Third Notice | | 2/17/2018 | 3/2/2018 | | DONE |
|
|
|
This permit finaled on the web by Noah Richter
|
Third Notice | | 1/16/2018 | 2/12/2018 | | DONE |
|
|
|
Mailed 2-13-18
|
Second Notice | | 12/22/2017 | 1/11/2018 | | DONE |
|
|
|
Mailed 1-12-18
|
First Notice | | 11/18/2017 | 12/12/2017 | | DONE |
|
|
|
Mailed 12-13-17
|
PubWorks Occupancy Approval | 11/8/2017 | 11/8/2017 | 11/8/2017 | | DONE |
Tiffany Lowery
|
|
|
|
Permanent Occupancy | | | 11/8/2017 | | DONE |
|
|
|
|
BLD-Final | 11/6/2017 | 11/7/2017 | 11/7/2017 | P | PASS |
Brandon Shaw
|
|
|
Please call ahead for access - Noah Phone #: ###-####
|
DOC - Permit Finaled | 11/7/2017 | 11/7/2017 | 11/7/2017 | P | PASS |
Brandon Shaw
|
|
|
|
FIRE-Final Inspection | 11/6/2017 | 11/7/2017 | 11/7/2017 | A | PASS |
Jim Page
|
|
|
Exit signs are in place, final life fire safety inspection passed/complete.
|
Print Occupancy Form | | | 11/7/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/7/2017 | | DONE |
|
|
|
need PW inspection and will get cert of occupancy
|
BLD-Final | 11/2/2017 | 11/3/2017 | 11/3/2017 | P | CANC |
Brandon Shaw
|
|
|
Noah Phone #: ###-####
|
FIRE-Final Inspection | 11/1/2017 | 11/2/2017 | 11/2/2017 | P | FAIL |
Troy Cobbley
|
|
|
Corrections have been made except as per plan review exit signs are required at the gates in the pool area.
Noah Phone #: ###-####
|
Plan Reviewer's activity | | | 10/27/2017 | | |
|
|
|
The exit hardware on the main door/gate has been approved per documentation provided by the contractor as it meets the requirements of section 1008.1.9.9 2012 IBC
|
FIRE-Final Inspection | 10/25/2017 | 10/26/2017 | 10/26/2017 | P | FAIL |
Troy Cobbley
|
|
|
I referred the contractor back to the plan reviewer due to questions on the review. Itmes include number of gates requiring panic hardware, door mags being used on the west side gate and possible exit signs or emergency lights in the pool area. Contractor did not have the small documents. Thumbturn dead bolts have been used on the Locker rooms where plans call for lever action. The canopy emergency lights did not work.
Please call ahead for access - Noah Phone #: ###-####
|
FIRE-Final Inspection | 10/23/2017 | 10/25/2017 | 10/25/2017 | P | CANC |
Jim Page
|
|
|
Inspection request cancelled per conversation with point of contact, Noah Phone #: ###-####. Inspection will be rescheduled for a later date.
|
BLD-Conference | 10/24/2017 | 10/24/2017 | 10/24/2017 | P | DONE |
Brandon Shaw
|
|
|
Noah Phone #: ###-####
|
BLD-Foundation | 9/7/2017 | 9/8/2017 | 9/8/2017 | A | PASS |
Brandon Shaw
|
|
|
Noah Phone #: ###-####
|
BLD-Energy code compliance | 8/10/2017 | 8/14/2017 | 8/14/2017 | A | PASS |
Brandon Shaw
|
|
|
Noah Phone #: ###-####
|
BLD-Framing/Rough-in | 8/7/2017 | 8/8/2017 | 8/8/2017 | A | PASS |
Brandon Shaw
|
|
|
Noah Phone #: ###-####
|
BLD-Wall Bracing | 6/23/2017 | 6/26/2017 | 6/26/2017 | A | PASS |
Brandon Shaw
|
|
|
|
BLD-Wall Bracing | 6/21/2017 | 6/23/2017 | 6/23/2017 | A | CANC |
Brandon Shaw
|
|
|
Noah Phone #: ###-####
|
BLD-Energy code compliance | 5/17/2017 | 5/17/2017 | 5/17/2017 | P | PART |
Brandon Shaw
|
|
|
Noah Slap insulation
|
BLD-Foundation | 4/25/2017 | 4/28/2017 | 4/28/2017 | A | PASS |
Brandon Shaw
|
|
|
Brent Phone #: ###-####
|
BLD-Footing | 4/25/2017 | 4/25/2017 | 4/25/2017 | P | PASS |
Brandon Shaw
|
|
|
Nathan Phone #: ###-####
|
BLD-Footing | 4/24/2017 | 4/25/2017 | 4/25/2017 | A | CANC |
Brandon Shaw
|
|
|
Late morning, around 11-12 - Nathan ###-####
|
Issue PAID IN FULL permit | | | 4/14/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/14/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 3/15/2017 | | |
|
|
|
|
Plan assigned to (CDM) | 3/6/2017 | 3/6/2017 | 3/15/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 3/6/2017 | | 3/15/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing - Erosion and Sediment | 3/6/2017 | | 3/15/2017 | | PASS |
Andy J. Long
|
|
|
|
Permit Ready to Issue | | | 3/15/2017 | | DONE |
Christina Prado
|
|
|
All requirements met 4/13/17 C_P //// Need ACHD, GC Form and Revised Cert of Value
|
Routing PW Flood Plain | 3/6/2017 | | 3/14/2017 | | PASS |
Jason C. Taylor
|
|
|
Pathway removed from project and will need to be resubmitted under seperate permit. JCT
|
Routing PW Drainage | 3/6/2017 | | 3/9/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing - Design Review | 3/6/2017 | | 3/8/2017 | | PASS |
Sarah Schafer
|
|
|
Approved per DRH16-00377
|
Plan resubmittals received | | | 3/6/2017 | | DONE |
|
|
|
|
Routing PW Sewer Design | 3/6/2017 | | 3/6/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - PUBLIC WORKS | 3/6/2017 | | 3/6/2017 | | PASS |
Rachael Beierle
|
|
|
|
OVERRIDE | | | 2/23/2017 | | |
|
|
|
|
Plan assigned to (CDM) | 12/19/2016 | 12/19/2016 | 2/23/2017 | | PASS |
Carl D Madsen
|
|
|
1st comp. Harris Ranch Community Center
|
Routing - PLAN CHECK | 2/21/2017 | | 2/23/2017 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/23/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/23/2017 | | DONE |
|
|
|
NEED ACHD, GC & rev cert of val 2-23-17 pdf
|
Routing PW Flood Plain | 2/21/2017 | | 2/22/2017 | | PASS |
Jason C. Taylor
|
|
|
Pathway removed from project and will need to be resubmitted under seperate permit. JCT
|
Routing - PUBLIC WORKS | 2/21/2017 | | 2/21/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLANNING Land Div | 1/18/2017 | | 2/9/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - PLAN CHECK | 1/18/2017 | | 1/25/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 1/18/2017 | | 1/25/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing PW Sewer Design | 1/19/2017 | | 1/25/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Drainage | 1/19/2017 | | 1/19/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLUMBING | 1/18/2017 | | 1/19/2017 | | PASS |
|
|
|
Per plan and ISPC.
|
Routing - PUBLIC WORKS | 1/18/2017 | | 1/19/2017 | | PASS |
Rachael Beierle
|
|
|
|
Route to Impact Fee Review | 12/23/2016 | 12/26/2016 | 12/23/2016 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 12/23/2016 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 12/5/2016 | | 12/23/2016 | | FAIL |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 12/5/2016 | | 12/23/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Routing PW Drainage | 12/5/2016 | | 12/20/2016 | | FAIL |
Brian Murphy
|
|
|
NEEDS APDX J/ M WELLPOOL AND STORMWATER IN POOL?
|
Plan assigned to (JG) | 12/5/2016 | 12/5/2016 | 12/19/2016 | | DEFR |
Javier Guzman
|
|
|
12/23 Harris Ranch Community Center ePlan
|
Routing PW Sewer Design | 12/5/2016 | | 12/15/2016 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Retain and protect existing sewer service in Public R/W. Connect to sewer service with new cleanout on private property.
|
Routing PW Solid Waste | 12/5/2016 | | 12/13/2016 | | PASS |
Evan Carpenter
|
|
|
Site approved for commercial cart solid waste service.
|
Routing PW Street Lights | 12/5/2016 | | 12/12/2016 | | PASS |
Tom Marshall
|
|
|
|
Routing - Erosion and Sediment | 12/5/2016 | | 12/8/2016 | | PASS |
Andy J. Long
|
|
|
SWPPP approved. Valid RP and PD designated. Site preparation inspection required.
|
Routing - PLANNING Land Div | 12/5/2016 | | 12/7/2016 | | FAIL |
Todd Tucker
|
|
|
This permit cannot be issued until the City Council approves a Waiver of the Development Code (SOS16-00015). This waiver allows a building permit to be issued on propert that has not been final platted.
|
Routing - MECHANICAL | 12/5/2016 | | 12/6/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 12/5/2016 | | 12/6/2016 | | PASS |
Josh Wilson
|
|
|
|
Routing - FIRE | 12/5/2016 | 12/5/2016 | 12/5/2016 | | PASS |
Katie Marron
|
|
|
No comments required. Basic Life Safety Requirements.
|
Routing - Addressing | 12/5/2016 | | 12/5/2016 | | PASS |
Laura Hunter
|
|
|
Added address for community center: 2980 S Millbrook Way
|
Routing - PUBLIC WORKS | 12/5/2016 | | 12/5/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLUMBING | 12/5/2016 | | 12/5/2016 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC.
|
Intake Approval | | | 12/5/2016 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 12/1/2016 | | PASS |
|
|
|
Plan intake review approved
|
Intake Approval | | | 11/30/2016 | | FAIL |
|
|
|
(11-30-16) See the circled items in the Plan Intake Checklist. Please resolve each item as noted. CJW
|
Application received | | | 11/23/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 23 2016 4:46PM
|
Routing - Design Review | 12/5/2016 | | | | |
Josh Wilson
|
|
|
|
Routing PW Flood Plain | 12/5/2016 | | | | |
Jim Wyllie
|
|
|
|