29/2016 | 11/29/2016 | 2/10/2017 | | DONE |
David Ferguson
|
|
|
due 1/09 - plan review failed - need #310 form and ICC-ESR report for anchor bolts.
|
Routing - Design Review | 2/10/2017 | | 2/10/2017 | | PASS |
Andrea Tuning
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/10/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/10/2017 | | DONE |
|
|
|
***ACHD approval attached 5-3-17 /CEV
Need ACHD ***MET 5-3-17***Needs; GC Form & Revised Cert of Value
|
Routing - PLANNING | 2/9/2017 | | 2/9/2017 | | PASS |
Leon Letson
|
|
|
|
Routing - PLANNING | 2/6/2017 | | 2/6/2017 | | FAIL |
Leon Letson
|
|
|
Comply with DR requirements for project.
|
Routing - Design Review | 1/17/2017 | | 1/17/2017 | | FAIL |
Andrea Tuning
|
|
|
To comply with the DR approval:
Submit a propogation study.
Pave or concrete the access from Ryan Street to the facility.
|
Routing - PLAN CHECK | 1/17/2017 | | 1/17/2017 | | PASS |
David Ferguson
|
|
|
|
Route to Impact Fee Review | 1/3/2017 | 1/6/2017 | 1/9/2017 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 1/3/2017 | | FAIL |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 11/29/2016 | | 1/3/2017 | | FAIL |
David Ferguson
|
|
|
|
Routing - PLANNING | 11/29/2016 | | 1/3/2017 | | FAIL |
Leon Letson
|
|
|
Comply with DR requirements for the project
|
Routing Off Site - STRUCTURAL | 11/29/2016 | | 12/12/2016 | | PASS |
David Ferguson
|
|
|
|
Routing - FIRE | 11/29/2016 | 11/29/2016 | 12/1/2016 | | PASS |
Katie Marron
|
|
|
Plans reviewed for FD Access and Hydrant availability. No comments requried.
|
Routing - PLANNING Land Div | 11/29/2016 | | 12/1/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing PW Drainage | 11/30/2016 | | 11/30/2016 | | PASS |
Brian Murphy
|
|
|
NO DRAINAGE PLAN NEEDED.
|
Routing - PUBLIC WORKS | 11/29/2016 | | 11/30/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 11/29/2016 | | 11/29/2016 | | PASS |
Andy J. Long
|
|
|
Low risk minor TI. No ESC permit required.
|
Routing - Addressing | 11/29/2016 | | 11/29/2016 | | PASS |
Laura Hunter
|
|
|
Address is 2881 S Ryan St
|
Routing - Design Review | 11/29/2016 | | 11/29/2016 | | FAIL |
Andrea Tuning
|
|
|
To comply with the Design Review approval the applicant needs to:
Submit a propagation study showing the location of existing facilities within the coverage area, and radio frequency modeling providing evidence as to why the WCF is needed at the chosen location. This documentation should show that there are no wireless facilities within 500-feet of this site.
Pave or concrete the access from the Ryan Street to the facility.
|
Intake Approval | | | 11/29/2016 | | PASS |
|
|
|
|
Application received | | | 11/22/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 22 2016 10:01AM
|
Routing - Design Review | 2/2/2017 | | | | FAIL |
|
|
|
Pave or concrete the access from Ryan Street to the facility. This should be shown on all site plans.
|
Routing - Design Review | 2/8/2017 | | | | FAIL |
|
|
|
|