Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD16-04306
StatusFinaled
Name DOUG LASHER CONSTRUCTION
Site Address 3379 E WINDSONG DR
Project Name 
Customer Number 
ePlanReviewNo
Description
Plan modification 4/28/17 to modify several structural design elements (shearwalls) per the revised engineered plan sheets and structural calculations. ** WUI Zone A - Class "A" Roof Required ** Permit for the construction of a new 4,563 sq. ft., one story with a finished basement of 1,874 sq. ft. and unfinished basement of 418 sq. ft. (first story 2,291 sq. ft., 1,874 sq. ft. finished basement) single family dwelling with 6 bedrooms, 3 bathrooms, approximately 400 sq. ft. of covered patio/porch and a 938 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1A/DA zoning and setbacks per planning. **DAF** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/7/20178/8/20178/8/2017APASS
DetailsBrandon Shaw
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch
DOC - Permit Finaled8/8/20178/8/20178/8/2017PPASS
DetailsBrandon Shaw
BLD-Final8/4/20178/7/20178/7/2017PNR
DetailsBrandon Shaw
Call 30 minutes prior so I can open the house for you Phone #: ###-#### Inspection requested via web by bryan murdoch
PubWorks Occupancy Approval8/7/20178/7/20178/7/2017 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Energy code compliance5/8/20175/9/20175/9/2017APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Framing/Rough-in5/5/20175/8/20175/8/2017APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Wall Bracing5/5/20175/8/20175/8/2017APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Framing/Rough-in5/5/20175/5/20175/5/2017PCANC
DetailsBrandon Shaw
Phone #: ###-#### >> Inspection requested via web by bryan murdoch Inspection cancelled from web by: bryan murdoch
BLD-Wall Bracing5/5/20175/5/20175/5/2017PCANC
DetailsBrandon Shaw
Phone #: ###-#### >> Inspection requested via web by bryan murdoch Inspection cancelled from web by: bryan murdoch
BLD-Framing/Rough-in5/3/20175/4/20175/4/2017AFAIL
DetailsBrandon Shaw
Shear straps are back ordered so I want to get inspected in the meantime Phone #: ###-#### Inspection requested via web by bryan murdoch
Trusses on main floor only, not per nailing schedule. Don't cover exterior or insulate.
BLD-Wall Bracing5/1/20175/2/20175/2/2017APART
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by bryan murdoch
CHANGE STATUS TO (ISS)  5/1/2017 DONE
Plan Mod
(F) Reprint permit  5/1/2017 DONE
OVERRIDE  4/28/2017  
Telephone call  4/28/2017 DONE
Left a message on the companies answering machine stating the plan mod was ready and the fee amount due
Routing - PLAN CHECK4/28/2017 4/28/2017 PASS
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  4/28/2017 DONE
Case Summary (BLD)  4/28/2017 DONE
DetailsDavid Ferguson
Inspection Record Card- Bld  4/28/2017 DONE
Permit Ready to Issue  4/28/2017 DONE
DO NOT REISSUE PLAN MOD
Plan Modification Accepted  4/27/2017 DONE
plan mod received 2 of each-engineers struc calcs, sheet A-102 & A-103-took to Dave F
BLD-Wall Bracing4/17/20174/17/20174/17/2017PFAIL
DetailsBrandon Shaw
Also Mike the framer has a couple of questions. He will be there all day Phone #: ###-#### Inspection requested via web by bryan murdoch
Builder to submit re-engineered sheer wall plans to city before proceeding.
BLD-Foundation2/24/20172/27/20172/27/2017APASS
DetailsJim Sly
Eric Williams Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Footing2/16/20172/17/20172/17/2017APASS
DetailsTony Young
Eric Williams Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Footing2/15/20172/16/20172/16/2017PNR
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by bryan murdoch needs hill side sign off
PubWorks Subgrade Approval2/16/20172/16/20172/16/2017 DONE
DetailsJason C. Taylor
***Entire building pad***no columns**A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  2/10/2017 DONE
OVERRIDE  1/23/2017  
Plan assigned to (DAF)12/2/201612/2/20161/23/2017 DONE
DetailsDavid Ferguson
due 12/16 plan review failed - needs tall wall engineering and clarification of the unfinished basement area.
Inspection Record Card- Bld  1/23/2017 DONE
Telephone call  1/23/2017 DONE
Left a message for Doug informing him that this permit is ready and the fee amount due for issuance
Plan resubmittals received  1/23/2017 DONE
resubmittals received 2 sheets of ME-01-took to DAve F
Routing - PLAN CHECK1/23/2017 1/23/2017 PASS
DetailsDavid Ferguson
Case Summary (BLD)  1/23/2017 DONE
DetailsDavid Ferguson
Permit Ready to Issue  1/23/2017 DONE
met
Routing - PLAN CHECK1/5/2017 1/6/2017 FAIL
DetailsDavid Ferguson
Routing - MECHANICAL1/5/2017 1/5/2017 PASS
DetailsChad Schwendiman
Revised manual J
Plan resubmittals received  1/5/2017 DONE
received resubmittals needed for review
Routing - Erosion and Sediment12/23/2016 12/27/2016 PASS
DetailsAndy J. Long
ESC plan with narrative and site map approved. Valid RP and PD designated. Site preparation inspection required.
Routing - PLAN CHECK12/8/2016 12/23/2016 FAIL
DetailsDavid Ferguson
Routing PW Grading-Hillside12/23/2016 12/23/2016 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - PUBLIC WORKS12/23/2016 12/23/2016 PASS
DetailsMorgan Webb
1st review completed  12/23/2016 FAIL
DetailsDavid Ferguson
Routing - FIRE 11/29/201612/8/2016 PASS
DetailsScott Arellano
All portions of this structure shall comply with the provisions of BMC 7-01-69 section 4920 for defensible space and are subject to Fire Department inspection.
Routing - MECHANICAL12/2/2016 12/7/2016 PASS
DetailsTroy James
Routing - PLANNING12/1/2016 12/2/2016 PASS
DetailsSue Cummings
Plan assigned to (LEG) Tisha11/29/2016 12/2/2016 DEFR
DetailsTisha Gallop
Routing PW Grading-Hillside11/29/2016 12/1/2016 FAIL
DetailsJason C. Taylor
Need revised grading plan. See email dated 12/1/2016. JCT
Routing - PUBLIC WORKS12/1/2016 12/1/2016 FAIL
DetailsMorgan Webb
See Jason Taylor for Fail
Plan resubmittals received  12/1/2016 DONE
received 3 copies of sheet C1-gave to Tisha
Routing - Addressing11/29/2016 11/29/2016 PASS
DetailsLaura Hunter
Routing PW Sewer Rating11/29/2016 11/29/2016 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  11/29/2016 DONE
Intake Approval  11/29/2016 PASS
Recd Pcfee & Taken To Pln CK  11/29/2016 DONE
Application received 11/29/2016