Information based on query as of Friday, June 21, 2024.
Permit Information
Permit NumberBLD16-04280
StatusFinaled
Name RCH CONSTRUCTION
Site Address 2980 S MILLBROOK WAY
Project NameHarris Ranch Community Center
Customer Number 
ePlanReviewYes
Description
(HARRIS RANCH COMMUNITY CENTER) Per the attached Harris Ranch letter the pool facillity is only allowed to be occupied during daylight hours. ""PLAN MODIFICATION TO REDUCE THE POOL DECK AREA, REMOVE SHADE STRUCTURES AND PARKING SEEPAGE BED"" For the construction of a new 1,456 sq. ft. community center with work to include general site work, construction of a mail building as well a building with two restrrom/shower areas and a family assisted restroom/shower room. The fixture count for the restrooms has been evaluated and approved based upon the pool and pool deck area indicated on the plans. A separate pool permit is required. The perimeter fence has also been addressed under this permit. This building is not fire sprinklered.
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 2/17/20183/2/2018 DONE
This permit finaled on the web by Noah Richter
Third Notice 1/16/20182/12/2018 DONE
Mailed 2-13-18
Second Notice 12/22/20171/11/2018 DONE
Mailed 1-12-18
First Notice 11/18/201712/12/2017 DONE
Mailed 12-13-17
PubWorks Occupancy Approval11/8/201711/8/201711/8/2017 DONE
DetailsTiffany Lowery
Permanent Occupancy  11/8/2017 DONE
BLD-Final11/6/201711/7/201711/7/2017PPASS
DetailsBrandon Shaw
Please call ahead for access - Noah Phone #: ###-####
DOC - Permit Finaled11/7/201711/7/201711/7/2017PPASS
DetailsBrandon Shaw
FIRE-Final Inspection11/6/201711/7/201711/7/2017APASS
DetailsJim Page
Exit signs are in place, final life fire safety inspection passed/complete.
Print Occupancy Form  11/7/2017 DONE
CHANGE STATUS TO (ISS)  11/7/2017 DONE
need PW inspection and will get cert of occupancy
BLD-Final11/2/201711/3/201711/3/2017PCANC
DetailsBrandon Shaw
Noah Phone #: ###-####
FIRE-Final Inspection11/1/201711/2/201711/2/2017PFAIL
DetailsTroy Cobbley
Corrections have been made except as per plan review exit signs are required at the gates in the pool area.

Noah Phone #: ###-####
Plan Reviewer's activity  10/27/2017  
The exit hardware on the main door/gate has been approved per documentation provided by the contractor as it meets the requirements of section 1008.1.9.9 2012 IBC
FIRE-Final Inspection10/25/201710/26/201710/26/2017PFAIL
DetailsTroy Cobbley
I referred the contractor back to the plan reviewer due to questions on the review. Itmes include number of gates requiring panic hardware, door mags being used on the west side gate and possible exit signs or emergency lights in the pool area. Contractor did not have the small documents. Thumbturn dead bolts have been used on the Locker rooms where plans call for lever action. The canopy emergency lights did not work.


Please call ahead for access - Noah Phone #: ###-####
FIRE-Final Inspection10/23/201710/25/201710/25/2017PCANC
DetailsJim Page
Inspection request cancelled per conversation with point of contact, Noah Phone #: ###-####. Inspection will be rescheduled for a later date.
BLD-Conference10/24/201710/24/201710/24/2017PDONE
DetailsBrandon Shaw
Noah Phone #: ###-####
BLD-Foundation9/7/20179/8/20179/8/2017APASS
DetailsBrandon Shaw
Noah Phone #: ###-####
BLD-Energy code compliance8/10/20178/14/20178/14/2017APASS
DetailsBrandon Shaw
Noah Phone #: ###-####
BLD-Framing/Rough-in8/7/20178/8/20178/8/2017APASS
DetailsBrandon Shaw
Noah Phone #: ###-####
BLD-Wall Bracing6/23/20176/26/20176/26/2017APASS
DetailsBrandon Shaw
BLD-Wall Bracing6/21/20176/23/20176/23/2017ACANC
DetailsBrandon Shaw
Noah Phone #: ###-####
BLD-Energy code compliance5/17/20175/17/20175/17/2017PPART
DetailsBrandon Shaw
Noah
Slap insulation
BLD-Foundation4/25/20174/28/20174/28/2017APASS
DetailsBrandon Shaw
Brent Phone #: ###-####
BLD-Footing4/25/20174/25/20174/25/2017PPASS
DetailsBrandon Shaw
Nathan Phone #: ###-####
BLD-Footing4/24/20174/25/20174/25/2017ACANC
DetailsBrandon Shaw
Late morning, around 11-12 - Nathan ###-####
Issue PAID IN FULL permit  4/14/2017 DONE
Inspection Record Card- Bld  4/14/2017 DONE
OVERRIDE  3/15/2017  
Plan assigned to (CDM)3/6/20173/6/20173/15/2017 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK3/6/2017 3/15/2017 PASS
DetailsCarl D Madsen
Routing - Erosion and Sediment3/6/2017 3/15/2017 PASS
DetailsAndy J. Long
Permit Ready to Issue  3/15/2017 DONE
DetailsChristina Prado
All requirements met 4/13/17 C_P //// Need ACHD, GC Form and Revised Cert of Value
Routing PW Flood Plain3/6/2017 3/14/2017 PASS
DetailsJason C. Taylor
Pathway removed from project and will need to be resubmitted under seperate permit. JCT
Routing PW Drainage3/6/2017 3/9/2017 PASS
DetailsBrian Murphy
Routing - Design Review3/6/2017 3/8/2017 PASS
DetailsSarah Schafer
Approved per DRH16-00377
Plan resubmittals received  3/6/2017 DONE
Routing PW Sewer Design3/6/2017 3/6/2017 PASS
DetailsKyle S. Rosenmeyer
Routing - PUBLIC WORKS3/6/2017 3/6/2017 PASS
DetailsRachael Beierle
OVERRIDE  2/23/2017  
Plan assigned to (CDM)12/19/201612/19/20162/23/2017 PASS
DetailsCarl D Madsen
1st comp. Harris Ranch Community Center
Routing - PLAN CHECK2/21/2017 2/23/2017 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  2/23/2017 DONE
Permit Ready to Issue  2/23/2017 DONE
NEED ACHD, GC & rev cert of val 2-23-17 pdf
Routing PW Flood Plain2/21/2017 2/22/2017 PASS
DetailsJason C. Taylor
Pathway removed from project and will need to be resubmitted under seperate permit. JCT
Routing - PUBLIC WORKS2/21/2017 2/21/2017 PASS
DetailsRachael Beierle
Routing - PLANNING Land Div1/18/2017 2/9/2017 PASS
DetailsTodd Tucker
Routing - PLAN CHECK1/18/2017 1/25/2017 PASS
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL1/18/2017 1/25/2017 PASS
DetailsCarl D Madsen
Routing PW Sewer Design1/19/2017 1/25/2017 PASS
DetailsKyle S. Rosenmeyer
Routing PW Drainage1/19/2017 1/19/2017 PASS
DetailsBrian Murphy
Routing - PLUMBING1/18/2017 1/19/2017 PASS
Details
Per plan and ISPC.
Routing - PUBLIC WORKS1/18/2017 1/19/2017 PASS
DetailsRachael Beierle
Route to Impact Fee Review12/23/201612/26/201612/23/2016 PASS
DetailsCindy M. Gould
1st review completed  12/23/2016 FAIL
Routing - PLAN CHECK12/5/2016 12/23/2016 FAIL
DetailsJavier Guzman
Routing Off Site - STRUCTURAL12/5/2016 12/23/2016 FAIL
DetailsCarl D Madsen
Routing PW Drainage12/5/2016 12/20/2016 FAIL
DetailsBrian Murphy
NEEDS APDX J/ M WELLPOOL AND STORMWATER IN POOL?
Plan assigned to (JG)12/5/201612/5/201612/19/2016 DEFR
DetailsJavier Guzman
12/23 Harris Ranch Community Center ePlan
Routing PW Sewer Design12/5/2016 12/15/2016 FAIL
DetailsKyle S. Rosenmeyer
Retain and protect existing sewer service in Public R/W. Connect to sewer service with new cleanout on private property.
Routing PW Solid Waste12/5/2016 12/13/2016 PASS
DetailsEvan Carpenter
Site approved for commercial cart solid waste service.
Routing PW Street Lights12/5/2016 12/12/2016 PASS
DetailsTom Marshall
Routing - Erosion and Sediment12/5/2016 12/8/2016 PASS
DetailsAndy J. Long
SWPPP approved. Valid RP and PD designated. Site preparation inspection required.
Routing - PLANNING Land Div12/5/2016 12/7/2016 FAIL
DetailsTodd Tucker
This permit cannot be issued until the City Council approves a Waiver of the Development Code (SOS16-00015). This waiver allows a building permit to be issued on propert that has not been final platted.
Routing - MECHANICAL12/5/2016 12/6/2016 PASS
DetailsTroy James
Routing - PLANNING12/5/2016 12/6/2016 PASS
DetailsJosh Wilson
Routing - FIRE12/5/201612/5/201612/5/2016 PASS
DetailsKatie Marron
No comments required. Basic Life Safety Requirements.
Routing - Addressing12/5/2016 12/5/2016 PASS
DetailsLaura Hunter
Added address for community center: 2980 S Millbrook Way
Routing - PUBLIC WORKS12/5/2016 12/5/2016 PASS
DetailsRachael Beierle
Routing - PLUMBING12/5/2016 12/5/2016 PASS
DetailsBill VanDegrift
Per plan and ISPC.
Intake Approval  12/5/2016 PASS
Plan Reviewer's activity  12/1/2016 PASS
Plan intake review approved
Intake Approval  11/30/2016 FAIL
(11-30-16) See the circled items in the Plan Intake Checklist. Please resolve each item as noted. CJW
Application received  11/23/2016 DONE
Application submitted via PDS Online on Nov 23 2016 4:46PM
Routing - Design Review12/5/2016    
DetailsJosh Wilson
Routing PW Flood Plain12/5/2016    
DetailsJim Wyllie